經電阻接地的 的英文怎麼說

中文拼音 [jīngdiànjiēdede]
經電阻接地的 英文
resistance grounded
  • : 經動詞[紡織] (把紡好的紗或線梳整成經紗或經線) warp
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 動詞(阻擋; 阻礙) block; hinder; impede; obstruct
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 4次方是 The fourth power of 2 is direction
  • 電阻 : (物質阻礙電流通過的性質) resistance; electric resistance (電路中兩點間在一定壓力下決定電流強度...
  • 接地 : [電學] landing; body; ground connection; electrical grounding; grounding; earthing; earth; ground...
  1. By analyses and compares, the conclusion is that it would be better to choose high resistance grounding of distribution transformer for hydro turbine in hydro power station. there is no certain conclusion for steam turbine in fossil - fired power plant. getting a clear answer to choose good generator grounding mode still needs practice and time

    分析比較認為,在水站水輪發機組宜選用變高方式;在火廠和熱廠汽輪發機組,選用何種方式,給出明確結論尚需理論和實踐進一步深入。
  2. The problem about neutral - point - grounding mode is an all - around technical problem which associated with not only power system reliability , insulation coordination , electromagnetic interference , but assault safety 。 in china , the neutral grounding modes of the 10kv net involved of none grounding, grounding by arc suppressing coils, resistance grounding or reactance grounding in the past 。 with the development of civic power network , low resistance grounding mode was used to restrain the over voltage, particularly in guangzhou, shanghai , beijing , and zhuhai etc. it was reported that the over - voltage level of low resistance grounding mode is lower than that of arc suppressing coil mode, but the operation carried out the other way 。 at substations in guangzhou and shanghai it was found that the low resistance grounding mode is successful 。 but in some areas , such as zhuhai , substations grounding with low resistance revealed some problems , including power supply reliability rapidly dropping , transmitting line often tripping ; and person safety being threatened 。 so interiorly the grounding mode selection of the 10kv network was disputed, which mainly focused on the fault form of 10kv net grounding, the apply area of suppressing arcing coil grounding mode, power supply reliability level of the two modes, person safety, communication interfere and the workload of maintenance

    爭議點主要是在10kv故障形式、消弧線圈應用范圍、兩種運行方式供可靠性高低、人身安全、通訊干擾和運行維護工作量等諸多方面。 11 17本論文就是針對以纜為主城區10kv網中性點方式選擇問題進行研究。論文首先對10kv中性點運行各種方式進行分析,比較各方式特點,然後以重慶儲奇門變站10kv實際參數來建立數值計算模型,在考慮了流變化、中性點取值大小、值變化等多種影響因素情況下,對中性點消弧線圈方式下壓水平和點短路流大小進行了數值計算,其計算結果與科院所作現場試驗進行了比較。
  3. Then we set up the model of rectangle - shape pipeline. we compare it to circuit - shape pipeline on sides of the value of induced electromotive force, pressure loss when liquid flow trough the pipeline and resistance ' s value of the sensor. we get the result that we can finish the measurement of low - velocity flow by using the rectangle - shape pipeline

    著對矩形測量導管進行建模,並在流體流矩形測量導管時產生感應動勢大小、流體在測量導管中壓力損失和傳感器內大小對輸出信號影響等幾個方面與圓形測量導管進行比較后得出採用矩形測量導管完全能夠有效完成微流量測量。
  4. In the deregulated power market , the power grid operator is facing many uncertainty and risks risk concept , risk analysis approach and risk management are introduced in chapter ii , the maj or risks of grid operators is analyzed and evaluated in details based on the real situation and data of yueyang city, hunan province , the economic risk resulting from the uncertainty of load prediction of whole system , generation capacity and parallel quantity of the large enterprises self - owned power plant are analyzed meanwhile , the increase of large enterprises self - owned power plant may cause economic and security risks considering different risk , the qualitmive and quantitative approaches are respectively adopted the direct and indirect congestion risks are evaluated based on probabilistic theory and decision theory the retail pricing and trade modes are major areas embracing risks as well chapter iii divides the risks in internal and external ones based on the characteristics of risk and put forward the layered risk management approach

    詳細分析和論述了營企業面臨各種風險。基於湖南省岳陽力市場實際情況和多年歷史數據,採用定性分析和定量計算手段具體分析了負荷、自備廠發量和上網量預測不確定性以及自備大量增加給網企業帶來濟性風險和安全性風險。無論是長期還是短期,塞不僅會對網造成直風險,還可能造成間風險。
  5. Interconnection generates in 1994, when china union was founded. with the development of telecommunication industry, interconnection presents different states, at the beginning, it ’ s the problem of weak & delay signal because of the telegraphic network ’ s low quality, then it becomes the situation of connected but influent, by 2003, it badly deteriorated while both sides destroyed the cable, interdicted communications by people, so people focus on interconnection

    互聯互通問題早期表現為因信網本身質量問題而導致網間信號不好、簡訊延時等;著,發展為固網、移動網之間,本網、 ip長途網之間不時出現不通、不暢等問題;而在2002年、 2003年問題已嚴重到互相砍斷傳輸纜、人為斷網間通信等惡性事件連發生。
  6. 618 method of ground connection resistance measurement is proposed. the effect of some cutting down resistance methods based on theory and practice are researched, large quantities of experiments that affect ground connection resistance have been completed, authentic and reliable data are obtained, conclusion of cutting down the ground connection system resistance of aerospace experiments are drawn. power distribution mode in measurement factory building is explored

    測量方法,提出了0 . 618法;對降低方法,從理論和實踐兩方面研究幾種降方法效果,並就測量和各種影響因素開展了大量實驗,獲得真實可靠數據,在此基礎上開展了進一步研究,為降低航天試驗用系統提供了有益工程實踐驗和結論。
  7. Recurring to rnathematic figure and examples and aiming at such questions as unbalanced current and induced voltage and high frequency interference, this paper has not only researched anti - jamming ability and measuring process of both three - electrode method and four - electrode method which are combined with reverse phase method, but also summarized actual measuring experiences

    通過數學推導和實例,圍繞消除網不平衡流、壓極流極引線問互感壓、高頻干擾等問題,分析了三極法、四極法結合倒相法測量抗干擾能力和測量過程,並總結了實際測試驗。
  8. On the other hand, how to decrease the grounding resistance economically and effectively in a limited area with high soil resistivity becomes an important question of power system for discussion

    同時,在網面積有限,土壤率較高等復雜情況下,如何濟、有效減小也成為力系統十分關注課題。
分享友人