綜合布線部 的英文怎麼說
中文拼音 [zōnggěbùxiànbù]
綜合布線部
英文
hubbell premise wiring- 綜 : 綜名詞[紡織] (織布機上使 經線交錯著上下分開以便梭子通過的裝置; 綜片) heddle; heald
- 合 : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
- 線 : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
- 部 : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
- 綜合 : 1 (歸在一起; 聯合成一個統一的整體) synthesize 2 (不同種類、不同性質的事物組合在一起) syntheti...
-
On one hand, the focal point that the interface circuit is designed lies in lining up the arrangement of the aerial data, have adopted one pair of ports ram to cooperate with the counter and realize the lining up of the data, on the other hand, interface focal point that circuit design transmission of data, part this finish mainly and interface of linkport of dsp, make data transmisst to dsp processor at a high speed, go on follow - up punish
一方面,介面電路設計的重點在於對天線數據的整理排隊,採用了雙埠ram配合計數器實現數據的排隊,另一方面,介面電路設計的重點是數據的傳輸,這部分主要完成和dsp的linkport的介面,使數據高速傳給dsp處理器,進行后續處理。這個項目按照自上而下的設計流程,從系統劃分、編寫代碼、 rtl模擬、綜合、布局布線,到fpga實現。Telecommunication generic cabling system for building part 1 : generic specification
大樓通信綜合布線系統第1部分:總規范Telecommunication generic cabling system for building part 2 : cable requirements for generic cabling
大樓通信綜合布線系統第2部分:綜合布線用電纜光纜技術要求According to the mis configuration and flows, dfmis - 1 software system has been programmed which is composed of inventory management subsystem, purchasing management subsystem and manufacturing schedule management subsystem. through studying deeply manufacturing schedule management, we find a way to make mrpii and jit be jointed together into manufacturing schedule and monitoring block. the study discusses especially how to make certain the producing period of all of component during dynamic manufacturing with methods of jit and " electronic bulletin ", how to get true capability of implementing plans in all working procedure section, and how to empower monitoring manufacturing in order to avoiding break between working procedure sections
其中一項就是設計並實施了整個公司的網路綜合布線和計算機系統的配置;第二項是根據公司最急需的功能,從「信息流」 、 「物流」和「資金流」的角度,提出了相適應的mis結構和流程,據此開發出具有庫存、采購和生產計劃管理功能的dfmis - 1軟體系統,並對其中的生產計劃管理模塊進行了較深入的研究,實現了mrpii和jit在生產計劃、生產監督上的結合和應用,特別對利用jit及其「電子看板」在生產動態中確定零部件的生產周期、獲得各工序段實際執行計劃的能力,以及在加強生產監督、避免各工序之間的脫節上做了進一步的探討。At present, the product line provided by schneider electric, such as low voltage electric distribution, final low voltage electric distribution, vdi and wd products in merlin gerin brand, as well as the building automation system in tac brand, have covered all the needs in the building electric distribution and automation. with its more personalized design concept and high - tech innovative products, schneider electric will continuously concentrate on the innovation and provide qualified product and service to chinese r. e
目前施耐德電氣旗下的梅蘭日蘭品牌的低壓及低壓終端配電、綜合智能布線、面板開關產品和tac品牌的樓宇自控產品已經涵蓋了樓宇配電和自動化的全部需求,並將不斷創新,以更為人性化的設計理念和更高科技含量的創新產品服務于中國的房地產市場。The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad, and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure, which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method, which combined linear programming and the principle of full restriction, through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof, horizontal parallel steel truss with local cables, horizontal parallel steel truss with global cable, and ultra - static steel truss, the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss, and the results showed that the local cable only unloaded the second girders, but had no response on the first girders and stomach poles, while global cable could unload the second girders and the stomach poles outside of turning point of cable, thus proving that global cable is more economic than local - cable
本文的主要工作是:對國內外預應力鋼結構的發展歷史及現狀作了綜述和總結,指出當前預應力鋼結構工程實踐中存在的主要問題;闡述了預應力鋼結構的受力機理,並指出預應力鋼結構的適用范圍和特點;在考慮結構應力和變位約束的條件下,建立預應力鋼結構優化設計模型;提出多次預應力鋼結構優化設計方法和步驟,採用線性規劃和滿約束準則相結合的優化方法,可優化設計出施加的每一級預應力的大小,並得到結構各部分的優化截面;對多次預應力最佳的施加次數作了分析,並建議以2 3次為宜;為驗證文中理論和方法,分別對大跨多次預應力鋼屋架、局部布索的水平平行弦鋼桁架、整體布索的水平平行弦鋼桁架和局部布索的超靜定鋼桁架等算例進行了優化設計,經濟效益明顯;對水平平行弦鋼桁架的幾種施加預應力的方案進行比較,對于局部布索,預應力只對下弦起到卸載作用,對上弦和腹桿基本不起作用;而整體布索預應力除對下弦卸載外,對索折點以外部分腹桿也起到卸載作用,經濟效益好於局部布索。Comprehensive arrangement the location of kitchen & toilet in the house, rational division of the space of the kitchen & toilet ( eg. it is necessary to separate the dry from humid space in toilet, the clean from contaminated space in kitchen ), it is emphasized that decent space for kitchen & toilet and some flexible space is advocated in the design, the appurtenances arrangement should be coped with the human engineer, it is better to design pipe well and equipment layer to accommodate the various meters, wires and pipes. in order to save energy and water, it is recommend to use solar energy and the different quality water
本著「以人為本」的設計思想,提出適宜經濟適用住宅的整體廚衛設計思路和方法,即:綜合協調廚衛在住宅中的位置;對廚衛空間進行合理分隔(衛生間干濕分離,廚房潔污分離) ;廚衛各空間必須具有適宜的空間尺度和面積保障,並提倡具備一定的面積彈性設計;依據人體工效學原理進行廚衛部分設備的綜合布局;利用管道井、設備層綜合布局各種管線儀表;採用分質供水設計系統和太陽能供能系統,達到節水節能;注重廚衛的排煙通風設計,提高室內環境質量;考慮廚衛的適應能力,注重通用設計。As the second american cabling products manufacturer coming to china market in 1990 ' s just later than lucent ( which had separated its cabling industry to at & t and then to avaya ), since at that time there were no foreign and domestic competitors, amp made great success and developed its business very fast
安普( amp )是繼朗訊(其綜合布線部門以後陸續隸屬于at & t和avaya )之後於二十世紀九十年代初期率先進入中國大陸市場的美國綜合布線廠商。由於當時缺乏強有力的國內、外競爭對手,朗訊和安普迅速占領了國內市場,業務發展很快。With the increase and development of intelligent architecture, from intelligent building to intelligent digital district, the scale of gcs is huger and huger, so the maintenance and management of these pipes and physical components is more and more important
隨著智能建築的不斷進步和發展,已經從智能大廈向數字園區發展,綜合布線系統的規模也就越來越龐大,對于這些管線和物理部件的維護和管理也就越發顯得重要。In new state standard < < machining center testing items - accuracy testing > > [ refering to iso / dis10791 ], issued in 1999, the test of straightness accuracy has been changed. now it becomes more scientific and reasonable. in old state standard, the testing of straightness accuracy of kinetic part only focus on vertical and " horizontal plane, and it only includes two linear errors ; but in new state standard, we not only measure those two linear errors, but also measure the errors of pitching, deflecting, and inclining of the kinetic part, so it includes two linear errors and three angle errors
1999年公布的國標《加工中心檢驗條件?精度檢驗》 (參照iso dis10791訂)中,直線度等項的檢測做了更為科學的實質性更改,坐標移動的直線度以由只檢測垂直面和水平面內的兩個平移線值誤差,改為用移動坐標方向之外的另兩個坐標的平移線值誤差和移動部件繞三個坐標軸的俯仰,偏擺和傾斜三個角值誤差綜合表徵。Information technology - generic cabling systems - part 1 : general requirements and office aeras
信息技術.綜合電纜布線系統.第1部分:一般要求和辦公區Then has analysed function 、 port joining 、 inside structure of every module, etc. in detail. using hardware description language to program for function implementation, after function simulation 、 synthesis 、 place and route 、 timing simulation and download, the design is implemented in the spartan 3 serial xc3s400 - 4pq208 chips of xilinx. all procedure of design is worked under the ise 6. 2 integrated environment
接著詳細分析了各模塊的功能、埠連接、內部結構等,並利用硬體描述語言編寫源代碼實現各模塊功能,經過功能模擬、綜合、布局布線、時序模擬、下載等一系列步驟,最終在xilinx的spartan3系列xc3s400 - 4pq208晶元上實現。Pds ( premises distribution system ) is the importante part of the aptitude architecture, and is the combinative production of both architecture technology and information technology
綜合布線系統是智能大廈的重要組成部分,是建築技術與信息技術相結合的產物,是不同布線子系統構成的一個有機整體。The part of system design gives the selecting type principle of the products and type and characteristic of domestic and international advanced premises distribution system products. the design of each subsystem gets off the detail plan of design
系統設計部分給出了產品的選型原則,以及國內外生產的先進的綜合布線系統產品類型和特點,各個子系統的設計給出了詳細的設計方案。Telecommunication generic cabling system for building part 3 : connecting hardware requirements for generic cabling
大樓通信綜合布線系統第3部分:綜合布線用連接硬體技術要求In the training organized in beijing, shanghai and guangzhou, business manager and senior engineers of vdi department give an in - depth and professional explanation, dozens of business managers from the partners participate in the training. schneider electric and channel partners have conducted a detail communications and discussions on the cabling system and the market cooperation, a great number of partners arrange related person to attend the following cabling training courses to earn more technical knowledge
在此次三地舉行的培訓上,來自施耐德電氣vdi事業部的負責人和高級工程師提供了深入、專業的講解,數十位合作夥伴業務負責人參加了培訓。施耐德電氣和渠道夥伴對綜合布線系統和市場合作進行了充分的溝通和探討,相當一部分合作夥伴還紛紛安排相關人員參加了隨后的技術專題課程,為向用戶提供梅蘭日蘭infra +這一優質的綜合布線產品以及工程系統服務,建立了很好的業務基礎。The paper is composed by three parts ; we ' ll introduce the background of ic design in the first part, which also covers the developing in domestic and foreign industry ; the whole flow of digital ic backend design will be presented detailed in the second part ; the last part will summarize the paper, as well as discuss the future work
這篇論文主要包括如下三個部分:第一部分為緒論,主要關于國內外行業相關背景,以及課題背景;第二部分為數字後端設計開發過程,分為設計的初始化,時序設置,晶元布局,標準單元擺放,時鐘樹綜合,繞線,物理驗證。分享友人