維修性預計 的英文怎麼說

中文拼音 [wéixiūxìng]
維修性預計 英文
maintainability predication
  • : Ⅰ動詞1 (連接) tie up; hold together; link 2 (保持; 保全) maintain; safeguard; preserve; keep ...
  • : Ⅰ動詞1 (修飾) embellish; decorate 2 (修理; 整治) repair; mend; overhaul 3 (寫; 編寫) write;...
  • : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 維修 : keep in (good) repair; service; maintain
  • 預計 : estimate; calculate in advance; expect
  1. This paper takes mobile engineering department equipment management of daqing petrochemical parent company as an example, and studies the design and application of equipment management system of daqing petrochemical parent company, for the implement of computerizing the equipment entire process management with the equipment management system and completing the synthesis management, the records management, the expense management, the fixed asset management, the specialized management and the information management with the computer system and making in the manual management some qualitative and stochastic ingredients transforming into the quantitative standard management. so it guarantees that we can perform advanced predicting management in the entire process of the matter movement and the value movement of equipment and complete the equipment servicing transition from the compulsory servicing and afterwards servicing to the preventive servicing, improving work quality, efficiency and modernized degree which the equipment manages and assisting enterprise ’ s equipment management decision - making and the whole realization of management goal and enhancing the enterprise ’ s interior equipment utilization and realizing its maximum profit

    本文以大慶石化總廠機動工程部的設備管理為例,對大慶石化總廠設備管理系統的設與應用進行研究,旨在通過設備管理系統實現設備全過程管理算機化,由算機系統來完成設備的綜合管理、檔案管理、費用管理、固定資產管理、專業管理及信息管理,使人工管理中一些定的、隨機的成分轉變為定量的規范的管理,保證大慶石化總廠對設備的物質運動和價值運動的全過程實行先進的可管理,並逐漸將設備從目前的以強制及事後為主過渡到以為主,提高設備管理的工作質量、效率和現代化程度,輔助企業的設備管理工作決策及經營管理目標的整體實現,提高大慶石化總廠內部設備的利用率及實現其最大的經濟效益。
  2. Supervise duty team to carry out preventive maintenance schedule

    督促班組人員巡查制度的落實及劃的執行。
  3. According to the analysis on the order point method which is mainly used to manage material stocks for production , the relationship between the spare part demand plan and order point method is be established. that is to say, in the case of preventive maintenance pattern using the planned spare parts, they have a surprising similarity. so, order point method can be used to design the key software of spare parts dynamic management system

    通過對訂貨點法的分析和研究,得出了備件需求劃與訂貨點法的關系,即在模式使用備件的情況下,備件需求劃與主要適用於生產物資庫存管理的訂貨點法相似,可以用於備件算機動態管理核心軟體的設
  4. Predicting service life of reinforced concrete component is a problem that need be resolved urgently, since it can be used for reinforced concrete structure durability design, evaluation and maintenance strategies decision

    鋼筋混凝土構件耐久壽命的測是鋼筋混凝土耐久、評估和結構決策急需解決的問題。
  5. This dissertation takes aircraft spare part as its object of treatment. basing itself on reliability centered maintenance ( rcm ) and calculational methods theory, it establishes the aircraft spare part demand prognosticating model of each sort

    =本文將航空公司航空器材作為研究對象,應用以可靠為中心的理論和算方法等基礎理論,建立了各類航材需求測的基本模型。
  6. In order to ensure to process regularly the daily maintenance management, this paper is based on the theory and method of database design and the theory of pavement management system, combining the application environment and operation flow of the expressway maintenance system, bringing forward the four stages of the expressway maintenance system design which are the requirement analysis of consumers, conception framework design, logic framework design and physical framework design, scheming out an optimum database mode applied to all kinds of expressway maintenance systems, and establishing a common database application system, so that the expressway maintenance system can evaluate the pavement performance, forecast the pavement performance and make decisions of the pavement maintenance

    為了保證高速公路日常養護管理正常有序的進行,本文根據數據庫的設原理、方法及路面管理系統原理,結合高速公路養護管理系統的實際應用環境和操作業務流程,提出了高速公路養護管理系統數據庫設的4個階段? ?用戶實際需求分析、概念結構設、邏輯結構設和物理結構設,設出適用於各種高速公路養護管理系統最優的數據庫模式,並建立了通用的數據庫應用系統,使得養護管理系統能夠進行路面能評價、測和養護決策
  7. Pelb to review the effectiveness of the voluntary buildings safety inspection scheme ( bsis ) and the related loan scheme. the option for introducing a statutory preventive building maintenance scheme should be seriously considered

    規劃環境地政局應檢討自願的樓宇安全檢驗劃及相關貸款劃的成效,並應認真考慮推行有法定效力的樓宇劃。
  8. Participate in the implementation of planning maintenance programs and designing the preventive maintenance system

    參與制定程序和草擬系統
  9. The technique solves the problem of usage reliability assessment of capacitor banks, and provides the evidence for lifetime forecasting and device maintaining

    金屬化膜脈沖電容器組能可靠的提出,有效地解決了電容器組在使用過程中可靠的評價問題,可以為電容器組壽命提供依據。
  10. The department operates a preventive maintenance programme whereby the public drainage system is regularly inspected and desilted both before and during the rainy seasons. these preventive measures ensure that stormwater will be discharged effectively, and prevent blockages and overflows which may cause flooding and nuisance to the public

    渠務署推行保養劃,在雨季前及雨季期間定期檢查、疏浚和公共雨水渠系統,確保雨水排放暢通,使市民免受水浸滋擾。
  11. On the basis of collecting and processing many datum and materials. firstly. this paper analyzes main activities and cost constitutions of each stage of the life cycle of a fcs, and lay a foundation for later analysis and evaluation of system lcc. secondly, a basis method and usage range for estimating the system lcc are introduced. a multivariate linear regression model of pcs development cost and cost driven factor is built by use of the parametric method and supplies the base of cost estimation of newly - developed systems. thirdly, combine actual examples and make statistical analysis of lcc of a certain pcs developed by our institute, predict unhappened usage and service cost with grey prediction method, obtain proportion of each constitute to the lcc. forthly, according to actual conditions, use the fuzzy theory to overall evaluate efficacy of the fcs, fifthly, combimng our actual conditions, investigate specific measures of how to implement the life cycle cost management in our institute and put forward a new conception of developing web - based flight control system lcc management information system with pdm as the platform. at last, investigate important factors such as reliability and maintainability that may affect the life cycle cost of the fcs in detail, and put forward specific methods of lowering the life cycle cost of the fcs

    論文在收集和整理大量資料的基礎上,首先深入分析了飛控系統壽命周期各階段的主要活動以及各階段的費用構成,為以後系統壽命周期費用的分析和評價奠定了基礎;其次,介紹了壽命周期費用估算的基本方法和使用范圍,並利用參數法建立了飛控系統研製費用與費用驅動因子的多元線回歸模型,為新研系統的費用估算提供了依據;第三,結合實例對我所研製的某型飛控系統的壽命周期費用進行統分析,運用灰色測方法對未發生的使用及費用進行測,得出了該系統的壽命周期費用以及各組成部分所佔比例;第四,根據實際情況,首次運用模糊理論對飛控系統的系統效能進行了綜合評價,構造了飛控系統系統效能模糊綜合評價模型;第五,結合我所實際,探討了如何在本單位實施加強壽命周期費用管理的具體措施,提出以pdm為平臺,開發基於web的飛控系統lcc管理信息系統的新構思;最後,對影響飛控系統壽命周期費用的重要因素如可靠等進行了詳細地研究,提出了降低飛控系統壽命周期費用的具體方法。
  12. Schedule preventive maintenance tasks

    任務
  13. 2 design and exploit a database as background support after considering the traits of the existing system in order to avoid the shortcomings such as maintenance difficulties, lacking of safety and etc. 3 design and exploit a number of modules of the distributed fault diagnosis and predictive maintenance system based on c / s structure

    2 、充分考慮單機版系統現有特點之後,設、開發了一個強大的數據庫,採用數據庫前後臺管理,從而克服了文件管理帶來的護困難、安全差、不易擴展、伸縮差等缺點。 3 、設、開發出基於c s結構的分散式故障診斷與系統的部分模塊。
  14. It also introduces the producer ' s system of sbeg. analyses the production process and makes a proposal to improve it. according to the reality of sbeg, on principle of lean thinking, it designs some projects in order to put lp in practice, especially how to ameliorate the equipments of abrade to realize continuous process ; it also analyses operation change approaches in detail in order to offer some suggestions to shorten the operation change time and it brings forward maintenance methods fitting the continuous process, especially the use of statistics in forecasting maintenance

    根據sbeg的實際情況,基於精益思想的原則,設了精益生產方式實施的具體方案:為了實現屏生產線生產連續流程,根據sbeg的具體情況,設了屏后加工設備改造的方案,並對不同品種產品所需后加工各工序設備數,以及對應的節拍進行了算;針對目前錐成型作業轉換時間長的狀況,分析了作業轉換的詳細步驟,提出了縮短作業轉換時間的具體方法;設了全面設備方案,以保證連續流程的正常進行,並將數理統方法應用到制定方案中。
  15. In this paper, based on the previous research result, by using theory of electrochemical mechanism, probability math, reliability theory, basic theory of pre - stressed concrete structures, structure optimum design, theory of control, maintenance strategy decision theory of structures and etc., the research on steel corrosion monitoring method, structural corrosion damage model, reliability analysis, the maintenance and repair method that based on corrosion control, the optimum structural design method of new bridge structures that consider durability and the optimum maintenance strategy decision theory are carried out. 2. corrosion mechanism and monitoring technique it is widely accepted that the corrosion of steel in concrete structure is a electrochemical process, include the formation of anode & cathode area on metal surface and potential difference between different ' area

    本文在已有理論研究的基礎上,針對應力混凝土橋梁建設及使用中存在的影響結構耐久的實際問題,綜合運用電化學理論、概率理論、結構可靠理論、混凝土和應力混凝土結構基本理論、結構優化理論及控制決策等理論和方法,詳細研究了基於電化學理論的鋼筋銹蝕檢測方法、應力混凝土橋梁結構的腐蝕損傷模型、可靠分析、基於腐蝕控制的方法、橋梁結構方案選型及優化設以及在役橋梁結構的優化決策等問題第二章混凝土結構的腐蝕機理及檢測技術目前普遍認為,結構混凝土中鋼筋的腐蝕是一種電化學的過程,包括在金屬表面形成陽極(腐蝕)和陰極(鈍化)區域以及不同區域間的電位差等。
  16. Today how to make an assessment of durability and give a service life prediction have become two urgent tasks in the research of rc structure durability

    如何對結構進行科學的耐久評定和使用壽命測,為在役結構的決策和新建結構的壽命設提供依據,已成為當今鋼筋混凝土結構耐久研究的迫切任務。
  17. Abstract : concepts of probability importance and probability sensitivity of sectional constraints of rc frame structure are put forward and studied in this paper, and their calculation methods are given based on the failure correlation and the achievements on reliability of structural system under minor and strong environment hazard respectively. the conclusions of this paper provide a scientific basis for the disaster - resistant maintenance strategy before and after earthquakes, enhancing the reliability of decision - making for the strengthening of existing structure

    文摘:探討了鋼筋混凝土框架結構截面約束的概率重要度及概率靈敏度概念,利用失效相關及結構體系可靠度方面的研究成果,給出了鋼筋混凝土框架結構中各個截面效應約束分別在弱災害和強災害環境下的概率靈敏度與概率重要度的算方法,所得結論可以為在役結構在地震前的加固決策及震后結構的加固決策提供科學依據,從而提高了在役結構加固決策的可靠
  18. Scheduling and planning preventative maintenance activities that will maximize equipment availability and minimize downtime

    制訂劃,以便最大化利用設備及最小化減少因造成的停工。
  19. Audit the spare part requirement plan pulled by preventative maintenance ; control the sum of spare parts storage within the limits

    審核由主要拉動的的備件需求劃,控制備件庫存金額在年度目標內。
  20. To manage the preventive maintenance plan for utility equipment

    負責組織安排設備保養劃並確保其實施。
分享友人