維修記錄冊 的英文怎麼說

中文拼音 [wéixiū]
維修記錄冊 英文
maintenance log book
  • : Ⅰ動詞1 (連接) tie up; hold together; link 2 (保持; 保全) maintain; safeguard; preserve; keep ...
  • : Ⅰ動詞1 (修飾) embellish; decorate 2 (修理; 整治) repair; mend; overhaul 3 (寫; 編寫) write;...
  • : Ⅰ動詞1 (把印象保持在腦子里) remember; bear in mind; commit to memory 2 (記錄; 記載;登記) writ...
  • : Ⅰ名1 (用做記載物的名稱) record; register; collection; selections 2 (姓氏) a surname Ⅱ動詞1 (...
  • : Ⅰ名詞(冊子) volume; book Ⅱ量詞copy
  • 維修 : keep in (good) repair; service; maintain
  • 記錄 : 1 (寫下來) take notes; keep the minutes; record; write down; log; enter; read in 2 (當場記錄下...
  1. Section 24 inspection of record books ? these record books shall be kept in board the fishing vessel at all times and to be presented upon demand by duly authorized fishery law enforces except when the boat is drydocked or undergoing repairs and therefore not operating

    第二十四節的檢驗? ?這些應當一直保存在船上,在正式授權的漁業執法人員要求時進行出示,只有當船隻進入干船塢或進行而沒有運行時除外。
  2. The budget should include artist s fee, material costs, support, fabrication, production and installation, insurance, transportation, provision of documentation, operation and maintenance manual of the sculpture, clean up, light fittings, connection to signal cable outlet, a training session provided for the organiser on the maintenance procedures of the sculpture within 2 months after the installation, maintenance of sculpture for 12 months after the installation and any other expenses incidental to the implementation of the proposed sculpture

    此費用須包括創作及設計費物料費支架製作安裝保險運輸提供有關的文件和雕塑的操作及清潔照明系統裝置訊號線路連接雕塑安裝后十二個月內的在雕塑安裝后兩個月內為主辦單位提供一次有關雕塑程序的講解等,及所有可能涉及設置雕塑的費用。
  3. The budget for the commission must include all costs including artist s fee, material costs, support and fabrication, production and installation, stand finish, lighting system, insurance, transportation, provision of documentation, operation and maintenance manual of the sculpture, clean up, light fittings, connection to signal cable outlet, a training session provided for the organiser on the maintenance procedures of the sculpture within 2 months after the installation, maintenance of the sculpture for 12 months after the installation and any other expenses related with the sculpture

    委約費用預算包括設計費、物料成本、支架及裝置、製作及安裝、支架飾、燈光系統、保險、運送、文件、雕塑的操作及、清潔、照明系統裝置、訊號線路連接、在雕塑安裝后兩個月內為主辦單位提供一次有關雕塑程序的講解、雕塑安裝后十二個月內的及所有其他與雕塑品有關的支出。
  4. The final sculpture and requisite documentation and manual together with all their copyright shall become the sole property of the organiser

    完成之雕塑、所需文件資料及連同所有版權將歸主辦單位所有。
  5. These should include but not be limited to costs for provision of as - built drawingsrecords, maintenanceoperation manuals, necessary training for building maintenance and operation of equipment and machinery, and legal costs of the assignment

    有關經費包括但不限於關乎提供竣工圖保養運作手的費用;關乎提供保養建築物及操作器材和機器的必需訓練的費用;以及作出有關轉讓的法律費用。
分享友人