線性斜坡型 的英文怎麼說

中文拼音 [xiànxìngxiéxíng]
線性斜坡型 英文
linear ramtype
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • 線性 : [數學] [物理學] linear; linearity線性代數 linear algebra; 線性方程 linear equation; 線性規劃 line...
  • 斜坡 : slope; inclination; incline; hill; clivus; batter; decline; dip; pitch; lean; backfall; pali; [地...
  1. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非計算分析;對左岸高陡邊的大壩防滲體與基礎混凝土防滲墻的不同結合式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合式以及塑區大小的確定提供了重要依據。
  2. The judgement formula for high and low speed landslide and a new theory of stiffness - effect instability are presented for the instability of planar - sliding slope by the catastrophe theory. it is pointed out that the limit equilibrium stability analysis method of rigidity body has a lot of defects. the relationship between the action of outside environment and the response of slope system is complicatedly nonlinear according to the nonlinear dynamics model of slope evolution built

    針對平面滑動失穩問題,運用突變理論方法,給出了快速滑和慢速滑發生的判據,驗證了剛體極限平衡穩定評價方法有較大缺陷;根據演化非動力學模,發現演化過程會出現混沌現象,其通向混沌之路是通過倍周期分叉實現的。
  3. On the basis of displacement - time series of the slope, a nonlinear dynamic model is set up according to backus generalized linear inversion theory in this paper. due to the equivalence beween autonomous gradient system and catastrophe model, a standard cusp catastrophe model can be obtained through variable substitution. the method is used in analysis of displacement data of huangci landslide and wolongsi landslide and in understanding how slopes evolve before sliding. the result shows that the nonlinear dynamic model can make satisfactory prediction result. is it most important that there is a sudden fall of d, which indicates the occurrence of catastrophe ( when d = 0 )

    研究表明,滑變形失穩過程具有混沌和分維特,可以用分形理論來研究滑預測問題,基於對任一連續函數,至少在較小的鄰域內可以用多項式任意逼近的數學理論,運用改進的backus廣義反演理論,以位移時間序列為基礎,反演了演化的非動力學模。並利用自治梯度系統與突變模的等價,通過變量代換得到標準的尖點突變模
  4. In order to analyse the stability of the slop of this area, the longmen apex was chosen as a typical slope

    為分析長白山天池地區穩定,選取龍門峰作為典,採用有限元法對其進行應力、位移模擬分析,繪制最大、最小主應力等值圖。
  5. Linear ramp type

    線性斜坡型
分享友人