線路工程 的英文怎麼說

中文拼音 [xiàngōngchéng]
線路工程 英文
railway line engineering
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  1. At north pieces of railway deck bridge at tongji university way, treasure it designs to be at new urban thingseses at backbone of city distance by yang way yang project treasure, the red line of road is 45 meters wide, ward off the way of urban backbone built once

    寶楊、鐵山拓寬改建:寶楊由北段鐵橋西至同濟,寶楊設計為新城區東西向城市主幹,道寬45米,一次闢築的城市主幹
  2. Since its foundation, this institute has completed 3800 or more projects of exploration and design of which projects of priority are fengpu, lupu bridges, i, ii, iii stages of comprehensive sewage treatment, inner, middle, outer ring roadways, yan an dong lu viaduct ( east and middle sections ), main entrance roadway and graded crossing in pudong international airport, first and second stages of humin viaduct, expressways ( hujia, huqingping, hulu, jialiu, xinfengjin ) and chongming cross river projects, r3 and m7 light rail projects both situated in city proper or suburban area

    自創建以來,完成了各類勘察設計項目3800餘項,其中已完成或正在進行的項目有:上海市奉浦大橋、盧浦大橋、污水治理一二三期、 (內、中、外)環、延安高架道(東、中、西段) 、浦東國際機場航站區主進場道及航站區立交、滬閔高架道一、二期、 (滬嘉、滬青平、滬蘆、嘉瀏、莘奉金等)高速公、崇明越江通道、軌道交通r3、 m7
  3. 78 on its journey to island harbourview will continue to be re - routed via cherry street westbound, hoi king street northbound, pok man street westbound and sham mond road northbound before resuming its normal routeing, to facilitate the works of kcrc kowloon southern link

    78號往維港灣途中,將繼續改經櫻桃街西行海景街北行博文街西行及深旺道北行,然後恢復行走原來,以便進行九鐵九南
  4. All lanes of the new territories bound carriageway of tate s cairn highway near shek mun roundabout are closed due to an emergency roadwork to be carried out there

    由於要進行緊急道,大老山公近石門迴旋處前往新界方向的所有將會封閉。
  5. This thesis built the models computing the working frequency over - voltage " operation over - voltage for 220kv fugai transmission line, calculates and analyzes working frequency over - voltage " operation over - voltage using emtp program and provides reasonable protection measures for the transmission line. furthermore, regulations method, traveling wave method and striking distance method are used to study and compare lightning - enduring capabilities of different types of pole in power transmission lines aiming at the fact that the lightning strike switching rate of 220kv fugai line is higher

    本文分別建立了計算220kv復蓋頻電壓升高及操作過電壓的計算模型,利用emtp序對220kv復蓋頻電壓升高、投切空過電壓、投切空變過電壓、單相故障過電壓進行計算分析,並提出合理的防護措施。
  6. Commencement of route 9 - ngong shuen shau viaduct

    九號干昂船洲高架道
  7. Standard for quality inspection and evaluation of pertoleum construction engineering telecommunication engineering toll open - wire line engineering

    石油建設質量檢驗評定標準通信長途通信明線路工程
  8. Application on foundation of rock anchorage in projects concerning transmission line

    送電線路工程中巖石錨樁基礎的應用
  9. Standard for quality inspection and evaluation of petroleum construction engineering. telecommunication engineering toll open - wire line engineering

    石油建設質量檢驗評定標準.通信長途通信明線路工程
  10. Effect of tree felling cost on project cost of overhead transmission line

    樹木砍伐費對架空輸電線路工程造價的影響
  11. Basis and usage of typical enginoeing cost of sgcc transmission line projects

    國家電網公司輸電線路工程典型造價的編制依據及使用
  12. Code for construction and acceptance of oil and natural gas pipeline project

    輸油輸氣管道線路工程及驗收規范
  13. Standard for quality inspection and evaluation of petroleum construction engineering oil and natural gas pipeline project

    石油建設質量檢驗評定標準輸油輸氣管道線路工程
  14. Code for construction quality checkout and evaluation of 110kv 500kv overhead transmission lines

    110kv 500kv架空電力線路工程質量及評定規
  15. Technical regulation for sound cable of broadcasting

    廣播傳音電纜線路工程建設技術規范
  16. Design of soil conservation scheme in the construction of power transmitting line project

    電力輸電線路工程建設水土保持方案設計
  17. This paper studied the impact of highway route selection on the ecological environment, using quantitative analysis method, to compare the impacts arising from the highway project under the two route schemes and starting with the impact index selection

    摘要針對高速公建設項目的特點,從指標選取入手,採取定量分析的手段,對比研究了兩條線路工程建設對生態環境的影響度。
  18. Code for acceptance of local network communication lines engineering

    本地網通信線路工程驗收規范
  19. In order to acquire economical benefit without investing too much, it is necessary to improve the train speed on existence lines

    為了減少投資、提高效益,需要在不改建或者少改建線路工程的條件下,提高客運速度。
  20. Our successful samples include : twelve 220 kv trasformer substations, more than 6000 km 220kv power line, a large number of 110kv and below transferring engineerings

    已完成的設計項目有: 220kv線路工程600多千米, 220kv變電站18座,完成110kv及以下輸變配電一批。
分享友人