線路平衡 的英文怎麼說

中文拼音 [xiànpínghéng]
線路平衡 英文
line balance
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • : Ⅰ名詞1 (秤桿) the graduated arm of a steelyard2 (稱重量的器具) weighing apparatus3 (姓氏) a...
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  1. According to the application background and the dismatch between single antenna and differential lna, an active balun is needed and has been designed. then we put forward a design scheme that does co - simulation of an active balun and a differential lna on one chip together. at 2. 45ghz, this lna provides a forward gain of 28. 931db with a noise figure of 2. 485db, while drawing 19. 1ma from a 1. 8v supply

    從本設計的應用背景出發,考慮到單端天與差分lna之間的不匹配性,設計了一個介於兩者之間的有源轉換電? balun ( balance - unbalunce ) ,並提出了將這個balun電與前面設計的差分lna作為一個整體進行了模擬的設計方案。
  2. Static and dynamic trial experiments indicate that the system, not only can well simulate the prime governor and self _ equilibrium characteristics of a prime mover with its simple hardware line, small size and versatility, but also can highly improve the whole system ' s control precision, reliability and stability when compared with the system design of the analogy circuits

    靜態、動態測試實驗表明:該控制系統,不僅硬體大為簡化、體積小、通用性強,能夠很好地實現對原型調速器及原動機自特性的模擬,而且與模擬電的設計方案相比,整個系統的控制精度、可靠性和穩定性等大幅度提高,具有明顯的優勢。
  3. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部位的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流泥沙沉積分配的回歸計算式,據此可以預估計算河口不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了河口三角洲岸動態的概念,並建立了黃河河口來沙量與造陸面積的相關關系,得出了當河口多年均來沙量維持在3 . 45億t時其河口三角洲岸則可能處于動態狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  4. Based on analyzing the relations among the power of function, the path of beeline or curve, and the rank of infinitesimals, a method of path selection on some inexistence of weight limit is developed, i. e. the power control method of the infinitesimal rank

    摘要通過對函數的冪次、直徑與曲徑、無窮小的階三方關系的分析,提出了一類證明重極限不存在的徑選取方法無窮小的階的冪次法。
  5. Line balance level

    線路平衡
  6. On the basis of discussing the analyzed restraint relationship between the link loss and the spot - beam antenna gain a new spot - beam model of optimum design named link level balance spot - beam model is proposed

    在分析鏈損耗與點波束天增益之間制約關系的基礎上,提出了一種新的點波束優化設計模型鏈點波束模型。
  7. A combined neural network and genetic algorithm with solving stability safety of homogeneous slope was proposed and the finite element method is applied to analysis the progressive failure process of the slope and the maximum equilibrium theory, requests out stability safety of homogeneous slope with the smooth arc radius of difference with the difference below the level coordinate of arc peak, utilizing the neural network algorithm to establish slidng the nonlinear mapping relationship between level coordinate of arc radious and arc peak, being adapted the neural network algorithm to look for along the minimal stability safety of homogeneous slope and corresponding arc radious and arc peak

    提出了求解邊坡穩定性安全系數的神經網與遺傳演算法。該方法採用有限元分析和極限理論,求出不同的滑弧半徑和不同的弧頂水坐標下的邊坡穩定性安全系數,利用神經網演算法建立滑弧半徑和弧頂水坐標與安全系數之間的非性映射關系,採用遺傳演算法搜索邊坡的最小穩定性安全系數及相應的滑弧半徑和滑弧中心坐標。
  8. Data collected from mengda power plant have been used to train the model. unlike normal direct - method / indirect - method of heat balance, this model computes the boiler efficiency and main parameters needed for control in the boiler ' s operation efficiently by taking the advantage of neural network ' s inherited powerful co - relating ability, memorizing ability and the ability of mapping with nonlinear variables

    此模型不同於傳統的鍋爐效率計算方法(正或反方法) ,而是通過人工神經網本身具有的強大的聯想功能和記憶功能以及對于非性變量的映射能力,來計算鍋爐效率和鍋爐運行中需要調節的一些主要參數。
  9. After electric heating system is installed, check electrical insulation of all circuits. the insulation resistance between generatrix and shielding layer, core wires of series cable before connection at end not be less than 20 m. and then check if dc resistance of circuit is normal and phase resistance is banlance

    電伴熱系統安裝完工後,應逐檢查系統的絕緣電阻:各種電熱帶母與屏蔽層之間、串聯帶芯尾端末短接前的各芯間絕緣電阻均應不小於20m ;然後再檢查電熱帶直流電阻是否正常,三相電阻是否
  10. Then in order to dealing with the low redundancy of process industry sensor network, the procedure of building an accurate and efficient quasi - steady - state linear mass balance model is discussed in three steps : rough model establishment, model impovement and model validation. 2

    然後針對流程工業生產流程網的低冗餘性,從初始模型的建立、模型的改進、模型的檢驗和校正這幾個方面詳細探討了如何從生產流程的網結構建立一個準確而有效的性準穩態物料模型。
  11. Regarding the capital, society, environment as restriction, taking freeway and rail transport as examples, the paper uses indifferent curve and budget curve to discuss how to combine reasonably the foundation of all kinds of regional traffic modes in the future, so as to achieve maximal social utility, and provide decision - makers with the basis in theoretical basis

    摘要以資金、社會、環境等為界,以高速公和軌道交通為例,應用無差異曲和預算點方法,探討了如何將未來區域中各種交通方式的基礎設施建設合理組合,以達到社會效用的最大化,為交通規劃決策者提供了理論依據。
  12. Unbalanced wire circuit

  13. Balanced wire circuit

  14. Secondly, based on risk assessment theory, it will mainly analyze a new transient security index and give out detailed assessment progress. the index consist transient insecurity probability and outcome to obtain balance between technology and economy

    該指標綜合了暫態失穩發生概率和後果兩方面,以獲得技術和經濟間的,從而能保證最有效利用輸電乃至網
  15. Beginning form relation of basin - mountain, the tectonic evolution and the petroleum system and pool - forming process have been studied with the integration of structural physics modeling, balance profile reversion and other new testing technology. the main innovative achievements of the dissertation can be summarized as following : 1. on the basis of comprehensive analysis of yanqi basin relationship to tianshan orogenic belts, it was suggested that kuluketage faulted - upheaval was an aulacogen in early paleozoic, which undergone multiple opening - closing along with tianshan orogenic belts, and suffered extensively compressing in late hercyhian cycle and formed a " v - type " thrust - fold belt

    論文總的指導思想是以現代石油地質理論為基礎,以整體、動態、系統、綜合分析為原則,以成盆?成烴?成藏研究為主,運用正、反演相結合的殘留盆地油氣成藏系統評價思,採用構造物理模擬、剖面復原和多種測試新技術,從盆山耦合關系切入,研究含油氣系統成藏要素及其相互作用過程,探討油氣成藏主控因素和油氣分佈的有序性,取得如下創新性成果和認識: 1 、系統分析了焉耆盆地形成演化與天山構造帶的關系,提出盆地南側的庫魯克塔斷隆在早古生代為一大型裂陷槽,之後隨著天山構造帶的演化,經歷了多次開合運動。
  16. Through theoretic reckoning and simulating analyzing, several control strategies for shunt apf were compared and chose ip - iq arithmetic of the instantaneous reactive power theory control strategy as the right scheme to produce the instructing current. based on it, some new control arithmetic was subjoined to suppress the resonance in system and balance the dc side capacitor voltage. two topologies of main circuit were compared and chose the three - phase voltage - source converter with a split - capacitor as its main circuit structure

    通過理論計算和模擬分析,比較了並聯型apf的幾種控制策略的優點和缺點,從中選擇瞬時無功理論控制策略i _ p - i _ q計算方式為指令電流產生的演算法,並在此基礎上增加了抑制系統諧振和直流側電容電壓的控制;比較了並聯型apf主電的兩種常見形式,從中選擇了三相電壓型變流器的主電形式;算出適合該apf的直流側電容和出電感的參數;設計出能有效消除apf產生的高次諧波的高通濾波器。
  17. Summaries are made concerning the typical network optimization problem. the paper independently puts forward several optimal methods to improve network traffic transmission, such as the maximum - flow problem over mpls, including the arc - based and path - based solution, which adopt the method of splitting and unsplitting traffic, the solution to the greatest reliability of transmission, the solution to concurrent maximum - flow for load balance via linear programming. on the basis of mpls path protection several protection methods over mpls are proposed, including n - to - 1, n - to - m protection solution in splitting and unsplitting cases and in diffserv cases, whose partial simulation results are provided as well

    即: 1 ) mpls網最大流傳輸問題,包括基於弧的最大流解決方案、基於徑的最大流解決方案,分流與不分流的最大流處理方法以及多源多匯最大流解決方案; 2 )最大可靠性傳輸問摘要博士論文題: 3 )基於弧的求解流量負載問題的性規劃方法; 4 )基於徑的流量負載方法以及其他負載均問題; 5 )在mpls徑保護的思想和方法的基礎上,提出了基於mpls的若干新的徑保護方法,即n一t 。
  18. This can fully consider the effect of the structure of transmission line and the selection of lighting parameter etc. by calculating and analyzing various of factor that affect the lightning tripping probability of 500kv double circuit transmission line, we can draw the conclusions : the result by intersecting method is more accord with the practicality circumstance than by existing standard methods, using unbalance high insulation and reverse sequence of wire can reduce the contemporary outage rate of double circuit line, reducing the footing resistance is one of the most efficiency method to reduce the back stroking rate of double circuit transmission line, the double back stroking rate and the single back stroking rate will fall by three ground wire, when the footing resistance is 10 ohm, the back stroking rate by three ground wire is 83 percent of by two ground wire

    在分析輸電繞擊耐雷性能時,對的雷電屏蔽問題進行了分析,提出對擊距法進行改進,充分考慮了風速的影響因素,編寫了具有工程實用價值的計算繞擊耐雷水的程序,此方法可以充分考慮結構和雷電參數等對繞擊率的影響。通過對影響500kv同桿雙回雷擊跳閘率的各種因素進行了計算和分析,得到以下結論:採用相交法的計算結果比定義法更符合實際運行情況。採用不高絕緣方式和導逆相序排列可以大大降低雙回同時跳閘率。
  19. Abstract : drawing up standard line diagram and measuring network diagram, accurately grasping analysis on the balance of line number, knowing the state of power supply and line so as to improve the recovery of electric capacity

    文摘:繪制標準圖及計費網圖,準確掌握分析,正確了解供電狀況,狀況,以提高交電費回收率。
  20. Now, he decided to " go back to his balanced relationship again ", namely developing diplomatic relations with each power balancedly, which made china - pakistan relations on the decline

    現在,阿尤布汗決定「重走」主義,即發展與各大國之間的關系,這使得中巴關系因之受冷。
分享友人