線路終端元件 的英文怎麼說

中文拼音 [xiànzhōngduānyuánjiàn]
線路終端元件 英文
lte line terminal element
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • : Ⅰ名詞1 (最後; 末了) end; ending; finish 2 (指人死) death; end 3 (姓氏) a surname Ⅱ形容詞(...
  • : Ⅰ名詞1 (東西的頭) end; extremity 2 (事情的開頭) beginning 3 (門類; 方面) item; point 4 (原...
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  • 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
  • 終端 : terminal; terminus; terminator; tag end; end; termination; trailing end; end point; terminating終...
  1. The chip simulation network laboratory system this paper disguessed is a distribute network simulation system based on lan. the system ' s architecture is a c / s of three lays. the front platform are the chip simulation network system application program terminer ; the middle lay is a dcom server, it ' s duty is to deal with the communication and data transmission between the terminer and then database server, and to execute the logical operation. the application program just connect with the middle lay and get data from it, the connection and operation with database server will be managed by the dcom server. the duty of database server is to access and backup the final data

    具體是由位於網各個的晶模擬網實驗系統應用程序為前臺;中間層為dcom應用程序服務器,負責處理前臺應用程序與后臺數據庫的通信和數據傳輸,並執行業務邏輯,前臺應用程序只需要與應用程序服務器建立連接,在中間層操作數據即可,與后臺數據庫的連接和操作由應用程序服務器來統一管理操作。后臺數據庫只負責數據的存取操作。本論文實施的晶模擬網實驗系統模擬了主要的邏輯電, 8088cpu ,存儲器,寄存器,數據總,地址總和控制總,及其它相關晶
  2. For bus system installation, the focus is put on cable selection principle, installation process and antinoise measure ; for security protection equipment installation, the intrinsic safety concept, installation method equipment selection and installation under two electric power supply modes ( entity concept and fisco model ) and the bus system protection against surge voltage are illustrated ; for network component installation, the selecting, installing and integrating methods of general purpose terminators, repeaters, link equipment, bus power supply and impedance module are described

    在總電纜的安裝方面,著重討論了電纜的選型原則、安裝方法和抗噪防擾措施;在安全保護設備安裝方面,介紹了總系統中本質安全的概念、安裝方法、兩種供電方式(實體概念和fisco模型)下設備的選擇與安裝以及總系統浪涌電壓的保護和設備安裝方法;在網的安裝方面,主要列舉了通用器、中繼器、鏈設備、總電源及其阻抗模塊等的選擇、安裝和集成方法,為總系統的安裝提供了可以借鑒的實用經驗。
  3. But, the alarm signals from scada have disadvantages as follows : ( 1 ) the open - air feeder terminal units ( ftu ) are interfered by strong electromagnetic and thunder. besides, the failure of relays and the fault of ftu can also lead to that fault information is interfered and aberrant. ( 2 ) in the process of transmission and commutation, the error in the communication equipment may result in the signals err or lose

    然而,現有的scada系統在配電網發生故障時提供給調度員的警報信息有如下局限性: ( 1 )面向現場的戶外饋ftu運行環境惡劣,承受強的電磁、雷電干擾,並且由於繼電器節點故障、 ftu損壞等因素的存在,使得配電網信息受干擾、畸變的可能性較高; ( 2 )在信號傳輸及變換過程中,通訊裝置的故障等原因,也可能導致信號出錯甚至丟失; ( 3 )保護裝置和斷器本身也有可能誤動或拒動。
  4. Provision is made for connection of sense wires for 6 - wire circuits, these connections being commoned to the load cell excitation terminals on the ze10. 006 pcb

    如果這些連接與ze10 . 006印刷板的激勵上的測壓連接,也可以提供六的傳感器連接。
  5. Composite string insulator units for overhead lines with a nominal voltage greater than 1 kv. part 1 : standard strength classes and end fittings

    公稱電壓大於1 kv的架空用復合弦式絕緣子.第1部分:標準強度分級和
分享友人