線路設備 的英文怎麼說
中文拼音 [xiànlùshèbèi]
線路設備
英文
circuit equipment- 線 : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
- 路 : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
- 設 : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
- 備 : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
- 線路 : 1. [電學] circuit; line 2. [交通運輸] line; route
- 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
-
Fixed railway installations. equipment for overhead telecommunication and signalling lines. reinforced concrete socles
鐵路固定設備.通信和信號線路架空線用設備.鋼筋混凝土製管座Connecting point for earthing and short circuiting devices ; connecting piece for earthing conductors
接地和短路設備的接點.第5部分:接地導線的連接件Requirements and measurement methods of electromagnetic compatibility for radio communication equipment part 5 : radio frequency audio link equipment and wireless microphones
無線通信設備電磁兼容性要求和測量方法.第5部分:無線語音鏈路設備和無線話筒According to the principle of the interaction between the beam and the cwr ( continuously welded rails ) that the longitudinal forces of cwr on railway bridges are passed on to the piers by the span structures of the bridge, the intensity of piers is checked up by calculating and the safety reservation is analyzed so that the design of the cwr on railway bridges is optimized and is safer and more economic
摘要根據梁、軌相互作用原理(橋上無縫線路的縱向力通過橋跨結構傳遞到橋梁的墩臺上, )檢算橋墩的強度,進行安全儲備量分析,進而優化新建橋上無縫線路設計,使設計既安全又經濟。For bus system installation, the focus is put on cable selection principle, installation process and antinoise measure ; for security protection equipment installation, the intrinsic safety concept, installation method equipment selection and installation under two electric power supply modes ( entity concept and fisco model ) and the bus system protection against surge voltage are illustrated ; for network component installation, the selecting, installing and integrating methods of general purpose terminators, repeaters, link equipment, bus power supply and impedance module are described
在總線電纜的安裝方面,著重討論了電纜的選型原則、安裝方法和抗噪防擾措施;在安全保護設備安裝方面,介紹了總線系統中本質安全的概念、安裝方法、兩種供電方式(實體概念和fisco模型)下設備的選擇與安裝以及總線系統浪涌電壓的保護和設備安裝方法;在網路元件的安裝方面,主要列舉了通用終端器、中繼器、鏈路設備、總線電源及其阻抗模塊等的選擇、安裝和集成方法,為總線系統的安裝提供了可以借鑒的實用經驗。The system is using the existing the network resources to obtain the prominent economic benefit through organizing the telephone communication without putting on the lines and purchasing the telecommunication network equipments, which is saved much costs such as equipment charges, lines charges, and project charges
計算機網路電話通信系統無需鋪設電話線路和購置電話通信網路設備,節省大量建設電話網路的設備費、線路費和工程費等費用,可取得顯著的經濟效益。D2048u. business telecommunications. open network provision technical requirements. 2048 kbit s digital unstructured leased line d2048u. connection characteristics
商務電信.開放網路設備技術要求. 2048kbit s的數字非限性租用線路D2048u. business telecommunications. open network provision technical requirements. 2048 kbit s digital unstructured leased line d2048u. terminal equipment interface
商務電信.開放網路設備的技術要求. 2048kbit s的數字非限性租用線路The railway infrastructure corporation, responsible for the fixed facility maintenance and operation which include buildings and structures maintenance, water and electricity supply, signal repair and track maintenance, is composed of mechanized track maintenance corporation and synthetic maintenance corporation
固定設施運營維修由機械化維修公司和固定設施綜合維修公司組成,集房建、信號、水電和線路設備養護維修於一體。線路設備綜合維修和檢查檢測以機械化為主,由機械化維修公司負責。Combining the rules of conserve railroad equipments, with the structure and the force peculiarity of. to stability the switch fundament as fast as possible, and sustain the structure strength and track framework rigidity, the check method, repair period and item of are discussed. furthermore, the problems how to bring into play the technical character of in the and operation
按照線路設備養護維修的原則,結合提速道岔的結構形式和受力特點,為了盡快穩定道岔基礎、保持道岔結構強度和框架剛度,探討了提速道岔的檢測方法、維修周期和維修項目,同時討論了在日常養護維修和道岔使用中如何發揮提速道岔的技術特性等問題。Along with all of the aforementioned measures, the target of reducing the fixed number of employees and departments, enhancing productivity and efficiency, assuring safety and reducing labor intensity, should be realized. in this paper, ahp ( analytic hierarchy process ) method also be used to analysis and appraise the mode of mechanized track maintenance. the conclusion reflects that the mainframe - machine and mid - machine should be adopted in the section of the golmud - lhasa, minitype machine should be used as added equipment in the section of xining - golmud in order to complement the capability of the mai
文章採用層次分析法( ahp法)對線路設備機械化維修模式進行綜合評價和分析,所得結論認為青藏鐵路格拉段宜採用大型機械化和中型機械化相結合的維修模式,西格段也是採用大型機械化和中型機械化相結合的維修模式最優,但仍可保留目前小型機械化作為補充維修力量,以補充大型和中型西南交通大學碩士研究生學位論文第頁機械能力的不足,充分發揮目前西格段的現有機械設備和維修經驗。The old two dimensional gis has been used widely in the power systems and become more functional. but its traditional means of using symbols to express buildings and geographic environment does n ' t simulate the true terrain near the power lines and electric facilities, and does n ' t give the maintenance men the true information of their working surroundings
傳統的二維的電力企業地理信息系統已由技術研究階段進入大規模使用階段,功能日益完善,但是其簡單的幾何圖形加註記的形式不能真實的反映電力線路、設備設施周遭的地形地貌,不能為線路、設備的巡視、檢修人員提供真實的工作環境信息。It ' s also one important task in the information construction of electrical network. with the geographic information ' s visualization, gis takes one effective way to the power lines " and facilities " maintenance and management
藉助地理信息可視化技術,將輸配電線路、供用電設備及地理環境以圖文並茂的形式準確、直觀的展現出來為電力企業的輸配電線路、設備維護管理提供了高效手段。Feeders located in capital cities must not use voltage regulators to solve undervoltage problems
位於省會城市的饋線線路(設備)絕不能使用電壓調節裝置來解決低電壓問題。The solution of an undervoltage problem in a bar takes place after the solution of all overcurrent problems in thelines of a feeder
在解決一個饋線線路(設備)所有主幹路上的過流問題后,接著要解決掉出現其後的支路上的低電壓問題?Specification for low - voltage switchgear and controlgear - control circuit devices and switching elements - electrical emergency stop devices with mechanical latching function
低壓開關設備和控制設備規范.控制線路設備和開關元件.具有機械鎖定功能的應急停電裝置The sequence to solve a overcurrent line of a feeder is : load transference to another feeder, reduction the reactive power and finally increase the section of the cable
規劃一個饋線線路(設備)的一條過流主幹路的順序是:了解負荷轉移至另一個饋線線路(設備)過程中,將無功功率降低最終就要增加電纜。For fire grounding, grounded impedance varies greatly because of air dissociation, and this causes protection set to startup and resume again and again. therefore, the main protection of the fault line ca n ' t cut off the fault quickly and accurately, and may lead to overstep tripping of near lines " protection sets and eventually cause more serious faults on the power system
同時故障電流一般比較小,電流突變也很小,有時呈緩慢上升的變化趨勢,對火焰接地來說,由於空氣游離的緣故,接地阻抗變化很大,使現有保護反反復復啟動、恢復,可能會導致相鄰線路、設備的保護越級跳閘,使電力系統出現更嚴重的故障。Much of the loop plant was installed decades ago, and over the years the loops have undergone changes that may or may not have been documented
大多數線路設備都是幾十年前安裝的,這么多年過去了,線路發生了很多變化,這些變化可能沒有被記錄進去。But, the prospect of rebuilding existing cable plants for high - speed bidirectional communications and extending cable until it matches the reach of copper is a difficult challenge
但是,把現有的電纜線路設備改建成適合高速雙向通信延伸電纜直至與電話銅線相匹配是一個困難的挑戰。分享友人