緩傾斜層 的英文怎麼說

中文拼音 [huǎnqīngxiécéng]
緩傾斜層 英文
flat dipping beds
  • : Ⅰ形容詞1 (遲; 慢) slow; unhurried 2 (緩和; 不緊張) not tense; relaxed Ⅱ動詞1 (延緩; 推遲) d...
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  1. Results the result on this sedimentary environment was an offshore terrigenous fresh water lake from permian of shiqanfeng formation marinecontinental transitional facies in the southern of north china

    結果研究區地自南西向北東呈現依次增厚的趨勢,整體為北東方向的寬坡環境;砂巖分佈特徵指示物源來自南部隆起區和沉積中心在研究區以北地區。
  2. With the mining of no. 1 ore body which is solwly inclined, large and thick at the west flank of xinqiao pyrite mine as the example, analytic comparision is made between flat - back cut and fill stoping and sublevel open stoping with one - time delayed filling. the suggestion on the optimization of the mining and the discussion on appropraite mining method and the technical parameters of mining technology for slowly inclined large and thick ore body are also made

    以新橋硫鐵礦礦體西翼厚大礦體的開采為實例,對生產中應用的水平分充填采礦法和分段空場嗣後一次充填采礦法進行分析比較,提出采礦方法的優化建議,探討厚大礦體合適的采礦方法和采礦工藝技術參數。
  3. Talking about spreading combined mining roof coal technology at gentle inclined coal seam

    中推廣綜采放頂煤技術淺析
  4. Design and working practice of vertical face intersection in gently inclined seam

    立面交岔點設計與施工
  5. The overall fill amount of the airport is 1091. 2347 noyriastere and the height of the fill is almost 60m, with pertains to the high fill projects of the airport, whose site to prography and lithology is very varied. the basement of the till area is a slope dip place of slow dip downhill roch. there the research on the stability of the side slope filled is very necessary, this is because not only the design construction operation and investment of project is under influence, but also the feasibility of the projecct is also restricted, which is the key of the successful construction of the airport

    為開發資源,改善投資環境而興建的荔波機場位於貴州省荔波縣東北約12km ,機場總填方量1091 . 2347萬m ~ 3 ,填方高度近60m ,屬高填方機場,其場址地形及巖性復雜,填方區基底為角順坡巖坡地區,因此填方邊坡的穩定問題研究是十分必要的,因為不僅影響到工程設計、施工、運行和工程投資,甚至制約著工程的可行性,是機場安全順利建設的關鍵。
  6. Rotating mining method at slowly inclined seam ' s comprehensive mining coal face

    綜采面旋轉開采方法
  7. Model test of thermal explosion technology in underground coal gasification

    反向兩階段煤炭地下氣化模型實驗
  8. Flat grade mine

    緩傾斜層礦山
  9. Flat dipping bed

    緩傾斜層
  10. Testing methods of floor compressibilities for coal mining face under conditions of gently inclined seam

    採煤工作面底板抗壓入特性測定方法
  11. Talking about relation between the destruction depth of floor mining at flately inclined seam and actual mining parameters

    淺釋底板采動破壞深度與回採參數關系
分享友人