縫合底 的英文怎麼說

中文拼音 [féngde]
縫合底 英文
sewn bottom
  • : 縫名詞1. (接合處) seam 2. (縫隙) crack; crevice; fissure; slit
  • : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  • 縫合 : sew up; suture; seaming; lacing
  1. Press lever until it contacts body, and do not stop pressing on its way

    按壓夾桿直到夾釘將皮膚(在此過程中要一壓到,不能中途停頓) 。
  2. About feeding thick material flush ioint machine, usee five connecting rods to be possible to adjust about thickness the compound feeding, to swollens the wseam material and dives moves the natural big especially thick material and the thin material, can enable the lower level in the tailoring process the feeding quantity to achieve consistently ; uses turns on lathe the shuttle greatly, the raduction trades the agent number of times, most major characteristic thickness dual purpose, enhances the working efficiency, uses the completely automatic lubricating arrangement, enhances the machine service life

    0388系列上下送厚料平機使用五連桿可調整厚薄上下復送料,對膨體類料和潛移性較大特厚料和溥料,在紉過程中能使上下層的送料量達到一致;採用大旋梭,減少換線次數,最大特點針線張力小;紉厚度能力增大,紉薄料性能優良。
  3. Based on the research of several shiplocks, the temperature and stress field of the lock floor is simulated under temperature and gravity loads, where the shiplock floor is built on different foundations, the effect of setting up wide construction joints is analyzed by the nonlinear finite element method

    作者通過對多個船閘工程的研究,結非線性有限元模擬分析方法,考慮重力、溫度等荷載,計算分析土基和巖基上船閘結構板預留寬施工方法的效果。
  4. The grade a healing was found in 18 cases of ulcer and grade b healing in 2 cases

    方法徹或姑息切除變性、壞死組織后,以皮瓣或肌皮瓣移植修復,供區直接或游離植皮。
  5. The operation contained resecting the back rib covering the cavity, separating the intercostal tissue, cutting the external wall of the cavity, cleaning the cavity thoroughly, scraping the cavity till exposing the fresh tissue, killing the tuberculosis germs with organic acid, filling the cavity with the intercostal muscle, fixing and suturing the muscles

    切除覆蓋在空洞外側的肋骨後段,游離相應部位的帶蒂肋間組織,剪除空洞外側壁,徹清除空洞內容物,刮出新鮮創面,有機酸殺滅可能殘留的結核分支桿菌,將準備好的肋間肌瓣填充于空洞殘腔內,固定。
  6. Two stone steps worn away by the friction of many feet led to the door, which was made of three planks ; the door had never been painted or varnished, so great cracks yawned in it during the dry season to close again when the rains came on

    兩級被鞋磨光的石頭臺階通向由三塊木板所拼成的門,那扇門,從來沒上過油漆,早已露出裂,只在每年夏季到來的時候才因潮濕成一塊。這座房子外表雖然很破,但卻有它美麗動人的地方。
  7. At the end of november 2003, the practitioners began preparing the gifts by cutting large rolls of fabric into single - sized blankets and sewing a professional - looking hem on each one. the blankets were then packed in colorful, festive christmas gift bags that also contained a sample booklet, one of masters magazines, a warm polyester sweater, a pair of thick cotton socks, a knit cap and a box of delicious chocolates

    所有聖地牙哥小中心的同修在11月便開始準備禮物,同修們把一整匹毛料剪成適個人尺寸的毛毯,並加以邊,每件毛毯都裝在一個色彩明亮充滿節慶氣息的聖誕禮物袋中,禮物中還包括師父的樣書師父的新聞雜志溫暖的毛線衣厚棉襪編織帽以及美味的巧克力等。
  8. Seal the shipping container with either two inches ( 5. 08 cm ) or more width of pressure - sensitive or nylon - reinforced tape or with 60 - pound, three inch ( 7. 62 cm ) wide water - activated reinforced tape. close the box securely, applying three strips of tape to both the top and bottom of the box, so the middle and two edge seams are sealed

    08厘米)或更寬寬度的感壓或尼龍加強膠帶,或者使用60磅、三英寸( 7 . 62厘米)寬的水活性強力膠帶,密封運輸容器。在包裝箱的頂部和部貼上三條膠帶,牢固地上包裝箱,這樣中間的接和兩條邊沿接就已經密封了。
  9. Engineers are examining how to make the fuel tank from lightweight carbon fibre, which may allow it to be reshaped to fit into the nooks and crannies of the car ' s chassis

    工程師正在研究怎樣用輕碳纖維來製作燃料槽,從而使它更有可塑性以適放在隱蔽處和盤的隙中。
  10. Making its first appearance in the parade, the group is known for the grace and elegance of its performances. accompanied by drummers and trumpeters, flag - throwers swing colourful flags around their bodies and toss them overhead or to each other with great precision

    在鼓手與小號手的演奏下,舞旗手不斷揮舞彩旗,旗幟在隊員的身前身後穿梭往返,甚至被拋到半空中,隊員之間又互相拋擲彩旗,動作配得天衣無
  11. The next this text is based on the appearance theories, according to the characteristics that the temperature dispersion of super thick mass concrete planceer of high - rise building primarily is an even difference in temperature and an even constringency, suppose the level shears are line with the displacement, adopting a big physical volume concrete of planceer in flexibility foundation for plank computing model, from theoretically deducing the difference in temperature of mass concrete contracting should basic formula of dint, and analysis the crack rule and the influence factor of mass concrete temperature contract, and bringing up the theory calculation method about temperature stress of mass concrete and the biggest whole method that sprinkle the length, at the same time according to basic formula of the temperature stress of mass concrete and the concrete construction experience, bringing five technique measures to prevent the temperature crack of mass concrete

    其次本文以唯象理論為基礎,根據高層建築超厚板大體積混凝土承受的溫差主要是均勻溫差和均勻收縮的特點,闡述了大體積混凝土溫度應力理論計算的簡化方法和最大整澆長度的計算方法,同時根據大體積混凝土溫度收縮應力基本公式和大體積混凝土結構施工經驗,提出了防止大體積混凝土溫度裂的五項技術措施。最後本文以廈門郵電大廈3 . 5m超厚板施工為實例,從大體積混凝土溫度應力計算、混凝土保溫材料厚度計算、混凝土配比的確定,鋼筋工程、模板工程、混凝土的泵送和澆築以及大體積混凝土內部溫度的監測和後期養護等方面進行了理論應用。
  12. Insoling machine for california style athletic shoes. also suitable for sewing working gloves, furs of medium thickness, diving suits, and children ' s shoes

    使用於運動鞋,加州鞋中,工作手套、中厚皮、潛水衣、娃娃鞋。
  13. The circle of sliding surface should develop from the end of fracture down, and the weight of soil above the level of the end of fracture could be considered as up load. then the method according with this case is verified

    這種情況下,潛在滑動圓弧應從裂端開始向下延伸,本文按照這一思想提出了適黃土邊坡穩定性評價的計算方法,算例表明該方法較按單一的圓弧法更符實際。
  14. Footwear. test methods. determination of the resistance to separation of the upper - sole unit

    鞋襪.試驗方法.鞋幫鞋處耐分離的測定
  15. Join the under arm seam and side seam

    骨和側
  16. I sewed the new soles to the shoes with copper wire and put the cardboard back inside. then i shined them with soot from the stove lids

    我用銅絲把鞋和鞋面起來,把那硬紙板放進鞋內。然後我用爐蓋上的煤煙把它們擦亮。
  17. Abstract : combining engineering practices, the main reason for concrete crack during the construction in winter of the mass concrete with box foundation floor is analyzed, the key is temperature difference between insides and outsides. some measures to prevent concrete crack from occuring is put forward. these measures feasibilities by means of temperature difference computation, concrete tension stress checking computation, temperature recordings are validated

    文摘:結工程實際分析了箱形基礎板大體積砼在冬期施工階段產生溫度裂的主要原因,提出了砼冬期施工的關鍵是防止產生溫度裂,對防止砼產生裂的主要措施進行了探討,並通過砼體內外溫度差的計算,砼抗拉強度驗算和測溫記錄驗證了這些措施的可行性
分享友人