縱中剖線 的英文怎麼說

中文拼音 [zōngzhōngpōuxiàn]
縱中剖線 英文
fore and aft line
  • : Ⅰ動詞1 (釋放; 放走) release; set free; let go 2 (放任; 不約束) indulge; give oneself up to; l...
  • : [動]1. (破開) cut [rip] open 2. (分辨; 分析) analyse; examine; dissect
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  1. Perfect pre - processing and post - processing function is one of the main factors to evaluate the vitality and market value of the finite element analysis system surveying today development of finite element analysis technology, most of which concentrate on establishing fine user interface, also has some limitation on application, and especially, the research on the visualization of arbitrary cut - plane is always in ascendants to realize the visual processing on cut - plane needs reprocessing the results of finite element analysis which have get, so the algorithm is two parts : seeking the physical value of cut - plane and drawing 2d contours, the former, based on the theory of stress on " arbitrary inclined plane " in physical mechanics, use the method of linear interpolation method to get the coordination and physical value of intersection between cut - plane and element arris ; the latter, based on the tables on elements, nodes, stress and strain, summarize a rapid algorithm of generating 2d contours based on the grid. this thesis synthesizes there two parts and get a visual processing program under fortran

    觀有限元分析技術的發展,目前大多集在建立良好的用戶界面上的研究仍存在許多應用上的局限性,其對任意面上可視化的研究仍處于方興未艾的階段。要實現任意面上可視化處理,必須先將得到的有限元計算結果進行再處理,因此在演算法上分為兩部分:求任意面上物理量值的演算法及二維等值演算法。前一部分以彈性力學「任意斜截面的應力」為理論基礎,利用性插值方法得到截面與單元棱邊的交點坐標及交點物理量值;在此基礎上;根據已得到的單元及節點序號表、應力應變物理量表,總結出一種基於有限元分網格的快速生成二維等值的演算法。
  2. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出壩體的拱冠梁面和壩體面的溫度等值圖、拱冠梁面和壩體上下游面應力等值圖、壩肩最大最小應力沿壩高的分佈曲、不同高程處典型點的最大最小應力值表以及不同高程處最大最小應力值表等成果,為碾壓混凝土拱壩的設計和施工採取相應的溫控措施提供了參考依據。
  3. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口水電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁面和壩體面準穩定溫度場等值圖以及施工期、運行期拱冠梁面和壩體面非穩定溫度場等值圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的區域。
  4. According to the analyses of the research results about the feasibility of 4 - d seismic and the successful 4 - d seismic cases of foreign companies, the author put forward the suggestions for 4 - d seismic pilot area selection ; briefly analyzed the influential function of producing way on the seismic response ; utilized theory calculation, coring data analyses, and reservoir numerical simulation to define the fluid substitution effects on the p - wave velocity. through long time water driven to the reservoir, some of the properties and the log curves have changed, the author tried to find the variation rule of the reservoir and its effects on seismic velocity. the " blind point " in 4 - d seismic feasibility study both in china and overseas was found, that is the lack of consideration of the influence of physical property variation by long time water driven on the seismic response

    在深入分析國外四維地震可行性研究成果和成功實例的基礎上,提出了有利於水驅四維地震成功的工區優選條件;簡要析了各種開采方式及其對地震特性的影響;利用理論計算、巖心分析、油藏數值模擬三種方法確定了流體替代對波速度的影響;通過對長期水驅造成的物性參數、測井曲以及油藏溫度和壓力變化規律的總結,分析了這些變化對地震速度的影響,指出了目前國內外水驅四維地震可行性研究存在的盲區?沒有充分考慮長期注水造成的物性、溫度和壓力變化對地震響應的影響,完善了水驅四維地震可行性研究的內容;在考慮了這些變化因素后,高29斷塊水驅四維地震可行性研究結果表明:四維地震監測注水前沿可能要比監測油藏變化容易的多;以四維地震巖石物理可行性研究結果為基礎,提出了五個有助於突出四維地震造成的微小差異的途徑,為今後水驅四維地震研究指明了方向。
  5. It shows that the resolution of the crust interface ' s shape on this four profiles is very good, nevertheless that of the velocity structure is relatively poor. the crust and upper mantle ' s fine configuration on the hq - 13 profile is obtained by our tomography, which reveals some important structure and dynamic features of this region : the velocity structure of the crust consists of three layers, the upper crust, the middle crust and the lower crust. however it also can be divided into six lateral blocks, each of them " s velocity is always higher or lower than that of its neighboring blocks

    本文第五章利用有限差分反演和射反演的方法獲得了符離集?奉賢地震測深面( hq - 13)精細的地殼上地幔結構面,揭示出下揚子地區一些重要的結構和動力學特徵:地殼速度結構在向上大致可分上地殼、地殼和下地殼三部分,橫向上可劃分為6個塊體,各塊體的p波速度沿測方向呈現高速?低速?高速的組合。
分享友人