縱向圍堰 的英文怎麼說

中文拼音 [zōngxiàngwéiyàn]
縱向圍堰 英文
longitudinal cofferdam
  • : Ⅰ動詞1 (釋放; 放走) release; set free; let go 2 (放任; 不約束) indulge; give oneself up to; l...
  • : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
  • : 名詞(較低的擋水建築物) weir
  • 縱向 : [造紙] direction; machine direction; endwise; longitudinal direction; vertical; longitudinal縱向...
  1. Design and practice of blasting demolition of longitudinal rcc cofferdam at gaobazhou power station

    高壩洲電站碾壓混凝土縱向圍堰拆除爆破設計與實踐
  2. The construction scheme is briefly introduced herein, and furthermore, the diversion structures, the composite scheme consisting of open caisson group adopted to treat the overburden of the foundation for the stage 2 longitudinal concrete cofferdam and the diversion method of bottom outlet combined with the dam gap used for the stage 2 diversion are described as well

    文中對該方案進行了簡要介紹,並介紹了有關導流建築物,以及二期混凝土基覆蓋層採用了沉井群等綜合處理方案和二期導流採用的底孔加缺口聯合泄流方式。
  3. The statistical analysis shows that the temperature control measures have achieved expected result without any temperature - induced harmful cracks occurring in the longitudinal cofferdams

    對各項溫控措施成效的統計分析表明,景洪水電站溫控工作基本取得了預期成效,縱向圍堰碾壓混凝土至今未發現危害性的溫度裂縫。
  4. Monitoring and control of vibration of dam during blasting demolition of upstream longitudinal concrete cofferdam at three gorges project

    三峽工程縱向圍堰上游端部拆除爆破震動安全監控
  5. The three gorges dam will be the largest hydropower station and dam in the world, with a 1. 2 mile stretch of concrete and a 370 mile - long reservoir and 525 feet deep

    工程完成後,三峽將成為世界上最大的水力發電站,擁有1 . 2英里長的混凝土縱向圍堰、 370英里長、 525英尺深的水庫。
  6. In consideration of the hydrological and meteorological conditions, the construction characteristics, and the temperature control standard of rcc for cofferdams on upper and lower reaches and for right dam sections, an introduction was given to special temperature control and management measures adopted in rcc construction of longitudinal cofferdams at jinghong hydropower station during the high temperature period

    摘要針對景洪水電站水文氣象條件、施工特點,以及上下游和右沖壩段碾壓混凝土溫度控制標準,介紹景洪水電站縱向圍堰高溫季節碾壓混凝土施工過程中採取的具體溫控措施,以及業主在溫控組織管理工作中採取的措施。