總裝機容量 的英文怎麼說

中文拼音 [zǒngzhuāngróngliáng]
總裝機容量 英文
gross installed capacity
  • : Ⅰ動詞(總括; 匯集) assemble; gather; put together; sum up Ⅱ形容詞1 (全部的; 全面的) general; o...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : machineengine
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 裝機 : airloading
  1. The annual productive capacity of the major products are : 13. 8 thousand tons of melamine, 400 thousand tons of urea, 100 thousand tons of calcium carbide, 4000 tons of dicyanamide, 11 thousand tons of white carbon black, 10 thousand tons of edible liquid co2, 20 thousand tons of calcium cyanamide, 30 thousand tons of methanol, 10 thousand tons of formaldehyde, 50 thousand tons of n. p. k. compound fertilizer, 200 tons of guanidine nitrate and 500 tons dissolved acetylene. the calcium carbide is the fine quality product awarded by the state

    主要產品生產置能力為:年產氨28萬噸,實物尿素45萬噸三聚氰胺1 . 35萬噸精甲醇3萬噸食品二氧化碳1萬噸電石10萬噸石灰氮2萬噸雙氰胺4000噸溶解乙炔500噸甲醛5萬噸白炭黑1 . 2萬噸熱電廠3 . 6萬千瓦,年發電3億千瓦時,供熱450萬吉焦耳械廠年加工2000噸綜合廠復混肥5萬噸。
  2. To date, more than 4, 100 of these machines have been installed worldwide, totaling more than 6, 150 megawatts of capacity

    到現在為止,此在全球范圍內已經安超過了4 , 100臺,超過了6 , 150兆瓦特。
  3. Over 440 nuclear reactor units are in service around the world with total electricity capacity of about 353, 000 mw or 353 gw

    目前世界各地的核能發電反應堆約有四百四十個,總裝機容量約353 , 000兆瓦或353千兆瓦。
  4. Every year china builds 60 gigawatts of power - generation capacity, almost as much as britain ' s entire existing capacity

    中國每年新增的發電達600億瓦,這一數字幾乎是現在英國的發電
  5. The sun project is among the national key construction projects, which has four 300000 - kw condensing coal - fired generators with total investment of rmb 5. 5 billion yuan

    陽光發電公司工程是國家重點建設項目,總裝機容量為4臺30萬千瓦凝汽式燃煤發電組,投資約55億元人民幣。
  6. New figures, released quietly at the end of january, showed that china last year surpassed its often - cited statistic of adding more electricity generating power each year than the entire uk national grid

    在1月底悄然發布的新數據顯示,中國去年新增發電數超過了自己經常援引的統計數據,即每年新增發電超過整個英國國家電網的和。
  7. Based on the project scale argumentation of letan hydropower station, the paper briefly introduces the main results of scheme ' s technical & economical comparison and the main factors of scheme option in the option and design stage of the normal storage water level and installed capacity, as well as the evaluating opinions given by the specialist group of project proposal evaluating committee ; the main technical characteristics for similar project scale argumentation are summarized up according to the project scale design argumentation of letan hydropower station

    摘要通過樂灘水電站工程規模論證,簡述該工程正常蓄水位選擇和選擇設計階段方案技術經濟比較的主要成果、取捨方案的主要因素、以及項目建議書評估會專家組的評估意見;並根據樂灘水電站工程規模設計論證結類似工程規模論證時的主要技術要點。
  8. At present, however, exploitation extent of waterpower resource is low in heilongjiang province. waterpower - electricity only account for 10. 5 % in exploitable waterpower resource

    但目前黑龍江省水能資源開發利用程度很低,水電僅占可開發水能資源的10 . 5 。
  9. There is abundant power supply in yangquan area with low power price. there are also 3 power plants in ycg with total installed capacity of 106 mw. there is also reliable water and steam supply

    本地區電力充足,我集團公司擁3座自備電廠,總裝機容量10 . 6萬kw ,且電價較低供水供汽均有可靠的保障。
  10. The state ’ s total installed electric capacity reaches 385 gw, electricity generation is 1908 billion kwh and electricity consumption grows to 1891 billion kwh in 2003. however, it faces a severe situation that electric power is in short supply as a whole

    2003年全國的發電達到3 . 85億千瓦,全國發電達到19080億千瓦時,用電達到18910億千瓦時,電力供需形勢體緊張,缺電較為嚴峻。
  11. Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )

    高壩洲水利樞紐是清江流域三級水電站的最下游一級水電站,電站總裝機容量252mw ,4 . 3億m ~ 3 ,最大壩高57m ,壩軸線長439 . 5m ,靜態投資( 1988年價格) 62348萬元。
  12. In some cases, it refers to the total installed capacity ( rather than lines in service )

    在某些情況下,它指的是總裝機容量(而不是開通線數) 。
  13. The ratio of ma added to the mox fuel is studied. the neutronics characteristics of ma transmutation, and the transmutation and burning efficiency of the modular fast reactor are calculated. the role of the modular fast reactor to buffer the growing of ma in china and the reduction of radiotoxicity of nuclear waster via multiple recycling of ma in the modular fast reactor are calculated

    主要論述隨著我國壓水堆核電站和運行堆年的增加,乏燃料中ma增長趨勢;模塊快堆的堆芯概念設計方案;在不改變模塊快堆堆芯設計的前提下, mox燃料中添加ma和稀土核素對堆芯中子學性能的影響以及模塊快堆的嬗變效率;模塊快堆對減少我國ma的作用;模塊快堆產生的最終核廢物的長期放射性毒性隨時間的變化等。
  14. Letan hydropower station, with a total installed capacity of 600 mw and a total investment of 4. 024 billion yuan, is one of the important electric supply project in guangxi in the period of the tenth five - year plan in china

    摘要樂灘水電站工程是國家「十五」期間在廣西投產的重要電源建設項目之一,工程投資40 . 24億元,電站總裝機容量600mw 。
  15. Thermal power plant of tianfu co. ltd. which is established in 1985 has a electricity capacity of 51mw and a 485t / h steam capacity through three stage constructions

    天富熱電股份有限公司熱電廠始建於一九八五年,歷經三期建設形成51mw的發電,鍋爐計485t h的蒸發
  16. Chinese energy develop electric power group limited liability company is a large - scale state - owned enterprise, which is the collection of electricity generation, coalmining, heating and chemical smelting. the company presently has the general equipment departmentmachine capacity 200mw power set, has the verified coal reserves 3 billion tons, and buys stock the total investment to reach 3 billion in the chlorine alkali chemical industry project

    中能發展電力集團有限責任公司是集發電煤碳開采供熱化工冶煉為一體的大型國有企業。公司現擁有總裝機容量200mw發電組,擁有己探明煤碳儲30億噸,併入股投資達30億的氯堿化工項目。
  17. The world wind energy association expects total installed capacity for wind energy to grow from roughly 74, 000 mw in 2006 to 160, 000 mw in 2010 ? an increase of nearly 54 percent

    世界風能協會預計總裝機容量大約從2006年的7萬4千兆瓦增加到2010年的16萬兆瓦,增加接近54 % 。
  18. So far, the thermal power capacity occupies 75 % of the nation total power supply. by predicting that the thermal power with coal will still be the main part of our country ’ s electric power supply during a quite long period

    目前我國發電廠中,火力發電廠的約占我國總裝機容量的75 % ,並且在相當長的時間內,這種以煤為主的電力能源結構不會發生根本的變化。
  19. Initially the amount of electricity exchanged in this way will be very small in relation to the total installed capacity of the south china region which includes the provinces of guangdong yunan guizhou and the autonomous region of guangzi zhuang

    與華南地區的總裝機容量相比,最初採用這種方式的交換電將會非常小。華南地區包括廣東雲南貴州和廣西壯族自治區。
  20. Inner mongolia baotou wanbao rare earth metal co., ltd the old name is baotou wanbao rare earth metal factory has been engaged in the production of rare earth metal by dry method from the middle of 1980s. it is one of the biggest companys that engage in the production of the rare earth metal and single rare earth metal in baotou zone, inner mongolia, china

    內蒙古包頭市萬寶稀土金屬有限公司原包頭市萬寶稀土金屬廠從80年代中期開始從事火法稀土金屬生產。是包頭市地區專門從事稀土金屬和單一稀土金屬生產最大的企業之一。經過近二十年的發展,總裝機容量已擴大到2000kva 。
分享友人