缺肋 的英文怎麼說

中文拼音 [quēlèi]
缺肋 英文
absence of rib
  • : Ⅰ動詞1 (缺乏; 短少) be short of; lack 2 (殘缺) be missing; be incomplete 3 (該到而未到) be ...
  • : 肋構詞成分。
  1. Because perhaps move in have dinner, this is when, the blood in the body should provide athletic place quickly, right now organ of costal region ministry and muscle lack haemal complement, get the place to appear short time convulsion, also appeared " uncomfortable " phenomenal happening, concern without what

    這是由於在用餐或者運動時,身體中的血液要急劇的提供給運動部位,此時部器官以及肌肉少血液補充,便得該處出現短時間痙攣,也就出現了「不舒適」現象的發生,沒有什麼關系。
  2. Didier drogba resumes as central striker after a three - game absence, a welcome return in light of hern n crespo ' s rib injury

    迪迪耶-德羅巴在陣三場后繼續出任中鋒,鑒于克雷斯波骨受傷,前者復出實為令人歡欣鼓舞之事。
  3. We can say that it can develop the usage of soil nailing wall fill the rank of piles disadvantage a bright future of developing and using. the development, application, advantage and disadvantage about the " prestress anchor ribbed beam support system " is introduced in chapter 1 : it " s supporting mechanism and structural feature is introduced and compared with the soil nailing walls and un - embedded rank of piles in chapter 2 ; design and computer steps and more details about the design methods of the support system are introduced in chapter 3 ; the two important parts named draperies and anchors are introduced on their construction technology in chapter 4 ; three foundation trenches " instances with different depth in different soil are showed in the last chapter 5

    本文在第一章概論部分介紹了「預應力錨桿梁支護結構」的發展、應用和優點;第二章分析其支護機理、結構特點,並與土釘墻和無嵌入排樁多錨支護進行了結構受力對比分析;第三章介紹該支護結構的設計計算方法步驟,詳細介紹了支護結構各部分的設計方法;第四章介紹預應力錨桿梁支護系統最重要的兩個部分:帷幕和錨桿的施工技術;第五章介紹了不同土層不同深度的有代表性的三個基坑工程實例。
  4. We strongly suggest vats with direct suture and pleurodesis, as the modality of choice, for diaphragmatic defects in patients on capd

    我們強烈地建議對于連續性腹膜透析的病人,胸腔鏡橫膈損直接修補及膜沾黏手術為一較好的治療選擇方式。
  5. Two conclusions about the tube will be drawn : l ) being used in the heater of 300mw unit, it will cause 57 % decrease of the heater ' s volume and make the workshop ' s area much more smaller, which is gained from the reasonable device of the heater itself ; 2 ) when used in 100mw unit, higher capability lower temperature difference higher feed temperature of the heater will be available and better economic efficiency of the unit will be gained

    應用雙側微強化換熱管后體積可以減小為原來的43 ,大大減小了加熱器佔用廠房的面積。 ( 2 )雙側微強化換熱管應用於100mw機組熱電廠加熱器時,進行改造中,由於原加熱器存在很多陷,使加熱器傳熱性能降低,此時使用雙側微強化換熱管對加熱器進行改造時,可以提高加熱器傳熱性能,減少加熱器端差,提高加熱器給水溫度,提高機組的經濟效益。
  6. Accounting for the effects of imperfection and large displacement of arch, an approach for the stability analysis of arch bridge is presented , and a program is developed to predict the nonlinear buckling of arch the elastic lateral stability of the jiefang arch bridge in guangzhou during the construction phases and operating periods after its completion is analyzed the results show that the effects of initial deflection and large displacements on the critical load of lateral stability are significant, and that once the initial deflection and large displacement are taken into account, the values of the safety factor are smaller than those obtained by linear buckling analysis

    考慮拱初始撓度等陷的影響,採用桿系結構大位移分析的有限元方法,建立了拱橋非線性穩定的計算方法,並編制了相應的計算程序文中計算了解放大橋鋼管混凝土拱橋在施工階段及成橋后運營期間的彈性側傾穩定結果表明:考慮拱初始撓度和結構大位移影響后,拱橋的非線性側傾穩定安全系數比按線性穩定計算值低
分享友人