聯絡線 的英文怎麼說

中文拼音 [liánlàoxiàn]
聯絡線 英文
connecting railway
  • : Ⅰ動詞(聯結; 聯合) unite; join Ⅱ名詞(對聯) antithetical couplet
  • : 絡構詞成分。
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 聯絡 : (接觸; 聯系) get in touch with; come into contact with; contact; liaison
  1. With the expand of urban scope, great change have taken place in railroad hinge, many internuncial lines and lateral lines had been surrounded. former status and function had been losed, capacity of transportation is surplus

    同時,隨著城市規模的擴張,我國大城市鐵路樞紐也逐漸發生了很大變化,鐵路樞紐內的許多聯絡線、支逐漸被城市包圍,逐漸失去了原來的地位和作用,運能虛糜,設備、設施閑散。
  2. In second part, the feasibility and necessity that a internuncial line of the railroad hinge ( lishu bay - cai yuan dam ) participate in new no. 1 light railway in chongqing is analyzed, at the point of technology and economy, at the same time, the pattern of operation and management is being probed. at last, the methods of joining and transferring among state railway. outskirts railway and routine public traffic is been analyzed

    本文第二部分對重慶鐵路樞紐內梨樹灣至菜園壩一條重要聯絡線參與重慶輕軌交通新號進行研究,首先介紹重慶市客運現狀和交通路網現狀,結合重慶市鐵路樞紐的調整規劃,通過對梨菜參與城市軌道交通的幾種運營模式和管理模式的比較,提出了一個比較適合重慶市特點的運營管理方案,並從技術、經濟、政策方面分析了其可能性和可行性。
  3. Through calculation and dynamic adjustment of the distribution factor for every power plant and tie line, more accurate load flow change can be obtained

    通過計算並動態調整各個調節電廠和聯絡線的調節分配因子,得到比單個鬆弛節點計算時更加實際的潮流變化。
  4. During the optimization of the tie lines for urban medium voltage distribution network, different traverse of the transformer substations will bring different results

    摘要城市中壓配電網聯絡線優化的過程中,不同的變電站遍歷順序,可能帶來不同的聯絡線優化方案。
  5. The main contents are as follows : 1. analyze and calculate the influence on network frequency and power flows on tie line when 660mw generator unit trips out from hbpn

    主要工作如下: ( 1 )分析並計算河北南網在發生660mw機組掉閘時,對電網頻率和聯絡線潮流等方面造成的影響。
  6. Three steps of the method are, first, genetic algorithm is adopted in the whole planning area to hunt the possible traverse sequence of the substations ; second, the least weight match algorithm in graph theory is adopted to optimize the tie lines between each substation and its neighbors according to the traverse sequence determined in the first step ; finally, the scheme which has the least cost of investment in tie lines will be taken as the ultimate scheme

    第一層優化是在整個規劃區域內,應用遺傳演算法搜索可能的變電站的遍歷順序;第二層優化是按照第一層優化確定的遍歷順序,應用綱圖論中的最小權匹配演算法分別對每一個變電站與其相鄰站之間的聯絡線進行優化。
  7. Therefore, in december 2000 the bureau of transportation of taipei city government completed a feasibility study for an lrt system in the taipei shin - yi district. this study recommended the adoption of an lrt system with a standard track gauge, power supply from overhead wires, two or three cars per train, a length of 90m for platforms, a certificate system for fare payment, consideration of the possibility of using electronic sensor ticketing systems, type b right - of - way for at grade sections, and signaling control for passing priority at the intersections. the study also proposed an initial lrt line of 9. 6 kilometers in length with 9 stations

    現代化輕軌運輸系統之運輸效能已較電車系統大幅提升,以一般採用b型路權為主,少部分a與c型路權之系統而言,每小時單向運能達到5 , 000至15 , 000人次,介乎高運量捷運與公車系統之間,適合擔負都會地區市郊與市中心區的、市中心區集散路、鐵路與捷運系統接駁路、都市周邊環狀、特定區間(新市鎮)聯絡線、都會區次要運輸走廊運輸主軸等服務類型。
  8. Analysis of causes of traffic accident happened out in contact lines of expressway

    高速公路出入聯絡線交通事故原因分析
  9. Analysis of the reason and control of ground settlement of subway at guangzhou subway no. 2 line kecun contact line fork

    廣州地鐵客村聯絡線岔口段隧道工程地面沉降原因分析及控制
  10. The transportation network is described as a series of nodes and connecting links.

    通常把交通網描繪成一系列的節點和節點之間的聯絡線
  11. Part research fruit has been applied in chongqing power network, it brings into important play for the safety, economy, and running high quality of chongqing network, and avoiding pecuniary penalty with si chuan - chong qing power connecting line

    該課題的部分成果成果已在重慶電網中應用,對重慶電網的安全、經濟、優質運行和避免川渝電網聯絡線考核罰款發揮了重要作用。
  12. Accompanying power system reformation, chongqing power network will be merged into the middle china power network. according to national " power attempt communicating center assessing measure, chongqing power network modulates not only network frequency but also the power of chuan yu - the middle china network alliance line

    伴隨著電力體制改革的推進,重慶電網即將併入華中電網,按照國家電力調度通信中心頒發的考核辦法,重慶電網既要承擔調整電網頻率的任務,又要承擔調整川渝?華中電網聯絡線功率的任務。
  13. The calculation is based on the actual length of the first line even if this line has a full or partial double track or more tracks, excluding double tracks, stationsidings, tracks under the charge of stations, branch lines, specialpurpose lines and the non payable connecting lines

    凡是全或部分建成雙及以上的路,以第一的實際長度計算;復、站、段管、岔和特殊用途以及不計算運費的聯絡線都不計算營業里程。
  14. Artoo, switch on the comlink

    R2 ,接通聯絡線
  15. The layout method of the connecting lines in the network planning of urban mass transit

    軌道交通路網規劃中聯絡線布局方法
  16. The advanced evolution algorithm presented in this paper extend the topological function to querying loop network and querying connection line, which make a foundation for data check - up and data correction of radial analysis software

    基於本文的改進演算法,在實現網路拓撲分析的基礎上,還將其功能擴展,進一步實現了環網查尋功能、聯絡線查詢功能,為配網分析軟體的數據檢查和修改打下了很好的基礎。
  17. From a transportation point of view, a modernized light rail rapid transit system is more efficient than streetcars. most lrt systems adopt type b right - of - way regulations. few have used types a or c. their capacity stands between heavy rail rapid transit systems and bus systems, in that they can carry between 5, 000 and 15, 000 passengers per hour in a single direction

    現代化輕軌運輸系統之運輸效能已較電車系統大幅提升,以一般採用b型路權為主,少部分a與c型路權之系統而言,每小時單向運能達到5 , 000至15 , 000人次,介乎高運量捷運與公車系統之間,適合擔負都會地區市郊與市中心區的、市中心區集散路、鐵路與捷運系統接駁路、都市周邊環狀、特定區間(新市鎮)聯絡線、都會區次要運輸走廊運輸主軸等服務類型。
  18. The characteristics, construction and attentive proceeding are discussed in construction of red sandstone. a detailed description is given according practical examples, especially in blasting of red sandstone and compaction

    摘要通過京九鐵路麻武聯絡線的施工,簡要地敘述了路所處地區的紅砂巖的特性與施工,及其施工中所應注意的事項,根據實際施工情況,特別對紅砂巖的爆破及填築壓實方面進行了較為詳細的敘述。
  19. This method can make the crp depth imaging and the interpolation of prestack data he completed simultaneously, and also it better resolve the problems of 20 data process such as incorrect imaging, difficulty of aide wave process, disclosure between inlines and crosslines

    本方法能使共反射點偏移成像與疊前數據插值一步完成,較好地解決二維資料處理中的成像點不能準確歸位、側面反射波難處理、主測聯絡線不閉合等問題。
  20. According to the characteristic of subway power alternating current transmission line, a new synchronous method based on reference zero point of the wave shape of voltage was proposed. the method is suitable to short distance line such as the subway power alternating current transmission line

    根據地鐵電力交流聯絡線的特點,作者提出了一種適合於短距離路保護的參考電壓零點的同步演算法,並對該演算法的優缺點進行了詳細的分析與模擬。
分享友人