肩固 的英文怎麼說
中文拼音 [jiāngù]
肩固
英文
single shoulder holding-
Inspect left shoulder seam. inspect left armhole seam for seam appearance. check for seam stretch properties and needle holes
檢查左肩縫骨。檢查做袖窿縫骨。檢查縫骨是否牢固及針步是否良好。Treatment of distal clavicle fracture and acromioclavicular dislocation with clavicular hook plate
鎖骨鉤鋼板內固定治療鎖骨遠端骨折和肩鎖關節脫位Surgical treatment of severe acromioclavicular dislocation by wire cerclage and kirschner wire fixation of the coracoid and clavicle
喙鎖間環扎鋼絲加克氏針固定治療重度肩鎖關節脫位The decision was already unconsciously made this morning when he didn ' t think about taking off his dog tags, when he shrugged into his uniform shirt with its fraying collar and its american flag sewed on the sleeve and buttoned it up
今早,他聳著肩穿上制服,領口有些織物灰塵,他粘上美國國旗的袖標,壓了一下以作固定,此時他不想拿掉自己的狗牌,決定也在無意間做出。For jiangpinghe double - curved arch dam, 3 - d elasto - plastic fem is made, in which the point safety factors of the dam - abutments system and the safety margin for coefficients of sliding resistance on 7 potential sliding blocks of the dam before and after the reinforcement of the dam are calculated under the conditions of the normal storage level and the design flood level respectively based on the results from the analysis made with fem
摘要對江坪河雙曲拱壩進行了三維彈塑性有限元分析,利用有限元應力成果分別計算了正常蓄水位、設計洪水位等3種工況下加固前後壩體壩肩系統的點安全系數和7個可能滑動塊體的抗滑富餘系數。Back : the back is short, straight and muscular and firmly connects the withers to the hindquarters
背:背短、直、且肌肉發達。穩固地連接肩和后軀。Operative treatment for unstable scapular fracture with posterior approach
肩后入路內固定治療不穩定性肩胛骨骨折The treatment of acromioclavicular dislocation by kirschner nail wire tension band and unciform plate : a therapeutic - effect evaluation
克氏針鋼絲張力帶與鉤狀鋼板固定治療肩鎖關節脫位的療效評價Analysis of dam abutment stability of tianfumiao reservoir and reinforcement design
天福廟水庫壩肩穩定分析及加固設計Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project
溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。In the excavating process of the left bank, such methods as concrete embolism, consolidation grouting > cable strengthening and bailing shoud be used when the fault f5 is round. on the right bank, the system anchorage and bailing methods shoud be used. it is surgested that the prestressed cable shoud be used to deal with the deterministic blocks. and the prestressed anchor to the undeterministic blocks
左岸拱肩槽邊坡在開挖施工至斷層f5附近時,要使用混凝土栓塞、固結灌漿、錨索加固及排水等措施以防止巖體失穩。右岸拱肩槽邊坡開挖過程中要採取系統錨固及排水防滲等措施,以防止個別潛在不穩定的邊坡失穩。In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed
通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed
通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦堆積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。A great university must teach its students to ask questions, to formulate and to solve problems, to take an inquiring and critical attitude towards received ideas - in short, it must be a place where students learn to think for themselves
他認為卓越的大學在創造學問和傳授學問上固然肩負重任,更要教導學生敢於發問、提出和解決問題,並對既定的觀念抱懷疑、批判的態度。簡而言之,大學應該啟發學生獨立思考。At this moment not only the shoulder that should make a patient had caught the person that bear, had secured the patient ' s body with back towel even
這時不但要叫病人抓好背負者的肩膀,還要用背巾把病人的身體固定好。The set of his shoulders, the firm line of his chin conveyed a stubborn strength.
他的兩肩的姿態和他那下頷的堅強線條都顯示出一種固執的力量來。Arch dam, which is fastened to the base rock, is a high _ order, hyperstatic, spacial body case structure. it has not only arch function but also girder function, but its main loads are passed to each dam abutment by means of arch function
拱壩是固結于基巖的高次超靜定空間殼體結構,既有拱作用又有梁作用,其主要荷載是通過拱的作用傳到兩岸壩肩。Trough the analysis of stabilization safety on tengzigou arch dam, some conclusions are obtained in the following : ( 1 ) tengzigou arch dam is safe under normal poll level ; ( 2 ) stabilization safety factor of tengzigou arch dam is about 4 - 5 ; ( 3 ) it is proved that combinatorial reinforcement measures are effective and feasible
對藤子溝拱壩的數值計算和模型試驗分析表明: ( 1 )藤子溝水電站在正常蓄水位作用下,壩體和兩岸壩肩是穩定的; ( 2 )藤子溝拱壩的整體安全度大概為4 5左右; ( 3 )東北院提出的對左岸泥巖層挖除處理並用混凝土置換的加固除險措施經研究表明該加固措施是有效、可行的。Manually reduction and plaster fixation with o - shape for treating old dislocation of shoulder : a report of 21 cases
形石膏外固定治療陳舊性肩關節脫位21例Manipulative reduction and external fixation for the treatment of acromioclavicular dislocation
手法復位結合外固定治療肩鎖關節脫位分享友人