This paper is based on the engineering background of the real time fault diagnosis of the deashing system in zhenjiang jianbi power plant. this system, as the subsystem of a typical distributed control system, can achieve the processing automaton and malfunction alerting automaton. during writing this paper, the following work has been done :
本文基於實際工程背景,研究與探討了鎮江諫壁火力發電廠高濃度除灰控制系統中的柱塞泵灰水泄漏實時檢測系統,該系統是典型的dcs控制系統的一個子系統,使電廠高濃度除灰車間實現了故障報警自動化。As a main participator in the design for and research on engineering the control system, in the project of eliminating ash with water in jianbi power plant, the author emphasized on the intelligent fault diagnosis for the complex hydraulic system by the background of that project in this paper
本論文以作者參與的諫壁發電廠濕除灰控制系統的設計研究為工程背景,以柱塞泵為主要實踐對象,研究復雜液壓系統泄漏故障的智能診斷問題。