能力需求計劃 的英文怎麼說

中文拼音 [néngqiúhuà]
能力需求計劃 英文
capacity requirements pla ing (crp)
  • : 能名詞(姓氏) a surname
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞(需要) need; want; require Ⅱ名詞1. (需用的東西) necessaries; needs 2. (姓氏) a surname
  • : Ⅰ動詞1 (請求; 要求) ask; beg; request; entreat; beseech : 求人幫忙 ask sb a favour; ask a favou...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • 能力 : ability; capacity; capability
  • 需求 : needs; need; demand; requirement
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  1. The research of this paper includes three parts : the first, according to the statistical figures about the cargo transport in recent years, it analyzes cargo transport structure and the changing law and the internal reason of cargo transport. at the same time it analyzes and calculates the change of the arriving ships " structure for a systematic and full understand of the transport demands. the second, it make a scientific forecast of the port ' s future cargo capacity making use of the grey forecast system, which provides scientific basis for medium - long term development plan of the port ' s cargo handling capacity

    本文研究的工作主要分三個部分:第一,根據張家港近年來有關貨物運輸的一些統數據,對貨物運輸的結構和規模演變的規律及內在原因作一剖析,同時對到港船舶的結構變化進行預測,以對運輸有一個系統全面的了解;第二,應用灰色預測系統對張家港港未來港口貨運吞吐量進行科學預測,為張家港港貨物裝卸提供科學依據;應用物元分析技術對張家港港口的未來發展前景作出一定程度的分析、研究,找出張家港港口未來發展規的零散無序、不成系統的因素,總結前人經驗的基礎上採用綜合評判物元模型進行評判,在預測港口未來發展規是否科學實際上具有獨到見解。
  2. The requirement analysis and system design are carried out according to the situation of nanjing sky electron co. ltd. at the same time, the key technology to solve the capability balance of the machine tool and scheduling system of the workshop production are studied, and a management model of the workshop production solved the corresponsive problem to finish the production task in time according to the current need in the enterprises

    然後結合一個典型的製造業企業? ?南京四開電子企業有限公司進行了系統的分析和設。接著研究了企業車間級生產管理模型,提出了一種以按時交付為目標的機床生產平衡與車間級生產的控制方法,並對其中要解決的關鍵技術進行了研究和討論。
  3. Abstract : a cad tool based on a group of efficient algorithms to verify, design, and optimize power / ground networks for standard cell model is presented. nonlinear programming techniques, branch and bound algorithms and incomplete cholesky decomposition conjugate gradient method ( iccg ) are the three main parts of our work. users can choose nonlinear programming method or branch and bound algorithm to satisfy their different requirements of precision and speed. the experimental results prove that the algorithms can run very fast with lower wiring resources consumption. as a result, the cad tool based on these algorithms is able to cope with large - scale circuits

    文摘:介紹了一個基於標準單元布圖模式的電源線/地線網路的輔助設集成工具.它應用了一系列高效的演算法,為用戶提供了電源線/地線網路的設、優化和驗證的功.非線性優化技術、分枝定界演算法和不完全喬萊斯基分解的預優共軛梯度法是該工作的三個主體部分.用戶可以選擇使用非線性規的方法或者幾種分枝定界方法來滿足他們對于精度和速度方面的不同.實驗結果表明,文中所提供的演算法可以在很快的運行速度下實現更低的布線資源佔用.因此,在這些有效演算法基礎上實現的輔助設工具具有處理大規模電路的
  4. The uncertainty of these variables causes the variability of factory ’ s capacity planning, especially for long range capacity planning in semiconductor manufacturing because of its shortening product life cycle, high equipment cost, etc. the uncertainty issue of long range capacity planning process in semiconductor manufacturing was studied in this thesis

    這些變量在實際中的不確定性,導致了工廠生產的變動性。由於半導體產品生命周期日益縮短,生產設備造價昂貴等原因,工廠長期生產的不確定性在半導體製造業表現得更為突出。
  5. The main research contents are as follows. 1 ) the characteristics of semi - process industry based on make - to - order are studied, which means that the purchase tune is long while the due date is short, the working procedures are successive and discontinuous. then the general structure of production system based on make - to - order mode in semi - process industry is put forward, which includes estimate of the dynamic finite resources, evaluation of the order based on rough capability balance, material requirement planning, production plan, order tracing, collection and feedback of the local data etc. they all together form an integrated and closed loop system as a whole

    研究的內容主要包括: 1 )研究了半流程製造業面向訂單生產模式具有的采購期長、交貨期短和工序連續但工序間可間斷的特點,並基於此提出了適應半流程製造業面向訂單生產的系統總體結構,其主要內容包括動態有限資源評價、基於初平衡的訂單評估、物料和生產作業、以及訂單跟蹤和現場數據的採集和反饋等,它們在總體上形成了一個集成的和閉環的系統。
  6. Be responsible for crp analyze within manufacturing department

    負責能力需求計劃分析在製造部內部的開展。
  7. Cpa capacity requirements planning

    能力需求計劃
  8. Crp capacity requirements planning

    能力需求計劃
  9. Capacity requirements planning

    能力需求計劃
  10. The crp ( capacity requirements planning ) is one part of erp system, which plays an important feedback role in erp

    能力需求計劃( crp )是erp的一個重要組成部分,它在erp中起著重要的反饋作用。
  11. In order to meet growing domestic energy demand, china plans to build four 1, 000 - megawatt plants as part of its strategy to quadruple nuclear capacity to 32, 000 megawatts between 2005 and 2020

    同時為了滿足國內日益增長的,中國再建4座1000兆瓦的核電廠2005 2020年作為其戰略翻兩番核達到3 . 2萬兆瓦之間。
  12. The main problems are also discussed such as order arrangement, capacity, capacity requirement plan, dynamic capacity plan based on agreement synchronous linear produce and lead - time control

    討論了系統所解決的幾個主要問題:訂單管理,生產能力需求計劃,同步線形生產的能力需求計劃的演算法,提前期管理。
  13. Since shop plan is the key of shop producing, with the goal to optimize producing workshop plan, the paper discusses the capacity and capacity requirement plan and provides an agreement synchronous linear production algorithm

    由於車間是車間生產的關鍵環節,本文首先以優化車間制定為目標,研究了生產能力需求計劃,給出了相約同步線形生產的能力需求計劃的演算法。
  14. Then some implementing re - configuration key technology such as com / dcom, corba, workflow technology are introduced. chapters, after general analysis of production management system and description of the requirement of supported re - configuration pms, a system frame of supported - reconfiguration pms is presented. then under the supported re - configuration philosophy, the common function models ( including basic data, production schedule, production process management, workshop management ) are designed

    第三章通過對生產管理系統的總體分析,給出支持可重構的生產管理系統體系結構的,並提出了一個支持可重構的生產管理系統體系結構,進而根據支持可重構的設思想對生產管理系統中的通用功模塊(基礎數據、生產、生產過程管理、能力需求計劃、車間管理等模塊)進行了功
  15. In the paper, base on the introduction of contemporary integrated manufacturing system ( cims ) and mrp -, which play an important part in qms, and its influence on cims, both theoretical basis and fundamental function framework of mrp - have been investigated, including its system structure and basic module. through studying planning information module, the important part of mrp -, including mps ( master production scheduling ), mrp ( material requirement planning ) and cap ( capacity planning ), the operation model of planning information has been discussed

    本文介紹了mrp -在算機集成製造系統( cims )中所處的地位及對企業信息化建設的影響,闡述了mrp -的理論基礎及其基本功框架,包括它的體系功結構、基本模塊描述;通過研究mrp -中的重要內容? ?信息模塊,包括主生產、物料以及能力需求計劃,進一步探討mrp -中的的信息處理模式。
  16. The rebate programmes under the dsm agreement provide financial incentives to encourage the non - residential users to install more energy efficient equipment and devices to shift part of the electricity demand to non - peak hours

    協議的回扣提供了經濟誘因,鼓勵非住宅用戶安裝更節的設備,以及把部分電量轉移至非繁忙時間。
  17. Production data management module is responsible for the management of basic manufacturing data, including basic process data, typical process flow data, equipment and worker data, etc. capability requirement planning module is responsible for the planning of manufacturing resources according to estimate of market demands, supplies the company with data for resource planning. line balancing module is responsible for production line balancing based on the detailed orders, in order to improve the use of manufacturing resources. and facility layout module is responsible for facility layout according to the result of line balancing and the manufacturing data

    生產數據管理模塊負責基礎生產數據的管理,包括製鞋基本工序的管理、標準部件和變型部件的典型工序流程管理、設備和人員數據的管理等等;資源模塊根據企業對產品族各個產品的市場預測信息以及產品族各個部件對生產數據,進行企業資源,為企業提供製造資源的中長期規分析;生產線平衡設模塊是根據企業的具體產品定單,對產品各個部件的流水生產線進行平衡設,以提高資源的利用;設備優化布局模塊則根據各條生產線的工序要和設結果,進行廠房的設備優化布局,降低物流強度,提高流水線的生產效率。
  18. The panels discussed the paper re. target of re contribution to the electricity demand, environmental and social benefits associated with the use of re other than cost considerations, access to the existing electricity grid by re producing organizations companies in the context of the 2003 interim review of the schemes of control agreements and a concrete timetable for development and wide - scale application of re

    兩個事務委員會討論載述以下各項事宜的文件:可再生源發電量占電的目標比率除成本因素外,使用可再生源對環境和社會的效益可再生源生產機構公司在2003年管制協議中期檢討的范疇下使用現有的供電網路以及發展和大規模應用可再生源的具體時間表。
  19. The panels discussed the paper re. target of re contribution to the electricity demand, environmental and social benefits associated with the use of re other than cost considerations, access to the existing electricity grid by re producing organizationscompanies in the context of the 2003 interim review of the schemes of control agreements and a concrete timetable for development and wide - scale application of re

    兩個事務委員會討論載述以下各項事宜的文件:可再生源發電量占電的目標比率;除成本因素外,使用可再生源對環境和社會的效益;可再生源生產機構公司在2003年《管制協議》中期檢討的范疇下使用現有的供電網路;以及發展和大規模應用可再生源的具體時間表。
  20. In general, planning and sizing for computing requirements are based on peak demand, and, statistically, the actual utilization is of the order of 60 percent

    通常,規和設的工作都是根據峰值進行的,從統結果來看,實際的利用率不過是60 %左右。
分享友人