能量屏障 的英文怎麼說

中文拼音 [néngliángbǐngzhàng]
能量屏障 英文
enbr
  • : 能名詞(姓氏) a surname
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : 屏構詞成分。
  • : Ⅰ動詞(阻隔; 遮擋) block; hinder; obstruct Ⅱ名詞(遮擋物) barrier; block; obstacle
  • 能量 : 1 [物理學] energy; amount of energy 2 (能力) capabilities; capacity; 能量不滅 conservation of e...
  • 屏障 : protective screen; parclose; [非] scherm
  1. Hydroelectric power exploitation can reduce sediment disposal, lengthen life of power plants in lower stream, control stream, better water quality, and reduce contamination etc. considering the structure of power of sichuan province and pointing out its six problems in power development, this thesis comes up with sustainale development strategy of sichuan hydroelectric power exploitation, that is, prefentially exploit large scale hydropower plant which has good water - adapting capability, comprehensively use water resource, try to reduce cost caused by drowning, stimulate rotating exploitation, well deal with settlement of people in hydroproject construction, and alleviate contamination

    論述水電開發在減緩泥沙淤積、延長下游水電站壽命、調控水流、提高供水、改善水質、提供清潔源、減少環境污染等方面對長江上游生態建設的作用。本文研究分析了四川水電開發的可持續發展戰略,首先對四川省電力結構現狀進行了分析,指出目前四川電力發展存在的六個主要問題,從優先開發具有良好調節性的大型水電站、綜合利用好水資源,盡最大可減少水庫淹沒損失,積極推進流域梯級滾動綜合開發,處理好水庫移民關系,減輕對環境的不利影響等六個方面論述了水電開發的可持續發展戰略。
  2. A quantitative analysis on the surface of the plate composite membranes with various polymerization tune was made on the basis of the feature absorption to ir by means of attenuated total reflection - fourier transform infrared spectroscopy. the results showed that polyamide functional layer grew thick with the polymerization time going on. this indicates that the polyamide functional layer formed on the interface cannot separate the w / o phases to stop the reaction

    利用衰減全反射-傅立葉變換紅外( ftir - atr )對不同聚合時間的平板復合膜表面進行了特徵吸收定分析,研究發現,聚酰胺功層隨聚合時間不斷增厚,這說明已形成的聚酰胺功層不兩相而終止反應,相反由於哌嗪單體的分子遠低於納濾截留分子的范圍,很易擴散穿過功層達到兩相界面,繼續與有機相單體酰氯反應。
  3. A buffer distance may be inserted between the road and the buildings, or screening structures such as roadside barriers may be incorporated where practicable. however, in some cases the constraints of the site may render implementation of direct engineering remedies, barriers or enclosures not practicable. for those cases the standards laid down in the hong kong planning standards and guidelines could not be met

    我們首先小心研究道路的路線,以盡避免噪音滋擾居民,此外亦會在道路與建築物之間設置緩沖距離,或在可行情況下設立路邊隔音等隔音設施,但倘若礙于場地的規限而無法實施上述解決方案,以致未符合香港規劃標準與準則的標準,加設隔音設備以作補償成為最後逼不得已的方法。
  4. The equation of noise reduction due to the absorption will be deduced and added to the total noise reduction

    探討的吸聲性對繞射降噪的貢獻,並推導出與吸聲系數有關的繞射降噪的公式。
  5. Or lc. v. suppressed both sws and rems but increased w, and the effects showed dose dependence. moreover, the relatively smaller dose of icv injected l - name suppressed sleep and a higher systemically admistered dose was effective ( 20 times more than the former ), which suggested that the site of the sleep - suppressing action of l - name is central

    同時發現,經側腦室注射較小劑發揮作用,而經外周用藥,則需較大劑( 20倍於前者)才顯示作用,推測可外周大劑注射l - name后,其通過血腦相對較多, l - name在中樞抑制nos而發揮作用,說明l - name抑制睡眠的作用是中樞性的,並且呈劑相關關系。
  6. Because not all existing roads can be retrofitted with noise barriers or resurfaced with low - noise materials, the government explores on a case - by - case basis the feasibility of restricting the passage of vehicles that are likely to emit high levels of noise in built - up residential areas

    並非所有現有道路都適合加裝隔音或重鋪低噪音路面,故此政府會因應個別情況,研究管制可會發出過噪音的車輛(即超過一定長度或重的車輛)進入住宅大廈林立的地區。
分享友人