范井 的英文怎麼說
中文拼音 [fànjǐng]
范井
英文
sasai-
For protective female worker healthy, law set the labor range that female worker prohibits be engaged in, unit of choose and employ persons must not arrange female worker to be engaged in the following these law prohibit the labor that female worker is engaged in : ( 1 ) course of study of mine well dirty ; ( 2 ) silvan industry cutting, put in arris and banish exercise ' s charge ; ( 3 ) " physical labor intensity classifications " the 4th class in the standard the exercise of physical labor intensity ; ( 4 ) the assembly of bldg. scaffold and remove operation, and the altitude wiring of electric power, telegraphic industry works ; ( 5 ) load continuously ( point to load the frequency is in 6 times hourly above ) load every time more than 20 kilograms, discontinuous load load every time more than 25 kilograms exercise
為了保護女職工的身體健康,法律規定了女職工禁止從事的勞動范圍,用人單位不得安排女職工從事以下這些法律禁止女職工從事的勞動: ( 1 )礦山井下作業; ( 2 )森林業伐木、歸楞及流放作業; ( 3 ) 《體力勞動強度分級》標準中第四級體力勞動強度的作業; ( 4 )建築業腳手架的組裝和拆除作業,以及電力、電信行業的高處架線作業; ( 5 )連續負重(指每小時負重次數在6次以上)每次負重超過20公斤,間斷負重每次負重超過25公斤的作業。The labor range that female worker contraindication undertakes includes : ( 1 ) course of study of mine well dirty ; ( 2 ) silvan industry cutting, put in arris and banish exercise ' s charge ; ( 3 ) " physical labor intensity classifications " the 4th class in the standard the exercise of physical labor intensity ; ( 4 ) the assembly of bldg. scaffold and remove operation, and the altitude wiring of electric power, telegraphic industry works ; ( 5 ) load continuously ( point to load the frequency is in 6 times hourly above ) load every time more than 20 kilograms, discontinuous load load every time more than 25 kilograms exercise
女職工禁忌從事的勞動范圍包括: ( 1 )礦山井下作業; ( 2 )森林業伐木、歸楞及流放作業; ( 3 ) 《體力勞動強度分級》標準中第四級體力勞動強度的作業; ( 4 )建築業腳手架的組裝和拆除作業,以及電力、電信行業的高處架線作業; ( 5 )連續負重(指每小時負重次數在六次以上)每次負重超過二十公斤,間斷負重每次負重超過二十五公斤的作業。In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test
然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。Explosive workover is a new technique, which can restore casing changing well and also can restore bad break well, greatly enlarging workover extent
摘要爆炸修井工藝是一項新技術,應用該技術既可修復套變井,也可修復錯斷井,極大地拓寬了修井范圍。Standard specification for concrete masonry units for construction of catch basins and manholes
建造截留井和人孔用混凝土圬工單位的標準規范The management work data of oil - field earthquake exploration and oil - well position, which has not only data of current space position, but also entitative attribute data describing, have great capacity, traditional cad graphics describing the data plus the model database managing mode ca n ' t already adapt the modem exploration with well geography information for management work demand, so it is necessary to realize the unique management of exploration and oil - field well space data and attribute data use advanced geography information system ( gis ) technique, this thesis is based on the excellence ' s table ' s top geography information system - the maplnfo software, using the second process technique, the digital relief map and tectonic map as the base map, the earthquake exploration database as the original data, established the gis of the exploration and oil - field well in the area of the liaohe oil - field, realize visualization management, it provides a reference thereunder for the earthquake exploration deplo ying the workload and proceeding the technique design, and completed lots of practical work
油田地震勘探與油井井位管理工作數據量大,既有空間位置數據,又具有實體的屬性描述數據,傳統的cad制圖+屬性數據庫管理模式已經不能適應現代勘探和井位管理工作的需要,採用先進的地理信息系統( gis )技術,實現勘探和油田井位空間數據和屬性數據的統一管理是必然的趨勢。本文以優秀的桌面地理信息系統mapinfo軟體為開發平臺,在此基礎上進行二次開發,以數字化地形圖、構造圖為載體,以地震勘探數據庫為數據源,建立了遼河油田范圍內的地震勘探和油田管理信息系統,實現了數據的可視化管理,為地震勘探部署工作量、進行技術設計,提供了圖形和數據的參考依據。並完成了很多實際工作。Gas logging specifications for oil gas exploration well
油氣探井氣測錄井規范The measuring standards of oil and gas well position
石油天然氣井位測量規范Technical specifications for natural gas well test
天然氣井試井技術規范The downhole hydrodynamic propulsor has yet to be improved since it has some limitations in operation
但在井型的適應范圍和小曲率造斜井的施工等方面,推進器的使用還存在一定的局限性,有待進一步完善和發展。Specification for subsurface safety valve equipment
井下安全閥設備的規范Standards to acidizing design and treatment evaluation for oil well and water well
油水井酸化設計與施工驗收規范Recommended operational method for preventing of clay - swelling and fine - migration in acidizing of water injection well
注水井酸化中粘土防膨與微粒防運移工藝規范Specifications for design and manufacture of offshore anti - ice risers of oil, gas and injection wells
海上油氣水井抗冰隔水管設計與製造規范Immovable obstructions is such as car path 、 cover of sewer and paving road, the player must life the ball and drop it within one club length without penalty, but not near the hole
無法移動之妨礙物,如:球車道、噴灌排水井蓋、路梯等設施,可以在不更靠近果嶺一方的一桿范圍之內拋球,不罰桿。In view of the engineering application, the actual connotative meaning of the dual - gradient drilling technique is that the adjustable limit of the mud density is enlarged obviously
就工程應用意義而言,雙梯度鉆井技術原理的實質含義主要是泥漿密度的可調范圍變大。Application : as wall panels, ceiling panels, fire panels, waterproof panels, boxes and practical, alternative wood plywood so qiangqun, shutter, windows and doors panels, appliances, furniture and other interior decoration, can be used to place room, moist environment, such as mining projects
應用范圍:可作為墻板吊頂板防火板防水板包裝箱實用,可替代木質膠合板做墻裙門板門窗板傢具等室內裝飾用具,還可用於底下室礦井等潮濕環境的工程。Abstract : through analysing systematically the conditions of engineerin g geology and hydrogeology, the regimes of groundwater level and data of deep wells, the p aleorelief, and the groundwater levels measured during the periods of foundation investigation of each existing building, the aberrant cause of groundwater level at yangfangdian and its vicinity was derived, and the approximate scope of grou ndwater level anomalies in the above - mentioned area in march, 1999 was obtained by calculation
文摘:該文全面系統地分析了羊坊店及其附近地區的工程地質和水文地質條件、地下水位動態、深井資料、古地形及現有建築勘探時實測水位資料,指出了羊坊店及其附近地區地下水位異常的原因,並通過計算得出了1999年3月份該地區地下水位異常的大致范圍。The tuen mun river is in the north western water control zone, while kai tak nullah and two minor streams are situated in the victoria harbour water control zone, and another minor stream near sham tseng is in the western buffer water control zone. photo of tuen mun river in the 1980s
其中包括位於西北部水質管制區的屯門河,維港水質管制區范圍內的啟德明渠及區內的另外兩條小河溪,此外環保署也定期監測位於西部緩沖區水質管制區內深井附近的一條小溪。Interwell radiotracer test is a method that can obtain the information of reservoir in large scale
放射性井間示蹤測試是一種能夠在較大范圍內獲得油藏信息的手段。分享友人