蒸汽固定 的英文怎麼說

中文拼音 [zhēngdìng]
蒸汽固定 英文
vapor fixation
  • : Ⅰ動詞1. (蒸發) evaporate2. (利用水蒸氣的熱力使食物熟或熱) steam Ⅱ名詞[中醫] (將藥物隔水蒸熟) steaming
  • : 名詞1. (由液體或某些固體變成的氣體) vapour2. (水蒸氣) steam
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • 蒸汽 : vapour; reek; breath; steam蒸汽採暖 steam heating; 蒸汽錘 [機械工程] steam hammer; 蒸汽打樁鍾 ste...
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗為輔的施工工藝,養護的方法和規;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. For overterm service of unit equipment in thermal plant, taking high temperature compression part ( steam pipe ) for example, the paper introduced a three grade appraisal method and calculated the residual life of high temperature compression part using fixed asset linear method, establised a economic life mathematical mode, finally gave out a general economy appraisal for high temperature compression part with a calculation example

    針對火力發電廠機組設備的超期服役,以高溫承壓部件管道為例,以其運行工況為基礎,結合材質狀況,逐步實行三級評,計算高溫承壓部件的剩餘壽命,利用資產線性折舊法對設備進行折舊計算,同時建立經濟壽命的數字模型,綜合評高溫承壓部件的經濟性,並列舉了算例。
  3. Industrial heating equipment. safety of steam of superheated steam generators permanently manned or not. part 1 : terminology. general requirements

    工業加熱設備.人工操作或無人操作的或過熱發生器的安全性.第1部分:術語.一般要求
  4. Industrial heating equipements. safety of steam or superheated steam generators, permanently manned or not. part 2 : specific requirements for electric installations

    工業加熱設備.人工操作或無人操作的或過熱發生器的安全性.第2部分:電力設備的特要求
  5. Industrial heating equipment. safety of steam or superheated steam generators permanently manned or not. part 4 : specific requirements for commercial gas - fuelled installations

    工業加熱設備.人工操作或無人操作的或過熱發生器的安全性.第4部分:商用燃氣設備的特要求
  6. Once in the column, compounds in the test mixture are separated by virtue of differences in their capacity factors, which in turn depend upon vapor pressure and degree of interaction with the stationary phase

    當樣品進入色譜柱后,混合試樣中各組分由於容量因子的差異會被彼此分離開,分離程度取決于各組分壓和組分與相之間的相互作用。
  7. The problems needing attention in the design and construction of directly buried steam pipeline are analyzed in terms of insulation construction, moisture removal pipe, steam trap well, fixing support, pipeline welding and selection of pipeline material, and the relevant solutions are put forward

    摘要從保溫結構、排潮管、疏水井、節、管道焊接、管道材料選擇等方面,分析了在直埋管道設計與施工中應注意的問題,提出了解決方法。
  8. Material balance and energy balance equations of complex multi - effect evaporation system were expressed in matrix equation, which has the advantages of clear structure and high modularization. by holding or omitting correlation block - matrix in matrix equation, matrix equation could be used to describe the difference of forward - feed, back - feed and cross - reed multi - evaporation system with or without solid separation, extra steam being led off to preheat material liquid, condensation water flash, or solution flash. the models include design and operation

    該模型利用矩陣方程具有結構清晰和高度模塊化的特點,將復雜多效發系統的物料及熱量衡算方程組以矩陣形式表達,通過保留或舍棄矩陣中特功能模塊,模型就能代表有或無相析出、有或無引出額外預熱原料液、有或無冷凝水閃、有或無溶液閃等不同情況以及各種情況任意組合的併流、逆流、錯流多效發過程,從而實現模型的通用性。
  9. Stationary source emissions - determination of the water vapour in ducts

    源排放.測管道中的水
  10. Inert particles can prevent and clean the fouls. this kind of evaporator fit for the condensing of the glucose solution and it maybe used broadly in foodstuff field in the future

    -液-三相循環流化床發器適用於葡萄糖溶液的發濃縮,在食品工業中具有一的應用前景。
  11. My research work is carried out to this target firstly, i do my work on the many mechanisms of dehumidification & refrigeration, researching environment - protecting and energy efficient methods of dehumidification & refrigeration - - dry fixed bed dehumidification & solar energy solid absorption refrigeratioa dry fixed bed dehumidification has been put in practice successfully instead of wheel dehumidificatioa solar energy solid absorption refrigeration substitutes for evaporation compressor refrigeratioa on the bases of the researching, i integrate dry fixed bed dehumidification with solar energy solid absorption refrigeration into a whole system - - dcs, which is drived by solar energy

    然後在此基礎上,對除濕和製冷進行集成,組成一個完整的除濕製冷系統? ?太陽能開式循環除濕製冷系統,希望以此代替目前我們在工程中由乾式床型除濕和壓縮式製冷所組成的集成系統。該系統保持了既有的功能,既可以單獨進行除濕供干風或製冷供冷風運行,還可以進行除濕和製冷的協作供乾冷風運行;並且整個系統的主要能耗來自太陽能,使其環保、節能。
分享友人