蒸汽壓測定 的英文怎麼說

中文拼音 [zhēngdìng]
蒸汽壓測定 英文
vapour-pressure test
  • : Ⅰ動詞1. (蒸發) evaporate2. (利用水蒸氣的熱力使食物熟或熱) steam Ⅱ名詞[中醫] (將藥物隔水蒸熟) steaming
  • : 名詞1. (由液體或某些固體變成的氣體) vapour2. (水蒸氣) steam
  • : 壓構詞成分。
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • 蒸汽 : vapour; reek; breath; steam蒸汽採暖 steam heating; 蒸汽錘 [機械工程] steam hammer; 蒸汽打樁鍾 ste...
  • 測定 : determine; determination; setting-out; admeasurement; assignment; assay; finding
  1. Safety requirements for electrical equipment for measurement, control, and laboratory use - part 3 - 041 : conformity verification report for iec 61010 - 2 - 041 : 1995 - particular requirements for autoclaves using steam for the treatment of medical materials, and for laboratory processes

    量控制及實驗室用電氣設備的安全要求.第3 - 041部分: iec 61010 - 2 - 041 : 1995合格鑒報告.醫療材料處理和實驗室操作用高滅菌器的特殊要求
  2. Abstract : the causes for low efficiency of the heater in no. 2 crude unit of jpc refinery are described and analyzed including water leaking of steam soot blower, dew point corrosion caused by steam, soot deposits in convection chamber owning to poor soot blowing, high flue gas temperature, no heat recovery of flue gas, and poor performance of insulation lining, etc. by using sonic soot removing system, flue gas recovery system, spray coating of fiber and rock wool, as well as adjustment of flow scheme accordingly in the technical revamping. the dew point corrosion is completely eliminated, the insulation performance is improved, the heat loss is reduced by 1. 25 %, the flue gas temperature is reduced to about 170, and the heater efficiency is increased from 83 % to more than 90 %

    文摘:分析了金陵石油化工公司煉油廠二套常減裝置加熱爐存在的因吹灰器漏水,引起露點腐蝕及吹灰效果差造成對流室積灰,排煙溫度高,煙氣熱量未回收利用以及爐子保溫襯里效果差等問題,提出採用聲波除灰系統、煙氣回收系統、纖維噴塗和巖棉噴塗及相應的流程調整等改造措施.結果表明,本次技術改造解決了因吹灰器漏水所造成的露點腐蝕問題,提高了保溫效果,減少散熱損失1 . 25 % ,排煙溫度降至170左右,裝置的爐效率由83 %左右提高到90 %以上
  3. The causes for low efficiency of the heater in no. 2 crude unit of jpc refinery are described and analyzed including water leaking of steam soot blower, dew point corrosion caused by steam, soot deposits in convection chamber owning to poor soot blowing, high flue gas temperature, no heat recovery of flue gas, and poor performance of insulation lining, etc. by using sonic soot removing system, flue gas recovery system, spray coating of fiber and rock wool, as well as adjustment of flow scheme accordingly in the technical revamping. the dew point corrosion is completely eliminated, the insulation performance is improved, the heat loss is reduced by 1. 25 %, the flue gas temperature is reduced to about 170, and the heater efficiency is increased from 83 % to more than 90 %

    分析了金陵石油化工公司煉油廠二套常減裝置加熱爐存在的因吹灰器漏水,引起露點腐蝕及吹灰效果差造成對流室積灰,排煙溫度高,煙氣熱量未回收利用以及爐子保溫襯里效果差等問題,提出採用聲波除灰系統、煙氣回收系統、纖維噴塗和巖棉噴塗及相應的流程調整等改造措施.結果表明,本次技術改造解決了因吹灰器漏水所造成的露點腐蝕問題,提高了保溫效果,減少散熱損失1 . 25 % ,排煙溫度降至170左右,裝置的爐效率由83 %左右提高到90 %以上
  4. Methods of test for petroleum and its products - bs 2000 - 69 : petroleum products - determination of vapour pressure - reid method

    石油及其產品試驗方法. bs 2000 - 69 :石油產品.力的.瑞利法
  5. " determination of the bond behaviour between reinforcing steel and autoclaved aerated concrete by the " beam test " - part 1 : short term test "

    用射束試驗法鋼筋和高加氣水泥間的粘結情況.第1部分:短時試驗
  6. Fluids for hydraulic power systems. determination of vapour pressureof fire - resistant fluids, form d

    油. d級耐燃液力的
  7. Methods of test for masonry units - part 15 : determination of water vapour permeability of autoclaved aerated concrete masonry units

    圬工單元試驗方法.第15部分:充氣混凝土圬工單位水滲透性的
  8. This article emphatically discussed and analyzed following points : load command feed forward function can improve the rapid respond character of steam turbine generator ; lead of load command have advance control function on boiler main control and can highly improve the stability of main steam pressure ; the use of predict control and state space variable function can improve the quality of boiler steam temperature control effectively, control the steam temperature in the defined range and increase the boiler and turbine life and efficiency even if working state changed in a big range ; linear compensation can restrain the vibration of generator load in the condition of big loa d change

    本文重點討論、分析提出負荷指令前饋作用可以提高輪發電機快速響應特性;負荷指令的導前功能對鍋爐主控有超前控製作用,能顯著提高主力的穩性;採用預及狀態空間法能有效改進鍋爐溫度控製品質,在大幅度工況變化下仍有效控制溫度在額范圍內,提高鍋爐、輪機壽命及其效率;輪發電機組的快速響應性與輪發電機組負荷振蕩問題間的平衡關系,採用線性補償可以有效抑制在負荷變化梯度較大情況下發電機負荷振蕩問題。
  9. Determination of the bond behaviour between reinforcing steel and autoclaved aerated concrete by the " beam test " - part 1 : short term test ; german version en 12269 - 1 : 2000

    通過抗彎試驗鋼筋和高加氣混凝土粘性.第1
  10. 05. 02 vapor pressure - temperature relationship and initial decomposition temperature of liquids by isoteniscope, method of test for

    用液體力器液體的力-溫度關系和初始分解溫度的方法
  11. Liquefied petroleum gases - determination of gauge vapour pressure - lpg method iso 4256 : 1996 ; german version en iso 4256 : 1998

    液化石油氣..液化石油氣法
分享友人