蓄水位 的英文怎麼說

中文拼音 [shuǐwèi]
蓄水位 英文
impounded level
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 水位 : stage; water level
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  2. For jiangpinghe double - curved arch dam, 3 - d elasto - plastic fem is made, in which the point safety factors of the dam - abutments system and the safety margin for coefficients of sliding resistance on 7 potential sliding blocks of the dam before and after the reinforcement of the dam are calculated under the conditions of the normal storage level and the design flood level respectively based on the results from the analysis made with fem

    摘要對江坪河雙曲拱壩進行了三維彈塑性有限元分析,利用有限元應力成果分別計算了正常蓄水位、設計洪等3種工況下加固前後壩體壩肩系統的點安全系數和7個可能滑動塊體的抗滑富餘系數。
  3. This article deals with the analysis carried out in association with measured creep process before and after initial dam impoundment when landslide occurs, which suggests that the landslide undergoes both acceleration and deceleration procedures as the water level increases and ends up with retarded creep state after the water level is in stabilized status

    本課題對滑坡初期前後實測蠕滑過程進行了分析,證明滑坡在上升過程中經歷了加速和減速過程,穩定后進入減速蠕變狀態。
  4. Taking into account weather and flood forecast information ; the forecast operation manner is studied under the condition of without the change of the existing flood control standard to realize the conversion of flood control and benefits. ( 4 ) through analyzing runoff and water utilization information during reservoir operation, design flood, and the existin

    庫汛陽動態控制方法研究及其風險分析根據庫流域天氣預報、流域前期降雨、庫泄能力和防洪興利要求,利用庫汛限變動范圍,結合洪預報和短期降雨預報模型,研究庫汛限動態控制方法。
  5. Fryeburg, in south - west maine near the new hampshire border, sits on an enormous aquifer

    福萊伯於緬因州的西南地區,靠近新罕布希爾的邊界,擁有巨大的地下層。
  6. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂電站於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引隧洞長19 . 57km ,裝機360mw 。福堂電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  7. Eco mountain trail : located behind the taipei water park, it is home to a rich ecology. the trail also features historic water facilities such as the guanyin mountain reservoir

    於自來園區後方,生態豐富還有觀音山池等自來設施古跡,沿線並設置古跡及植栽解說牌。
  8. When the three - gorge reservoir is sluiced, the underground water level will ascend obviously and mechanics parameters of the slip strip below the reservoir water level can drop further, sidaogou landslide can lose stability wholly in controlled condition influenced by buoyancy of underground water and saturation stress at water level dropping

    三峽后,滑體內的地下將明顯抬高,庫以下的滑帶力學參數會進一步降低,受滑體內地下揚壓力及降落時滲透壓力的影響,四道溝滑坡在控制工況下可能整體失穩。
  9. On the basis of the study of the theory and appraise method on land use in the small towns from home and abroad, this paper at first conducts a deep study on the development and role of the small towns, indicating that its development has sawn an uneven development phrase and becomes a carrier of the enterprises, a pool of surplus laborers, a hub of material exchanges between the rural and urban areas, a base of spiritual civilization, an important way to achieve urbanization. second, it conducts a study on the situation and features and the problems the land use, indicating that the efficiency of the land use is low, which has a direct influence on the development of agriculture and the role of the small towns. and the study of the demand of the land indicates the shortage of land is serious, and the small town must rationally use the land and increases its intensive role and the economical efficiency to meet the demand

    在分析國內外已有關于小城鎮土地利用的理論與評價方法的基礎上,首先對小城鎮在我國的發展、地和作用進行了深入的分析,判明我國小城鎮發展經歷了一個曲折向上的發展階段,已成為鄉鎮企業的載體,農村剩餘勞動力的池,城鄉物資交流的樞紐,農村精神文明的基地,是我國城市化的重要途徑;其次,對小城鎮土地資源利用現狀和特徵進行了探討,並對發展小城鎮建設導致的土地利用問題進行了剖析,表明目前我國大多數小城鎮土地效益和規模效益低下,佔用耕地過多,直接影響農業的發展,影響小城鎮的地和作用;通過小城鎮土地供需分析研究表明,我國土地短缺十分嚴峻,小城鎮土地需求缺口較大,小城鎮必須合理利用現有土地,增強集約功能和土地經濟效益,從而緩解需求壓力;最後,論文通過運用特爾菲法,描述統計分析法、多元統計分析(主成分分析)法和系統分析法中的層次分析法( ahp )等一系列方法,結合定性和定量兩方面,從土地質量、土地資源數量與結構、土地經濟效益、環境效益、社會效益等五個方面進行分析,篩選、建立了土地資源利用評價指標體系,在因子評價的基礎上,建立了土地利用綜合評價模型,並給出了評價過程和方法。
  10. The water levels is correlated to seismicity. hypocentrum move to the top of reservoir, and form two seismic concentrated place - linmal2o3han and songwan

    蓄水位和地震有著明顯的正相關性,震區由庫尾移向庫首,並在丹庫的林茂山和宋灣形成了兩個地震密集區。
  11. After the reservoir sluices, the national highway 213 in this area will be submerged. so the national highway 213will increase its elevation to about 920 meters. in order to estimate the influence of the slope - sliding and bank - collapsing which caused by the reservoir sluices to the elevated highway, and to estimate possible emigration problem, stability analysis of landslide body no. l, 2, and 3 in i, ii area which located in bank accumulation body of zipingpu reservoir in national highway 213 is made by transfer coefficient method and 2 - d 3 - d fem in this paper

    紫坪鋪庫正常蓄水位高程877m ,后將淹沒該段現國道213線,因此國道213線將改線抬高至920m高程附近,為正確評價因造成的滑坡、塌岸對改線公路的影響,以及可能產生的移民問題,本文用傳遞系數法和二維、三維有限元方法對有可能失穩的213國道紫坪鋪庫區庫岸堆積體、區的1號、 2號、 3號滑坡體進行了穩定性分析。
  12. Trough the analysis of stabilization safety on tengzigou arch dam, some conclusions are obtained in the following : ( 1 ) tengzigou arch dam is safe under normal poll level ; ( 2 ) stabilization safety factor of tengzigou arch dam is about 4 - 5 ; ( 3 ) it is proved that combinatorial reinforcement measures are effective and feasible

    對藤子溝拱壩的數值計算和模型試驗分析表明: ( 1 )藤子溝電站在正常蓄水位作用下,壩體和兩岸壩肩是穩定的; ( 2 )藤子溝拱壩的整體安全度大概為4 5左右; ( 3 )東北院提出的對左岸泥巖層挖除處理並用混凝土置換的加固除險措施經研究表明該加固措施是有效、可行的。
  13. The study shows that the most likely sliding path is located shallowly under the rock bed and the sliding path runs close to a line from tensile area at dam heel to dam toe. staircase sliding paths buried less than 14 meters bellow dam heel are also dangerous, but they are not the most dominant

    研究表明,最危險滑移路徑處于壩基面以下淺層,滑移通道為從上游壩踵拉裂區沿近直線方式向下游壩趾滑出;正常蓄水位時, 9b 、 4b壩段最危險滑移路徑安全系數分別為k _ s = 4 . 15 、 3 . 05 。
  14. Based on the project scale argumentation of letan hydropower station, the paper briefly introduces the main results of scheme ' s technical & economical comparison and the main factors of scheme option in the option and design stage of the normal storage water level and installed capacity, as well as the evaluating opinions given by the specialist group of project proposal evaluating committee ; the main technical characteristics for similar project scale argumentation are summarized up according to the project scale design argumentation of letan hydropower station

    摘要通過樂灘電站工程規模論證,簡述該工程正常蓄水位選擇和裝機容量選擇設計階段方案技術經濟比較的主要成果、取捨方案的主要因素、以及項目建議書評估會專家組的評估意見;並根據樂灘電站工程規模設計論證總結類似工程規模論證時的主要技術要點。
  15. When the paper uses the optimization regulation, it divides the management time into " t " stages according to ten days to make up the decision having many stages of the reservoir ' s optimization regulation, and it takes the reservoir ' s retain quantity of water or retain status of water and confiscated quantity of water a s condition variable, takes the water quantity of drawing off or quantity of electricity as decision variable. when the confiscated quantity of water can be known or be forecasted in every stage during the period of management, that is to say the confiscated water process can adopt the determined process, we can make up determine dynamic plan model with many stages and take the minimal lacking water as objective function

    在動態規劃方法中把庫的整個調度期,按句劃分為t個時段,以庫的量s或蓄水位z和入庫量q作為狀態變量,以庫放量q或電站出力n或發電量e作為決策變量,構成一個多階段決策過程,當計劃調度期內各時段的入庫徑流量已知或可以預報,即入庫徑流過程可以採用確定性徑流過程時,分別按缺量d最小作為目標函數建立多階段確定性動態規劃數學模型。
  16. The water level of the three gorges reservoir reached the predetermined 135 meters tuesday, five days ahead of schedule

    本周日,三峽蓄水位到達135米高程,提前5天到達計劃儲目標。
  17. Based on the analysis of navigation benefit, this paperpoints out the problems existed and the necessity of the raise of the three gorges reservoir ' s impoundment level

    文章對此作了概略分析,並指出存在問題和及時抬高三峽蓄水位的必要性。
  18. However, the correlated property gradually disappear and seismic activity decrease when water levels come to the highest levels of the fist stage project and correspondingly trigger earthquake with 4. 7 magnitude

    但是,研究表明,當達到一期工程最高,並誘發了4 . 7級地震后,蓄水位和地震的相關性逐漸消失,地震的活動性明顯降低。
  19. The selection of impoundment level and dam site, the general layout, the design optimization of structures, construction diversion and construction period all are the important context of the design of hydropower station across river with low head

    蓄水位選擇、壩址選擇、樞紐布置、建築物設計優化、施工導流與工期等是低頭河床式電站設計的重要內容。
  20. 6. the three gorges reservoir officially began to store water as the sluice gate started to close at 00 : 00 on june 1. on july 10, the first power generator of the project, the largest of its kind in the world, was connected to the power grid to begin generating electricity

    三峽利樞紐6月1日開始下閘, 6月15日至135米的初期蓄水位6月16日,雙線五級船閘開始試通航7月10日,第一臺發電機組比計劃提前20天並網發電。