蓄水證 的英文怎麼說

中文拼音 [shuǐzhèng]
蓄水證 英文
stagnated fluid syndrome
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞(證明) prove; verify; demonstrate Ⅱ名詞1 (證據) evidence; proof; testimony; witness 2 (...
  • 蓄水 : [水文] retain water; store water; [土] impound蓄水池 pool; reservoir; source; cistern; lasher; pi...
  1. A reservoir is built in housetop, have structure of wall of edaphic lay aside, some of alga, fish is put inside, form small - sized ecosystem with assuring water quality fresh

    在屋頂建設一個池,有土壤貯壁結構,裏面放些藻類、魚類,形成小型生態系統以保質的新鮮。
  2. This article deals with the analysis carried out in association with measured creep process before and after initial dam impoundment when landslide occurs, which suggests that the landslide undergoes both acceleration and deceleration procedures as the water level increases and ends up with retarded creep state after the water level is in stabilized status

    本課題對滑坡初期前後實測蠕滑過程進行了分析,明滑坡在位上升過程中經歷了加速和減速過程,位穩定后進入減速蠕變狀態。
  3. For accumulating heat from piping and making as even the temperatures in various spaces betwiin pipes an possible, gravel foundation is first laid, mortar is mixed fully by mixing ratio of 1 : 2, the floor is finished level and then perfect curig in damp condition is carried out

    為保管路間熱和溫度均勻應鋪下砂礫層后進行配比為1 : 2的灰漿完成處理,不僅要保地板平,還要在濕潤狀態下自然乾燥,使得到徹底的養護,人為的養護會導致地板雛裂,應予以注意。
  4. Main results are as follows : ( 1 ) the analysis about water supply source. this paper analyzed the river water without and with configuration engineering to sure the reliable quantity of surface water ; analyzed the underground water source near river and in the urban to sure the reasonable quantity of exploitation, considered the recycle of sewage, evaluated the ability to the ensure city water supply

    對地表源包括無調工程的峪(河)、有庫控制的峪(河)進行文分析,確定地表的可利用量;對傍河地下源和城區自備井所開采地下源進行分析,確定地下的合理開采量;並考慮污回用,對城市供源綜合保能力進行全面評估。
  5. By analyzing the rainfall use efficiency, the soil moisture variation during the whole growth period, the economic characters and the output of dry land corn under different film mulch modes, it has been proved that the mode of whole covering on double ridges and planting in catchment furrows is an effective way to store and utilize fully the natural rainfall, to improve soil moisture conservation, to raise rainfall use efficiency, to advance maturity time, and to increase yield and economic benefits of dry - land corn remarkably

    摘要通過對旱作玉米幾種不同覆膜栽培模式降利用率、玉米整個生育期的土壤分監測、生育時期觀測、經濟性狀及產量分析明,旱作玉米雙壟面全膜覆蓋集雨溝播技術是一項充分接納和利用天然降、最大限度保土壤分、顯著提高降利用率、提早成熟、增產效果明顯、經濟效益顯著的旱作玉米栽培模式。
  6. The research of system makes the observational information of tongbo dam realize standardization manage, tidy up and analyze the information quickly and exact, give the environmental physics number and diagnostic numer of displacement, stress and seepage, build the mathematical model of each observational information, evaluate the working modality of the dam, thereby ensure safe working of the dam

    系統的研製使桐柏抽能電站的觀測資料實現規范化管理,快速、準確地整理、分析觀測數據,給出環境物理量及位移、應力和滲流等觀測效應量的特徵值,建立各觀測效應量的數學模型,分析評估大壩的工作形態,從而保大壩的安全運行。
  7. Based on the project scale argumentation of letan hydropower station, the paper briefly introduces the main results of scheme ' s technical & economical comparison and the main factors of scheme option in the option and design stage of the normal storage water level and installed capacity, as well as the evaluating opinions given by the specialist group of project proposal evaluating committee ; the main technical characteristics for similar project scale argumentation are summarized up according to the project scale design argumentation of letan hydropower station

    摘要通過樂灘電站工程規模論,簡述該工程正常位選擇和裝機容量選擇設計階段方案技術經濟比較的主要成果、取捨方案的主要因素、以及項目建議書評估會專家組的評估意見;並根據樂灘電站工程規模設計論總結類似工程規模論時的主要技術要點。
  8. 1 the company has excellent production condition and public facilities such as self - provide power plant supplying high voltage wire of 35 kv, two sets 16000 kva transformers in power station, one deep well with water discharge of tons per hour, water pool with water pcapacity of 150 tons, one water tower with 100tons, two boilers with four tons, three compressed air machines to make sure the requirement of production. the company located at no. 62haozhuang st. taiyuan city and is 0. 7 kilometer away from dongshan expressway and also 2. 5 kilometer away from the railway station. the company was also equipped with communication facilities for example international telephone and fax

    該公司具有良好的生產條件及公用設施:有自備電廠供給35kv高壓進線,變電站16000kva變壓器兩臺深井一眼,每小時出50噸池150噸塔1個,容量100噸4噸鍋爐兩臺,空壓機三臺,保生產需求。公司位於太原市郝莊正街62號,距東山過境公路0 . 7公里,離車站貨場2 . 5公里,交通十分便利。有國際電話及傳真機等通訊設施。
  9. It is, of course, up to each individual to make his or her own judgement about the relative merits of different forms of saving, but i would imagine there to be considerable numbers who, especially if they are planning to invest for a period of time, and given the probably greater focus on yield comparisons in today s overall low interest rate environment, will be attracted by the particular combination of yield and security which the hkmc is offering

    債券發行計劃的零售部份會同樣受歡迎。當然,視乎每個人對不同的儲方式的不同優點會有不同見解,但本人認為,以按揭券公司發售的債券相對的回報與保障,將可吸引到一定的投資者,尤其是那些計劃較長線投資的人士,加上現時息口處于偏低平,投資者會更著重收益率。
  10. It also puts forward logical explanations to a few facts that are still unable to be explained, up to now, by the classical consumption models. however, for the scholars in china, the cognition of the buffer - stock theory still remains at a superficial level of only providing simple theoretical introduction to it. a finer depiction and empirical application of it will not only facilitate studies on the related theories in china but also do great benefit to the development of the buffer - stock theory itself because china is admittedly one of the

    本論文的主要發現及創新包括:在理解和刻畫我國居民的預防性儲行為時,緩沖儲備模型要優于以儲平量作為被解釋變量的模型;核密度估計方法對不確定性的描述更準確;從儲率變化率的角度進行的格蘭傑因果關系檢驗實了我國的居民存款儲對經濟增長有推動作用;養老金的變化對我國居民儲行為具有顯著影響,而我國現有的醫療保障體系沒有發揮其應該能夠發揮出的作用。
  11. The assembly line is under computers automatic control and inspection, of which both the technology and equipment have reached the international advanced level. in the year of 2005, changhai has once more introduced the international advanced product line for fiberglass tissue mat, promoting the technology strength and the production at a large step. equipped with 60 professional technicians, an advanced lab and research development center, the company bears strong abilities of developing new products ; guaranteed with such solid technology strength, changhai is able to produce specific chopped strand mats of 100g, 120g for the inner roofs of automobiles as well as various glass fiber mats and to produce products of special specifications according to customers order

    目前,長海擁有大型生產線10餘條,其他配套設備50多臺套,公司擁有先進的薄氈短切氈生產線,電池隔板生產線,玻纖方格布網格布織機復合氈織機,針織氈設備,以及各種塗塑分切設備等,流線生產採用全自動電腦控制和監控,技術力量與設備都達到國際化先進平2005年,長海再次引進國際先進的玻纖薄氈生產線,企業技術實力與產量再次得到大規模的提升公司有著極強的產品研發能力,擁有專業技術人員近60餘名和先進的實驗室與研發中心雄厚的技術實力保,使長海公司在國內率先能生產100克120克汽車內頂用特殊短切氈,玻纖各種薄氈,並能為用戶定製生產特殊規格的玻纖製品。
  12. As a peaking power plant, the gas turbines are usually taken as the alternatives of the pumped storage power plant for its economic evaluation

    能電站作為一種調峰電站,在論其經濟性時,替代電源的選擇是非常關鍵的。
  13. The flood detention and storage capacity of several billion cubic meters of hongze lake has been recognized for a long time, but the resistance of fiver - lake string has always been ignored, based on an analysis of historical information about flood events, the harmfulness of plain fiver - lake string was revealed, then, the necessity for implementation of fiver - lake separation in regulation of the huaihe river was verified, and a reasonable scheme for fiver - lake separation and a feasible modeling method for scientific demonstration were also put forward

    摘要針對長期以來人們只認知洪澤湖的幾十億立方米防洪調能力,卻漠視它的河湖串阻力及其一級尾閭地位的情況,通過對歷史洪和有關資料的分析,初步揭示平原河湖串的危害性,由此引進一步治理淮河實施河湖分離的必要性,並提出一種合理的河湖分離方案,以及比較可行的模擬論方法。
  14. On the basis of the investigation in situ and the analyzing of the datum collecting, this paper studies the dynamic character of the groundwater seepage field and thoroughly demonstrated the change character of the stability of he reservoir bank in fengjie section during the process of water storing and normal operation of the three gorge reservoir. the result provides scientific basis for the city ' s constructing

    本文在現場調研和資料收集的基礎上,將三峽、正常運行對岸坡滲流場的作用貫穿于整個岸坡穩定性研究中,從而詳盡、真實地論了奉節新城址庫岸的穩定性,為奉節新城建設提供了科學依據。
分享友人