蓄洪量 的英文怎麼說

中文拼音 [hóngliáng]
蓄洪量 英文
storage capacity
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 洪量 : 1. (大的氣量) magnanimity; generosity2. (酒量大) great capacity for liquor [drinking]
  1. Abstract : this paper analyzes causal factors of flood in the middle reaches of changjiang river. due to neglection of environmental management, soil erosion in the upper and middle reaches of the changjiag river, lake sedimentation, large - scale reclamation of marshes, the flood regulation capacity of the lake was descended, and flood stage was risen and prolonged. consequently more and more river levees and lake dikes were reinforced almost every year to prevent the disasters, which made flood level go up and flood period last for more days. the frequency of flood and waterlogging disasters rose and their damage was enlarged. several proposals for flood prevention including agricultural modernization are put forward

    文摘: 1998年長江大水后開始實施的「平垸行,退田還湖」的土地利用調整方案,從長遠來說應尋求農業安全且收入逐漸提高條件下的土地利用,長江中游地區應積極推進農業現代化,提高農業勞動生產率,轉移,減少分區的人口,移民建鎮,對區內的土地要促進其規模經營,由優秀的有文化的農民經營,平時只有少的直接從事農業生產的經營管理人員,農忙時則大地使用季節性合同工或實現機械化,大水時退田還湖,減輕長江幹流大水的壓力,減少分與特大災時的損失,這樣還可促進避、冬季農業等的發展,也有利於長江中上游地區陡坡耕地的退耕還林,還可在糧食充足時進行休耕,在旱災、糧食緊張時擴大糧食生產?
  2. It is difficult to be settled by classical theories because of fixed quality and quantity. this thesis bases on the improvement of traditional way, overcomes its i ack experience, takes the more advanced fuzzy decision - making and optimal selection theory, researches into the established model and gets the result that it ' s best to set pangtoupao storage and detention flood area on the left side of menjiang river by comparing the four schemes and ten objectives of fixed quality and quantity. the result holds identical views with the result of usual economic evaluation. so it ' s the first time using fuzzy decision - making and optimal selection theory to resolve the important and pragmatic problem comprehensively and scientifically

    本文在總結用傳統的方法研究經驗與不足的基礎上,採用目前較先進的模糊優化理論及建立起的模型進行區設置及規模研究,通過對嫩江四個區方案, 10個定性定目標的優化比選,得出在嫩江左岸設置胖頭泡區最優,其優選結果與採用常用經濟評價方法所得結果基本一致,從而第一次用模糊優化理論較全面科學地解決松花江流域防工程中確定區規模這一重大實際問題。
  3. By analyzing risk sources and those uncertain factors affecting the risk, the diversion risk is defined as the probability of the maximum discharge after being adjusted and held higher than the maximum design flood

    通過對導流風險來源和引起導流風險的各種不確定性因素的論述和分析,把施工導流風險定義為天然來()水經過調后,導流泄水建築物的最大泄水流超過其設計最大泄水能力的概率。
  4. By adopting reflection engineering method, the market value method and carbon tax revenue method, the estimated total value of the wetland ecosystem service funcation was 6207. 83 10 ^ 8 yuan / year

    功能價值大小依次為:降解污染大氣組分調節調水氣體調節科研文化和生物棲息水源涵養。
  5. ( 2 ) a series of experiments on time scale distortion are made with real river model, inflow and outflow boundary condition, and continuous simulation. by means of analysis of the experimental data on model water level, water - surface gradient, cross velocity, outflow discharge process and the sediment transportation capacity, the main physical reasons for the above hydraulic parameters deviations caused by time scale distortion are illustrated : response delay of model channel storage capacity and rate of water level with time

    ( 2 )採用真實的河工模型和入出流邊界控制條件以及連續模擬的方法進行了有關時間變態率的系列試驗,通過模型水位、比降、流速、出口流過程線和斷面挾沙力試驗資料的分析,闡明了時間變態引起上述各種水力參數偏離的主要物理原因:模型的槽響應和水過程時間變化率的響應滯后。
  6. Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir

    本文從青銅峽水庫泥沙淤積入手,分析水庫泥沙淤積特性和庫區圍墾堤開發利用淤積灘地的現狀,對防安全及工程安全的影響、侵佔大的有效調庫容、造成同級流下水庫水位抬升水庫回水上延、對沿岸及過河建築構成影響、因水位抬升致使庫區周邊灌區地下水排水不暢乃至倒灌而造成土地鹽堿化、對水庫庫區大淤積灘地無序圍墾造成旅遊資源破壞等五方面影響的定性分析,提出庫區圍墾堤是水庫水位抬升的重要原因。
  7. According to our analysis, the farmers in quzhou are in the second phase, which means they already have enough food and put much more inputs for earning high yield and high income. ( 4 ) the ground water table was getting down, caused by precipitation decreasing, no river water coming due to the upstream reservoir, complete drainage in rainy season and irrigation using groundwater

    ( 4 )自然降水的降低、上游水庫的攔,使平原失去了獲得水源的機會;內部防排瀝體系的完善,致使入滲補充地下水減少;耕地灌溉率的增加,導致農業用水不斷加大,這些因素共同作用使區域水資源失去平衡,引起地下水位的下降,從而促使鹽漬土表層脫鹽。
  8. Since dams can ‘ t be filled until the risk of flooding is past, the models predict they will trap just 70 to 85 per cent as much run - off as they do now

    由於水壩只有在水泛濫的危險過去后才能滿水,模擬研究預計它們攔阻水的能力只是目前水平的70至85 。
  9. In west kowloon, good progress has been made on the stage i and ii drainage improvement works which are scheduled for completion in 2003 and substantial completion in 2004, respectively. in order to minimise the extent of road openings caused by the extensive drainage improvement works, construction of an underground flood storage tank

    為了盡減少在西九龍區因進行排水改善工程而須掘路的范圍,渠務署於二零零一年年初在大坑東游樂場地底興建容達十萬立方米的池,以及在九龍塘興建一條長1
  10. It holds the main and tributary streams from six provinces situated at the upper reaches of yangzi river. the three gorges project being built is an extraordinarily gigantic water - control project and has the functions of generating electricity, controlling flood, shipping and travelling

    這里正興建當今世界矚目的特大型三峽水電樞紐工程,它具有發電、調、航運、旅遊等多種功能,由其構成的水庫總近400億立方米。
  11. The new project, dreamed up around a decade ago, would tap excess water from the white river when it floods and pump it, at the rate of about one billion gallons a day, to storage tanks on around 1, 000 rice farms

    大概十年前人們就夢想有這樣一項新的工程,能在懷特河發生災時對上漲的河水進行引流,並以每天10億加侖的流將其抽入大約1000個水稻農場的水池中。
  12. The construction of middle and small - size reservoirs is impact - profound human activities. this paper aims to conduct flood - routing of designed inflow floods of downstream reservoirs under consider ation of existence of upstream middle and small - size reservoirs, quantitatively analyze the degree of impact of the upstream reservoirs " dam - break floods or flood - regulating functions on design inflow floods of the downstream reservoirs

    上游修建多個中小水庫就是一種較大規模的人類活動,本文研究旨在考慮上游多個中小水庫影響的條件下,對現有的下游水庫設計入庫水過程進行調演算,定分析上游中小水庫的泄對下游水庫設計入庫水過程調度的影響程度。
  13. The engineering of the storage and detention flood area is one of the important flood protection engineering in the songhuajiang river valley. the storage and detention flood area can resolve the flood problem basically in haerbin. at the same time, it works out a solution to the core problem in songhua jiang river valley. the installation has a lot of factors

    區工程是松花江流域內防工程的重要工程之一,區能夠基本解決哈爾濱市防問題,同時也很好解決松花江流域防核心問題,而區設置涉及許多影響因素,既有定性,又有定的,難于用經典理論技術來解決。
分享友人