行字井 的英文怎麼說

中文拼音 [hángjǐng]
行字井 英文
xingzijing
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • : Ⅰ名詞1 (文字) character; word 2 (字音) pronunciation 3 (字體) form of a written or printed ...
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. The management work data of oil - field earthquake exploration and oil - well position, which has not only data of current space position, but also entitative attribute data describing, have great capacity, traditional cad graphics describing the data plus the model database managing mode ca n ' t already adapt the modem exploration with well geography information for management work demand, so it is necessary to realize the unique management of exploration and oil - field well space data and attribute data use advanced geography information system ( gis ) technique, this thesis is based on the excellence ' s table ' s top geography information system - the maplnfo software, using the second process technique, the digital relief map and tectonic map as the base map, the earthquake exploration database as the original data, established the gis of the exploration and oil - field well in the area of the liaohe oil - field, realize visualization management, it provides a reference thereunder for the earthquake exploration deplo ying the workload and proceeding the technique design, and completed lots of practical work

    油田地震勘探與油位管理工作數據量大,既有空間位置數據,又具有實體的屬性描述數據,傳統的cad制圖+屬性數據庫管理模式已經不能適應現代勘探和位管理工作的需要,採用先進的地理信息系統( gis )技術,實現勘探和油田位空間數據和屬性數據的統一管理是必然的趨勢。本文以優秀的桌面地理信息系統mapinfo軟體為開發平臺,在此基礎上進二次開發,以數化地形圖、構造圖為載體,以地震勘探數據庫為數據源,建立了遼河油田范圍內的地震勘探和油田管理信息系統,實現了數據的可視化管理,為地震勘探部署工作量、進技術設計,提供了圖形和數據的參考依據。並完成了很多實際工作。
  2. If you wish to set such a key you must first remove the leading hash mark that marks it as a comment

    如果您希望設定這些值,您必須先移掉該首的號。
  3. In view of the poor stop accuracy, unstability of climbing at reduced or low speed and over - winding of mine ac lift when power braking is used, a siemens all - numerical rectification device is applied in the braking system of mine lift and its control mechanism and method are described

    針對採用動力制動礦交流提升機停車準確率差,減速與低速爬不平穩及產生過卷的問題,將西門子全數整流裝置應用到提升機制動控制系統,並介紹了該系統的控制原理與方法。
  4. Abstract : in view of the poor stop accuracy, unstability of climbing at reduced or low speed and over - winding of mine ac lift when power braking is used, a siemens all - numerical rectification device is applied in the braking system of mine lift and its control mechanism and method are described

    文摘:針對採用動力制動礦交流提升機停車準確率差,減速與低速爬不平穩及產生過卷的問題,將西門子全數整流裝置應用到提升機制動控制系統,並介紹了該系統的控制原理與方法。
  5. Using digital logging data of logging curves to resume lithology section, based on single well sedimentary facies analysis of cored well, typical sedimentary microfacies and the corresponding electrofacies models are established. each after extracting the essential factors of logging curves, each logging microfacies recognize model are set up to automatically identify sedimentary microfacies by the method of bayes identification and neural networks technical

    利用測曲線的數化資料,進巖性剖面恢復,通過取芯建立沉積微相模式及測相模式,提取測曲線形態要素參數,用bayes判別法進沉積微相自動識別程序。
  6. Method to replace linefeed characters with something a pound sign, in this case that isn t quite so visually disruptive to console output when it s displayed

    方法,將換元替代為其它元(本例中是號「 # 」 ) ,以便在顯示控制臺輸出時,該輸出看上去不是斷開的。
  7. After column form installation, overall inspection and aligning shall be done for the cross dimension, axis, elevation and verticality, and then connect each column “ 井 ” shape rack as overall stable structure

    柱模安裝基本完畢后對斷面尺寸、軸線、標高、垂直度等進全面檢查校正後再進固定,並將各柱架之間連成一體,形成穩定整體結構。
  8. When dicussing reliability design and reliahbaiiy ensuring methods, a new reliability calculating model of petroleum logging tools is presented, reliability assurimg technologies should be taken in petroleum logging tools and their using approaches are presented and stated from electricity design and mechanical design, reliability system model of petroleum logging tool is set up according to the latest reliability theory, reliability indexes of petroleum logging tool and their acquiring ways are discussed, the reconmended reliability indexes ( mwture, nolwnm, mtbf, mttf ) of petroleum logging tool are presented : the mean working time under rated error ( mwture ) of the new tool is obtained through experiments. when studying data processing methods, the property of gamma - ray signal is stated and the type of it ' s measuring error is examined using statistical method, the basic theory of digital filtering and the basic situation of digital filtering methods are introduced and analyzed, the factors affecting digital filtering effect to gamma - ray signal and the effect of digital filtering to logging curve are analyzed, the evaluting criteria ( rvi, rmse, sfi ) of digital filtering effect are set up from two aspects, named as real value acquiring of steady section and the formation boundary checking and processing, the related filtering methods and examining methods are given out. the design methods of digital filter used to process gamma - ray signal are discussed, the mixed filtering scheme of natural gamma - ray log is presented, the realization ways are discussed. the selective filtering system and it ' s realization flow are given out through quantitive reseaching to part of digital filters, three new filtering sheme will be used to process gamma - ray signal in era2000 logging system

    在探討可靠性設計與可靠性保障技術時,提出了石油測儀器的可靠性計算新模型,從電氣和機械兩個方面,提出並闡述了應採用的可靠性保障技術及其使用方法:根據最新可靠性理論,建立了石油測儀器的可靠性系統模型,探討了石油測儀器的可靠性指標及其獲取途徑,提出了推薦使用的石油測儀器可靠性指標( mwture , nolwnm , mtbf , mttf ) ;通過試驗,得到了所設計儀器的穩定工作時間( mwture ) 。在研究數據處理方法時,闡述了伽瑪信號的特徵,對測量誤差類型進了統計檢驗;介紹了數濾波的基本理論、數濾波方法的概況,並進了分析;對伽瑪信號數濾波效果的影響因素及其對測曲線的影響進了基本分析;從獲取平穩段真值、地層邊界的檢測與處理兩個方面,建立了數濾波效果的評價準則( rvi , rmse , sfi ) ,給出了相應的數濾波方法及效果評價方法;探討了自然伽瑪信號數濾波器的設計方法,提出了適合自然伽瑪測的混合濾波方案,探討了混合濾波方案的實現途徑;通過對部分數濾波方法的定量研究,給出了靈活可選的數濾波系統構成及實現流程;提出的三種濾波方案,將用於era2000成像測系統,對自然伽瑪測數據進濾波處理。
  9. Feasibility analysis on the method of measuring crossing basic point building of the anxiliary shaft of tunliu coal mine

    屯留煤礦副測量十基點建立方法可性分析
  10. Moreover, the logging interpretation model of reservoir parameters is established based on the data of the 14 cored wells, and the various reservoir parameters are calculated based on the secondary digital process of log data of 388 wells within the area the petrophysical feature of reservoir rock, the distribution of reservoir parameters and reservoir heterogeneity, as well as their variability law during water injection, are defined quantitatively

    以14口取心資料為基礎,建立了參數解釋模型,並對全區388口了測資料二次數處理,求取了各類儲層參數。對儲層的宏觀非均質性、微觀孔喉結構及滲流特徵進了量化描述,並研究了注水開發過程中儲層物性參數的變化規律。
  11. In this article, grid - beam structure by simply supported on foursides in the engineering is discussed. its calculated method of internal force and displacement under uniform load and choosing section to control the wide of crack is studied also

    本文針對工程中常見的四邊簡支、正交的梁結構進討論,研究了該結構受均布荷載作用下的內力及位移的計算方法,以及截面選擇、裂縫寬度控制方法等。
分享友人