裂隙玄武巖 的英文怎麼說

中文拼音 [lièxuányán]
裂隙玄武巖 英文
fissure basalt
  • : 裂動詞[方言] (東西的兩部分向兩旁分開) open
  • : 名詞1 (縫隙; 裂縫) crack; chink; crevice 2 (空閑) gap; interval 3 (漏洞; 機會) loophole; op...
  • : Ⅰ形容詞1 (黑色) black; dark 2 (深奧) profound; abstruse; recondite 3 (不實在; 靠不住) unrel...
  • : Ⅰ形容詞1 (關于軍事的) military 2 (關于技擊的) connected with the art of attack and defence in...
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • 裂隙 : crack; crevice; fracture; cleftiness; fissure; slifter; crevasse裂隙冰川 crevassed glacier; 裂隙...
  • 玄武 : 1 (烏龜) tortoise2 (二十八宿中北方七宿的合稱) seven constellations of northern sky3 (道教所...
  1. The le - an oil field is located on the southern slope of dong - ying sag. there are two sets of ek basalt in its western block. depending on the drilling, the logging and the seismic date, tha ek basalt has the characteristics of high resistancs, the low sound wave defferance and faradic conductance, the smooth curve of self potential

    樂安油田位於東營窪陷南斜坡上,其西區發育了兩套孔店組,根據鉆井、測井、地震資料,孔店組具有電阻率高、聲波時差值和感應電導率值低、自然電位曲線平直的特點,地震波呈板狀強反射;沉積期該區有有二次火山活動,平面分佈比較穩定,噴發方式為「式噴溢」 ,火山口分別位於草12和草31井附近。
  2. Field investigations found that epigenetic reworking deformation fracture include 3 types, named normal relief fracture, fracture filled mud and epigenetic reworking of disturbed belts. and epigenetic reworking of rock mass structural also includes gradual deformation of the blocks that are made up of different attitudes structural planes besides normal relief. through field geological investigations, the features of rock mass structural planes are generalized, especially development laws of interlayer shearing belts, instrastratal shearing belts, faults and base crack

    在已有研究成果基礎上,總結了壩區相特徵和構造應力場對體結構的影響;通過現場調查,總結了3種類型淺表生變形破,即正常卸荷型破、鬆弛夾泥型破和緩傾角錯動帶表生改造;通過野外地質調查,總結了層間錯動帶、層內錯動帶、斷層和基體的發育規律。
  3. I ts d am height i s 2 87m, equipped capacitor 12000mw and permian emei mountain basalt is the main strata in dam site. field investigations show that there are discontinuities such as interlayer shearing belts, instrastratal shearing belts, faults and base crack. the discontinuities control the stability of rock mass against high arch dam shoulders anti - sliding stability which is the main engineering geological problems in dam site

    壩區地層主要為二疊系峨眉山,調查表明,中存在由緩傾角的層間、層內錯動帶和斷層、構成的體結構體系,對壩區的主要工程地質問題,尤其壩肩抗力體的抗滑穩定性具有重要的控製作用。
  4. Geologists have long known that water leaking into faults can trigger earthquakes, and nine days is about the same amount of time that they estimate it takes water to work its way down through cracks and pores in kilauea ' s fractured basaltic rock to a depth of five kilometers ? where the silent earthquake occurred

    科學家早就知道,水要是滲進斷層之內便會引發地震,而他們估計,雨水從縫和孔滲入奇勞亞火山破所需的時間,正好就是九天;滲透的深度達五公里,也就是無聲地震發生的地方。
分享友人