裝配成本 的英文怎麼說
中文拼音 [zhuāngpèichéngběn]
裝配成本
英文
assembly cost- 裝 : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
- 配 : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
- 成 : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
- 本 : i 名詞1 (草木的莖或根)stem or root of plants 2 (事物的根源)foundation; origin; basis 3 (本錢...
- 裝配 : assemble; fit together; fit out; assembling; fitting; rigging; erecting; fabrication
-
Ford ' s great contribution was to really see where the future of the market lay, which turned out to be in cheap cars for the masses and he developed not only a cheap car but a very good car, his model t ford and developed the assembly line process for producing it cheaply
福特的偉大的貢獻表現在他成功的預見了市場- - - - -大眾市場的便宜車,他不僅生產出了便宜車,還生產非常好的車,如t型福特車,並且改進了裝配流程,以降低生產成本。Orbit non - friction ball valve is a new type of valve and realizes non - friction switching and metal pressurization of the valve by cam mechanism. this paper researches the design of orbit non - friction ball valve mechanism and its computer aided design. the main work and the result are as follows : the author puts forward the kinetic analysis method of orbit non - friction ball valve, analyses the track and motion space of the conglobulation for switching etc, and brings forward rule of its configuration design, designs its assembling body and all the part
本論文對軌道式無摩擦球閥機構設計及計算機輔助設計系統進行了研究,取得了以下幾方面的成果:提出了軌道式無摩擦球閥的運動和動力分析方法,完成了球閥啟閉運動軌跡、球體運動空間以及主要零部件的受力等分析,進一步提出了球閥結構設計的準則,完成了球閥裝配件及所有零部件圖的設計。Due to logistics activities impenetrate to all process of the corporation, including raw material logistics, produce logistics, and the logistics of factory to delivery center, and to custom, all expenses number logistics cost that include packing, loading and unloading, stocking, circulating etc. but the logistics cost that is calculated throng corporation finance data only can reflect the part of logistics cost
由於物流活動貫穿于企業活動的全過程,包括原材料物流、生產物流、從工廠到配送中心再到用戶的物流,包裝、裝卸搬運、儲存、流通加工等各個活動中的費用都計作物流成本。但是,企業財務數據計算的物流費用只能反映物流成本的部分,有相當數量的物流費用是不可見的。When a firm decides to install a computer, the cost of the hardware may only be half the total cost.
當一個工廠決定裝配一臺計算機時,硬體成本只佔總成本的一半。Comparing to gearless traction machines, kaide series enjoy 40 % less starting current, 12 % more efficiency and physical size installation, which offer lower cost of the overall elevator configurations, such as reduced number of pilot wheels and steel ropes, and associated installation cost and trouble
相較無齒輪曳引機,啟動電流降低40 % ,效率提高12 % ,又可1 : 1安裝,降低了整梯的配置成本(減少導向輪、鋼絲繩的數量) ,節省了安裝費用及相應麻煩。The present work is to develop a new high performance single component waterproofing construction putty powder with cement fly asb quartz powder cmc and pp fiber as its main constitutes. its result can be a basis to popularize cement putty and a reference to establish national criterion. firstly, the influence of some major materials on the basic performances of putty was studied, and find the major constitutes and mix proportion, simultaneity, the principle to select element is cheap unpolluted and comprehensive
為了提高建築工程的裝修質量以及適應我國當前建築事業的發展要求,本文選用水泥、粉煤灰、石英粉等常用建材並摻入適量纖維素、聚丙烯纖維及助劑配製出一種高性能單組分且具防水性的新型水泥基膩子,成本低廉且符合環保要求,其成果可作為推廣水泥基膩子產品應用的依據,並對國家外墻膩子行業標準的制定提供參考。Secondly, paper introduces the composition structure and the manufacture craft characteristic of airplanes, describes the structure and the main assembly process and the assembly characteristic of the n # fuel tank section, points out the assembly accuracy control of the n # fuel tank section. thirdly, paper analyses in detail problems which exist in the current riveted assembly of the n # fuel tank section, proposes the improve measures against the existent problems. finally, paper forecasts in theory the positive effect that the new plan will bring, introduces the practical result after approval test, analyses the differences of both
具體做了以下幾方面工作:第一,詳細闡述了工作研究的基本原理;第二,介紹了飛機的組成結構、飛機製造工藝的特點、 n #油箱段的主要結構、 n #油箱段的主要裝配過程、 n #油箱段的裝配作業特點和n #油箱段的裝配準確度的控制方法;第三,具體分析了n #油箱段鉚接裝配生產線現行作業中存在的問題,針對存在的問題,提出了具體的改進建議,並形成了新的改進方案;第四,從理論上預測了新方案將會帶來的積極效果,介紹了新方案在現場試驗驗證的實際結果,並對兩者之間存在的差異進行了對比分析與研究。This paper finishes modeling and simulation of assembly robot
本文完成了對裝配機器人的建模和模擬。As one of blue sword group ’ s staffs, who has been adolescent together with blue sword group ( hereinafter as bsg ), i have experienced its 20 - years growth history, and seen with my own eyes the way its assets have been enlarged to over 4 billion starting with only 4 million, the way its industries have been expanded to beverages & foodstuffs, packing, pharmaceutics, chemicals and finance starting from beer brewery, the way the number of its independent incorporated companies have been increased to 36 starting from one, the way it has transferred its managements activities in products and brand to management activities in asset and capital
作為與藍劍集團一塊成長起來的藍劍人,本人親歷了藍劍二十年的發展歷程,並目睹了在二十年間藍劍是如何從400多萬元資產發展為40多億資產,躋身於全國啤酒三甲;從單一的啤酒經營擴展到啤酒、飲料食品、包裝配套、醫藥、化工、綜合投資多元化的產業結構;從1個獨立法人企業增至36個獨立法人企業;從產品經營、品牌經營,過渡到了資產和資本經營。Established in 2001, sonic clean is a regional leader in providing contract precision cleaning and sub - assembly services in clean room environment
音速公司成立於2001年,是本地一家在提供高清潔度清洗加工服務和產品裝配方面的先鋒企業。The factory is established in 1996, who professionally produce dynamic microphone cartridge products ; after years of efforts, we presently possess more than 100 senior management personnel and well - trained opierators, we alxo keep on enlarging our production scale and introducing advanced productive, technical and mechanical equipments, which help to form the production flows that gather molding, punching, hardware and assembly, etc as a whole
本廠建於一九九六年,主要生產專業化的麥克風音頭(咪芯)產品;經過幾年的堅苦創業,目前發展到高級管理技術人員及訓練有素的作業員工100多人,並不斷擴大生產規模,引進先進的生產技術和機械設備,形成了從注塑、沖壓、五金、裝配等一條龍生產。The second chapter studies the economy of ship ' s power plants, based on the aspects of lowering fuel cost, waste heat recovery, the match of ship, machinery and propeller, increasing propulsion efficiency, increasing the economy of ship ' s power plants, etc. the third chapter discusses in detail the control measures of voyage change cost, analysizes systematically the voyage change cost based on the way of fuel cost, harbor cost, voyage venture cost. the fourth chapter studies the structures and control measures of seafarers cost, maintenance cost, spare parts and stores cost, lubricating oil cost, etc. which are relatively easy to be controlled ; based on the state maintenance decision - making, a mathematical model is put forward, the validity and its solve process are discussed. the control measures of spare parts, fuel cost and lubricating oil cost should be based on scientific budget, through the control means of application, reception, usage, store check, try to acquire the inosculation of theory
第一章主要討論營運船舶運輸成本,對船舶運輸成本的概念、結構、性質與分攤、成本細分進行了分析,從宏觀上闡明了船舶運輸成本的生存環境和生長趨勢;第二章研究了船舶動力裝置的經濟性,在營運船舶降低油耗、廢熱利用、船機槳匹配、提高推進效率、提高船舶動力裝置經濟性的有效途徑等方面進行了闡述和論證;第三章詳細論述並論證了航次變動成本的控制措施,全面系統地分析和總結了航次變動成本,通過對燃油成本、港口使費、航次風險成本的分析與控制,提出了航次風險成本的概念並論述了若干航次風險成本的控制措施;第四章對船舶營運成本中的船員費用控制、維修保養及其費用控制、船舶備件物料管理及其費用控制等幾個主要可控性較高的成本進行了細致的分析並分別討論了相互的控制措施,提出了基於狀態維修決策的馬爾可夫數學模型並論證了模型的正確性及具體解算步驟,對于備件、燃潤物料的控制堅持以科學的預算為前提,以申領、接收、使用、盤存為控制環節,切實做到理論與實踐的密切結合;第五章,結合營運成本的預核算的案例,對船舶營運成本的預算及核算進行了有益的探討,旨在揭示成本發生的動因,並給出了成本預算、核算的編制方法。Meanwhile, in order to tackle such problems, administrators of ports are gradually aware of the importance of reasonable configuration of handling equipments after the confirmation of handling technology
同時,碼頭的管理者也逐漸認識到在裝卸工藝基本確定之後,裝卸機械的合理配置對提高裝卸效率、降低裝卸成本的重要性。Drilling, thread forming, bolting together - in one single operation - to save time and reduce the assembly costs
鉆孔,攻絲,緊固- -一次完成!節約您的時間和裝配成本The selection of proper basic part may have great impact on the choosing of assembly fixtures and to
基礎零件選擇的恰當與否直接影響到裝配夾具、裝配設備的選擇,對裝配成本的影響很大。The second sample is calculation of assemble cost of the cross grinding parts in the fertilizer grinding machine
第二個實例是造粒機十字磨頭裝配成本的浙江工業大學顱卜學位論義摘要計算。With the development of modern manufacturing, product designers should fully take product assembly feasibility into account. in this dissertation a method of working out the sweeping of the assembly part, dynamic interference exanimating and analyzing product assembly feasibility is proposed
現代製造業的發展要求在產品設計階段就充分考慮產品的可裝配性,以改善產品的裝配性能,從而降低裝配成本,提高產品設計質量與效率。Taking full consideration of the factors effecting on product assembly design and satisfying the performance of product, dfa in concurrent engineering applies many techniques like analysis, evaluation, planning and simulation in the product development process to improve the quality of product assembly design and reduce the cost in the assembly process and the total cost of product. the dissertation is divided into six chapters and the detail contents are summarized as follows : chapter one is introduction
隨著并行工程研究的逐步深入, dfa技術也在不斷的發展之中,它通過在產品設計過程中利用各種技術手段,如分析、評價、規劃、模擬等,充分考慮產品的裝配環節及其相關的各種因素的影響,在滿足產品性能與功能的條件下改進產品裝配結構,使設計出來的產品是可以裝配的,並盡可能降低裝配成本和產品總成本。The effect of assembly tolerance on product assembly is researched in detail and the algorithm and program of total assembly cost is presented. chapter five researches on the application of dfa method
最後對裝配公差對產品可裝配性的影響作了詳細的闡述,並給出了產品的總裝配成本計算的方法。Sometimes resource assignment costs include a per - use cost for items such as equipment costs, setup charges, delivery, or rental fees, in addition to a standard rate
除標準費率外,有時資源分配成本包括某些項(譬如除標準費率外,還有設備成本、安裝費、運輸費或租用費)的每次使用成本。分享友人