襯底施 的英文怎麼說

中文拼音 [chèndeshī]
襯底施 英文
undercoat
  • : Ⅰ動詞1 (在裏面托上一層) line; place sth underneath 2 (陪襯; 襯托) set off Ⅱ名詞(襯在裏面的附...
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  1. Through researching the con - structon methold of explording stove lump, disposing blasting residual things, residual waste iron of furnace bottom and furnace waist brick, we have developed the disposion stove liners construction craft in the middle and later term of construction blast furnace in pangang group

    通過對炸爐瘤、處理爆破殘留物、爐殘渣鐵和爐缸磚的工處理方法的研發,形成了攀鋼高爐中後期爐處理工工藝。
  2. By increasing the h2 dilution ratio, it is found that atomic hydrogen can selectively etch amorphous phase and stabilize crystalline phase. from the study on the distance from substrate to catalyzer, choosing a proper distance can ensure the gas fully decomposed, while a relatively low substrate temperature can cause the nanocrystalline particles to lose mobility and keep their sizes. the pre - carbonization process can enhance the nucleation density and make the growth of high quality nanocrystalline p - sic films much easier

    實驗結果表明:隨著工作氣壓的減小,薄膜的晶粒尺寸有所減小;通過提高氫氣稀釋度,利用原子氫在成膜過程中起的刻蝕作用,可以穩定結晶相併去除雜相;選擇適當的熱絲距離能保證反應氣體充分分解,又使具有較高的過冷度,是形成納米薄膜的重要條件;採用分步碳化法可以提高形核密度,有利於獲得高質量的納米- sic薄膜;襯底施加負偏壓可以明顯提高表面的基團的活性,因負偏壓產生的離子轟擊還能造成高的表面缺陷密度,形成更多的形核位置。
  3. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與工技術;大江截流上下游土石圍堰平拋墊研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  4. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與工技術;大江截流上下游土石圍堰平拋墊研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  5. Combined with the full scale models tested in - situ of prestressed concrete penstock with double circle unbonded strands and single circle bonded strands of xiaolangdi multipurpose dam project of yellow river, the advantages and disadvantages of two different prestressed systems are analyzed, the concrete stress distributions of the prestressed concrete penstock are induced and summarized during the whole tensioning strands stage. the consistence among the test results, the theory calculating and the three dimensional finite element analysis is proved. therefore, the theoretical method of prestressed concrete penstock is feasible

    結合黃河小浪水利樞紐工程在工現場進行的採用雙層雙圈環形無粘結預應力鋼絞線和單圈有粘結預應力鋼絞線對排沙洞砌混凝土加預應力的1 : 1模型試驗,對比分析了兩種后張預應力工體系的優劣,歸納總結了預應力筋束張拉過程中預應力混凝土壓力管道結構管壁混凝土的內力分佈規律,驗證了模型試驗實測數據、理論計算和三維有限元分析結果的一致性,確定了預應力混凝土壓力管道理論計算方法的可行性。
  6. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞砌工程,在國內尚屬首例
  7. ( 4 ) the study of the optical band gap of cnx film by uv - vis spectrophotometer. ( 5 ) by using the microhardness tester, we study the hardness of cnx film on the ceremic substrate by dc magnetron reactive sputtering with the feed ar and n2 flow rate, film thickness, substrate temperature and substrate bias

    ( 5 )用直流磁控反應濺射法,以陶瓷作為,對在ar和n2不同流量、不同膜厚、不同基片溫度和對基片加不同偏壓下沉積的薄膜,用< wp = 4 >顯微硬度計研究測試了不同工藝參數下的相應硬度。
  8. Standard practice for installation of thick poured gypsum concrete underlayments and preparation of the surface to receive resilient flooring

    濃漿石膏混凝土的安裝以及承受彈性樓面的表面的制備的標準實規程
  9. Through these studies and analysis, following conclusions could be drawn : ( 1 ) it is necessary to study on harness engineering of landslide and dangerous rock since the main representations of this geological hazard are landslide and dangerous rock through geological investigation ; ( 2 ) it can be concluded though stability analysis that the dingzhuang landslide is stable naturally, which is identical to the in - situ investigation ; ( 3 ) through stability analysis, the landslide would slide if the water level dropped down from 175. 10m to 156. 0m and it rained successively after the three gorges reservoir work. ( 4 ) according to the results of calculation and the characteristic of the landslide, it is suggested that such measures as unloading at upper part, anchorage and pile supporting system and drainage system should be used on the landslide. ( 5 ) according to geological investigation, there are three kinds of dangerous rock in the engineering, those are failing - down rock, collapsing rock and sliding rock

    因此有必要對滑坡進行治理; ( 4 )根據滑坡推力計算結果和本滑坡屬牽引式滑坡的特點,滑坡體上部相對較穩定,中下部處于基本穩定或不穩定狀態,因此建議此滑坡治理採用上部削坡減載與錨拉抗滑樁、擋墻進行支擋結合的處理方法,同時結合截排水等措進行綜合治理; ( 5 )根據地勘資料,通過對危巖體的形態、規模、基座和界層及分佈特點和分析,將本工程危巖體失穩崩塌的方式歸納為墜落式、傾倒式和滑塌式三種類型並分別提出相應的穩定性計算方法; ( 6 )分別對本工程中的危巖體進行了穩定性計算,並且發現其都處于不穩定狀態,因此根據實際情況分別提出相應砌支撐和清理等加固治理措,最後還對加固后的危巖體進行了校核計算,滿足要求。
  10. Standard practice for porosity in gold and palladium alloy coatings on metal substrates by vapors of sodium hypochlorite solution

    用次氯酸鈉液的蒸氣測定金屬上金和鈀合金覆層孔隙度的標準實規范
  11. Substrate slices of uniform electrical properties are necessary for integrated circuit device fabrication. at present there are variations in electrical properties across substrate slices. these are associate with deep levels, in particular el2, which is generally attributed to antisite defect complexes and considered to be related to grown - in dislocations formed by thermal stresses

    研究證明, si - gaas電學特性的不均勻與材料中深能級微缺陷,特別是el _ 2 (深能級主,被認為是as的反位缺陷的復合體)有極大的關系,而這些深能級微缺陷又與熱應力形成的長入位錯有密切聯系。
  12. And then the method to reduce the optics loss was discussed too in this paper. the research indicated that the crystallized phase and degree of orientation were dependent on annealing temperature

    研究了各生長條件如退火溫度、前驅溶液、類型、緩沖層( ksbn 、 mgo )等參數對sbn薄膜性能的影響以及降低光學損耗的措等。
  13. This paper deals with the design and construction of the key sectional works, the round diaphragm wall and its inner lagging and bottom sealing, of the south anchorage foundation of yangluo changjiang river highway bridge

    摘要介紹陽邏長江公路大橋南錨碇基礎關鍵分項工程圓形地下連續墻、內支護和封的設計工情況。
分享友人