襯河 的英文怎麼說
中文拼音 [chènhé]
襯河
英文
yang he-
Under the ceaseless conflagration of lightning that flamed in the skies, everything below stood out in clean - cut and shadowless distinctness : the bending trees, the billowy river, white with foam, the driving spray of spume - flakes, the dim outlines of the high bluffs on the other side, glimpsed through the drifting cloud - rack and the slanting veil of rain
這時候,天空中風雨閃雷交加,狂暴至極。閃電把天空也照亮了,把天宇下的萬物映襯得分外鮮明被風吹彎的樹木白浪翻騰的大河大片隨風飛舞的泡沫以及河對岸高聳的懸崖峭壁的模糊輪廓,都在那飛渡的亂雲和斜飄的雨幕中乍隱乍現。The trees in the embankment garden stood bulky against the incandescent sky-line.
河堤花園里的樹木背襯著燈光燃熾的夜空巍巍屹立。The trees in the embankment garden stood bulky, leaves filling out although it was only march, against the incandescent sky-line.
河堤花園里的樹木背襯著燈光燃熾的夜空巍巍屹立,雖然還只是三月時分,葉子卻已經日見豐滿。Bushes across the river stood round and bright-coloured out of a milky haze.
對河的叢樹聳立在四周圍,被乳白的朝霞襯得非常鮮明。It was a sunset that singularly fitted the scene, combining in audacious colour with the river's strength.
這一次日落把景物映襯得格外奇妙,它以狂放的格調與河流的氣勢溶為一體。All white save the river, that marked its course by a winding black line across the landscape ; and the leafless trees, that against the leaden sky now revealed more fully the wonderful beauty and intricacies of their branches
在?片白茫茫之中,只有河流在美麗的畫面上劃出一道曲曲彎彎的黑線,還有那葉兒落凈的樹木,映襯著鉛灰色的天空,此刻更顯得枝丫交錯,姿態萬千。You can visit the riverside parks at any time but they re particularly enjoyable and refreshing in the evening, or at night when there are fewer people around. the lights along the river sparkle and reflect in the water, making the scene even more enchanting
愛河適于任何時間游覽,公園夜晚人跡較為稀少,尤其安靜舒暢,河道燈景也將公園襯得異常華麗,河水倒映儷影雙雙,浪漫非常。We are the jiangsu province changshu benefit the he bo computer to embroider the lining cloth factory are the specialized production computer embroider the lining cloth ( paper ) and the product sale
詳細信息:我們是江蘇省常熟市利河伯電腦繡花襯布廠是專業生產電腦繡花襯布(紙)及產品銷售。The change regularities of lining pressure and the failure process of surrounding rocks in permeation which a special sand is used as model materials are successfully simulated. the basic theory is established for the study of same type and the scientific basis for the tunnel prop design in saturation rock is provided
採用特定的河砂作為模型材料成功地模擬了破碎圍巖隧道在遇水情況下襯砌的受力變化規律及巖體的破壞過程,為開展同類型研究奠定了基礎理論,為飽水巖體隧道開挖支護設計提供了依據。In the strange half - light, the tall pines of the river swamp, so warmly green in the sunshine, were black against the pastel sky, an impenetrable rom of black giants hiding the slow yellow water at their feet
在這奇異的朦朧中,河邊沼澤里的高大松樹,在陽光下呈那麼溫暖的綠色,此刻在柔和的天空的映襯下卻呈黑色,像一排無法穿越的黑巨人把慢慢流動的黃濁的水流掩藏在腳下。Combined with the full scale models tested in - situ of prestressed concrete penstock with double circle unbonded strands and single circle bonded strands of xiaolangdi multipurpose dam project of yellow river, the advantages and disadvantages of two different prestressed systems are analyzed, the concrete stress distributions of the prestressed concrete penstock are induced and summarized during the whole tensioning strands stage. the consistence among the test results, the theory calculating and the three dimensional finite element analysis is proved. therefore, the theoretical method of prestressed concrete penstock is feasible
結合黃河小浪底水利樞紐工程在施工現場進行的採用雙層雙圈環形無粘結預應力鋼絞線和單圈有粘結預應力鋼絞線對排沙洞襯砌混凝土施加預應力的1 : 1模型試驗,對比分析了兩種后張預應力施工體系的優劣,歸納總結了預應力筋束張拉過程中預應力混凝土壓力管道結構管壁混凝土的內力分佈規律,驗證了模型試驗實測數據、理論計算和三維有限元分析結果的一致性,確定了預應力混凝土壓力管道理論計算方法的可行性。Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china
簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例Acidproof alkali glove series of industry of production of our company, home glove series, industry bring cotton lining acidproof alkali glove series and various kinds of able to bear oil, able to bear and cut glove series odd heavy series of products, dozens of kinds of designs and varieties, with the product quality really up to the mark, price of the bottom the most, find a good sale domestic and international market, favor deeply by consumer, hebei work and protect articles quality control office annual check products, have won trustworthy products of the third consumer in hebei awards
本公司生產的工業耐酸堿手套系列、家用手套系列、工業帶棉襯里耐酸堿手套系列以及各種耐油、耐切割手套系列等幾大系列產品,幾十種花色品種,以過硬的產品質量,最底的價位,遠銷國內外市場,深受消費者青睞,是「河北省勞動防護用品質量監督局」年檢產品,曾榮獲「河北省第三屆消費者信得過產品」獎。On another morning, i came to the kun yu river again, and watching the central tv tower under the pure blue sky and the dancing slim branches of the willows, i thought that all these were so beautiful, so i took the photos
在另外一個早晨,我來到昆玉河邊,看著在藍藍的天空的陪襯下的電視塔和飄飛的柳枝,感到很美,就順便把那種感覺拍下來了He recovered the axe in the midst of the milky way of checks, starched shirts, and manuscripts, and prepared, when he came down, to kill joe
他在支票熨好的襯衫和稿件的銀河裡找到了斧頭,打算下去殺掉喬。可是他並沒有下去。分享友人