西貢公路 的英文怎麼說

中文拼音 [gònggōng]
西貢公路 英文
hiram's highway
  • 西 : west
  • : Ⅰ名詞1 (貢品) tribute 2 (姓氏) a surname Ⅱ動詞(封建時代向朝廷推薦人材) recommend a suitable...
  • : Ⅰ形容詞1 (屬于國家或集體的) state owned; collective; public 2 (共同的;大家承認的) common; gen...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 西貢 : off limits
  1. " general view of reconstructed hiram s highway

    重建后之西貢公路
  2. Hiram s highway improvement phase 3

    西貢公路改善工程第3期工程
  3. Hiram s highway improvement phase 2

    西貢公路改善工程第2期
  4. The section of hiram s highway between nam wai and ho chung was realigned and widened to a dual 2 - lane road in 2002

    介乎南圍與蠔涌之間的西貢公路已重新定線,並且擴闊為雙程雙線分隔道
  5. A climbing lane between nam wai and clear water bay road in the kowloon - bound direction was constructed in july 1992 and a substantial improvement to the junction of hiram s highway clear water bay road was completed in may 2000

    一條介乎南圍與清水灣道之間往九方向的上坡慢線已於一九九二年七月建成。二零零零年五月,西貢公路清水灣道交界的改善工程竣工。
  6. Whereas improvement to local corridor, e. g. hiram s highway will be investigated

    然而,顧問司會研究改善區內的交通走廊,例如西貢公路
  7. Construction of a footbridge across hiram s highway and chuk kok road

    興建一條橫跨西貢公路及竹角的行人天橋
  8. Hiram s highway improvement phase 3 : improvement between nam wai and ho chung upgrading local access roads

    西貢公路改善工程第3期工程南圍與蠔涌之間的道改善工程及區內通改善工程
  9. Improvement to castle peak road from siu lam to so kwun tan hy 2001 15

    西貢公路改善工程第3期工程hy 98 13
  10. Hiram s highway is the main road link to sai kung town from kowloon

    西貢公路是由九至西市鎮的主要連接
  11. Upgrading of the hiram s highway is already at various stages of planning and implementation

    西貢公路的改善計劃現已處于不同的規劃及實施階段。
  12. You can alight at hiram s highway near po lo che, then walk via hong kin road to the center

    您可以在西貢公路近菠蘿?的巴士站下車,之後沿康健步行前往。
  13. The rural townscape of the area along hiram s highway is worth preserving to maintain local characteristics

    西貢公路沿的鄉鎮風光值得保護,以保持地區特色。
  14. Construction of a flyover to carry the right - turn traffic from hiram s highway to the kowloon bound carriageway of clear water bay road

    興建一條行車天橋,讓右轉車輛由西貢公路駛上清水灣道往九方向行車道
  15. At about 10. 30 am, a police vehicle driven by the 36 - year - old police constable was travelling along kowloon - bound hiram s highway

    上午約十時三十分,一輛由三十六歲警員駕駛的警車沿西貢公路往九龍方向行駛。
  16. Hiram s highway improvement phase 2 flyover and junction improvement at junction with clear water bay road

    西貢公路改善工程第2期:與清水灣道交界處的天橋及口改善工程
  17. To improve the junction between hiram s highway and clear water bay road, the construction of phase ii of the hiram s highway improvement works started in january 1997 for completion in 2000

    為改善西貢公路及清水灣道的交界,西貢公路改善工程第二期的工程已於一九九七年一月展開,預計於二零零零年竣工。
  18. Widening of local access roads connecting hiram s highway with mok tse che and nam pin wai including the reconstruction of the existing carriageways of the above access roads

    擴闊連接西貢公路與莫遮?及南邊圍的區內通,包括重建這些通的現有行車道
  19. Permanent closure of the existing sai kung bound carriageway of hiram s highway fronting nam wai village ; and

    永久封閉南圍村對面現有西貢公路西方向的部分行車道以及
  20. Phase iii of the works in nam wai and ho chung is scheduled to start in early 1999 for completion in 2001. improvement works to castle peak road from siu lam to so kwun tan started in february 1997 for completion in late 1999

    第三期南圍與蠔涌之間的西貢公路改善工程,也將於一九九九年初動工,預計在二零零一年完成。
分享友人