覆砂層 的英文怎麼說

中文拼音 [shācéng]
覆砂層 英文
blanket sand
  • : 動詞1. [書面語] (蓋住) cover 2. [書面語] (底朝上翻過來; 歪倒) overturn; upset 3. 同 「復」 (Ⅱ1. 2. )
  • : 名詞(沙子) sand; grit
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  1. The complex of sand bodies developed in a cyclical sequence of off-lappings edimentary beds.

    巖復合體發育于退沉積的旋迴內。
  2. An area covered by sand and gravel deposited at the front of a glacial moraine

    冰川前冰河冰漬前沉積的沙及礫石蓋的區域
  3. Hada mountain embankment dam is located at strong motion earthquake area with 7 degree. it is a sand - fill dam with clay core, stability of the dam under earthquake and the preventive of foundation liquescence is very important for the dam design

    哈達山土壩是位於七度地震區,坐落在厚上的粘土心墻殼壩,壩體的抗震穩定、基礎的抗震液化是本工程的技術關鍵問題。
  4. With regard to its field drilling applications in the geologically loose sandy pebble layers, kl vegetable - gum drilling fluid showed itself with excellent rheological behaviours in its abilities of lubrication, lost circulation, suspension and removal of debris, anti - shear shinning, and high coring rates, which satisfactorily meet the demands of geological boring in the dam foundation of huangjin ping hydroelectrical power plant

    通過在黃金坪水電站壩基深厚卵石鉆探取芯的現場試驗,證明了kl植物膠沖洗液具有優良的流變特性,潤滑、堵漏、懸浮排除巖屑和抗剪切稀釋能力顯著,可實現高取芯率,能很好的滿足地質鉆探對取芯質量的要求。
  5. Gravelly - sand over an iron - pan and gravel layer

    沙礫于鐵質土之上。
  6. The region and the earth surface across this road are mainly water above ground and run - off and the ground water is mostly made up of groundwater and perched water ; the river bed is more obvious ; the overbank is covered by medium sand and gravel ect

    路線所經地帶地面主要為地表水和徑流,地下水主要以潛水和上滯水為主,河床較明顯,河灘蓋中、礫石等。地勢低洼地帶地表常年積水,影響路基穩定。
  7. Anomaly over in - situ leachable sandstone type uranium deposit appears rather weak due to the thick cover, therefore, prospecting in this area is extremely difficult

    摘要可地浸巖型鈾礦床由於其上較厚,地表異常信息十分微弱,找礦難度相當大。
  8. Preparation of steel substrates before application of paints and related products - specifications for metallic blast - cleaning abrasives - chilled - iron grit

    用塗材料及有關產品塗前鋼基體的準備工作.金屬噴情理磨料的規范.冷淬鐵
  9. It can measure shell speed and crusting of film laminating by adopting fks - 1 tester of film laminating capacity ; the principle of this instrument is that it makes film laminate on heating plate and turns 90or 180 of heating plate for moving un - shell sand. and then it measures shell thickness and observes cocking condition of surface sand

    採用fks - 1型結殼性能測試儀可以觀測的結殼速度和起皮狀況,其原理是將撒在加熱板上,經過某一時間之後,將加熱板旋轉90或180移去未結殼的鬆散,然後測量結殼厚度,並觀察表的翹起情況。
  10. The results denote that the sand layer can greatly enhance heat transfer in high temperature region because it changes film boiling to liquid film evaporation in the sand layer

    在高溫金屬面上后,可將高溫面上的膜沸騰轉化為粒表面的液膜蒸發,從而大幅度提高表面換熱系數,強化冷卻能力。
  11. Experimental study is performed on the mist cooling of heated high temperature surface covered by a sand layer to investigate the effects of both sand size and thickness of sand layer on heat transfer charateristics in order to enhance heat transfer of film boiling region

    摘要研究了高溫金屬面上后的噴霧冷卻換熱特性,測試了粒顆粒大小和厚度對換熱特性的影響。
  12. The sand faced - iron mould casting process is a special iron castings production process, according which castings are to he cast in the iron moulds having a thin layer of the resin sand facing in their inner surfaces

    摘要鐵型鑄造是指在金屬型(鐵型)內腔上一薄樹脂,然後採用這種鐵型澆注鑄件。
  13. In sichuan red basin, excavating cuttings in gently inclined red beds composed of sandstone and mudstone intercalations, mudstone would be indented inward by weathering, and result in a niche on the slope surface. slope, and the bearing force of the support structure must computed in design. in this paper, the overlying sandstone bed is regarded as cantiever beam, and a calculation method for the bearing force is developed, a calculation example is also given

    分析了四川盆地緩傾角紅地質結構特徵,將下泥巖風化形成凹巖腔后的巖視為懸臂巖梁,提出了一種計算泥巖風化凹進極限深度及在設計支撐柱時計算支護力的計算方法,並給出一個計算示例。
  14. This paper is based on the program of the innovations of novel vegetable - gum drilling fluids, one of the tenth five - year scientific programs by the state power corporation in 2003. aiming at finding out a novel vegetable - gum drilling fluid suitable for boring and coring in the geologically loose sandy pebble layers, this program can make up for the disadvantages of currently used drilling fluids, which are caused by the serious shortages of some natural shrubs, such as sm

    本文是以我校承擔的國家電力公司成都勘測設計研究院負責的國家電力公司「十?五」科技攻關研究項目子題「新型植物膠沖洗液開發研究」為依託,項目研究的主要任務就是研製一種適合復雜地鉆進,特別是提高深厚卵石的取芯的高性能的新型植物膠沖洗液,以解決當前野生植物膠沖洗液資源嚴重不足,而應用領域不斷擴大的矛盾。
  15. The geochemical examination of the sandstones and mudstones from the xikang group has led us to conclude that the debris are derived mostly from the surficial rocks and their overlying deposits on the xikang - yunnan ancient land, and tectonic settings display the transition from the passive continental margin to active continental margin and finally to archipelago

    通過對西康群、泥巖地球化學組成特徵研究,認為其物源來自康滇古陸表殼巖及其上的蓋沉積,大地構造屬性為被動大陸邊緣到活動大陸邊緣再到多島弧的轉化。
  16. Paints and varnishes - coating materials and coating systems for exterior masonry and concrete - determination of water - vapour transmission rate of free films dish method

    塗料和清漆.外部漿和混凝土材料和系統.無薄膜水蒸氣滲透率的測定
  17. The effects of some parameters such as mould temperature and its uniformity, the mould rotation rate on the surface roughness and uniformity of thinkness in the process of duplex, alterable - rotation coating are studied

    研究了用變轉速二次布工藝時,鑄型溫度及其均勻性和鑄型轉速等工藝參數對覆砂層厚度均勻性和表面粗糙度的影響規律。
  18. The foundation of gated - weir of the wanbahe power station is located on quaternary deposit which is soft

    摘要灣壩河水電站閘基坐落在第四紀礫石上,屬于軟基上建閘。
  19. Which avoid the damage to the seepage of interlayer and inner layer of foundation, which is surpass the suggested standard, therefore the meet the seepage stability of overburden foundation can meet the requirement

    使得基礎地內及其間部分超出地質建議指標的滲透坡降不致對造成破壞性的滲透破壞,地基的滲透穩定得以滿足要求。
  20. The basic uneven settlement problem were controlled well, also the anti - liquefied problem of sand layer nearly was solved in this plan. when increasing the basic gravity after the project completion, the proportional lowering of seepage damage of sand in overburden foundation are greatly improved

    基礎不均勻沉降問題也能得到較好控制,防液化問題也基本解決,在工程完建后增加基礎壓重的情況下,基礎中的滲透破壞坡降也大大提高。
分享友人