規劃評估法 的英文怎麼說

中文拼音 [guīhuàpíng]
規劃評估法 英文
pertcost
  • : Ⅰ名詞1 (畫圓形的工具) instrument for drawing circles 2 (規則; 成例) rule; regulation 3 [機械...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • : Ⅰ動詞1. (評論; 批評) comment; criticize; review 2. (評判) judge; appraise Ⅱ名詞(姓氏) a surname
  • : 估構詞成分。
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 規劃 : 1 (比較全面的長遠的發展計劃) planning; programming; project; schematization; programme; plan 2 ...
  • 評估 : estimate; assess; appraise
  1. Neuman, michael. " does planning need the plan ? " journal of the american planning association 64, 2 ( spring 1998 ) : 208 - 220

    著一般準則:訂定更好計的方美國協會期刊63 , 3期( 1997夏季) ,第329 - 344頁。
  2. We can clearly dialyze the historical process from a series of important bills : warnock report, the 1981 education act, the 1988 education reform act and " the code of practice ", and etc. so far, british government has fundamentally established a set of practical frameworks of inclusive education and made some specific projects

    從華諾克報告、 1981年教育、 1988年教育改革以及「特殊教育需要鑒定與實施章程」等一系列重要的律、案中可以清晰地透析英國發展全納教育的歷史進程。到目前為止,英國已經基本確立了一套全納教育的實施框架並做了許多具體
  3. Article 39 reclaiming unused land shall go through scientific argumentation and evaluation and can proceed according to law after approval within the reclaimable areas demarcated in the general plans for the utilization of land

    第三十九條開墾未利用的土地,必須經過科學論證和,在土地利用總體定的可開墾的區域內,經依批準后進行。
  4. The content of the study as follow : 1 to choice the ship form, mainly ship ' s overall size ; draft, according to design of shanghai deep - water port and development of container ; 2. to deside the date of width ; depth ; path ; tract and sinkage through simulator tests ; 3. to replenish and modify some date for channel design to very large container vessels in " design code of general layout for sea port " 4. to study ship ' s turning area ; ship ' s stop distance the new and special content of the study as follow : 1. statistics of path at the channel given by difference operators with the affections certain wind. currents. seas and other influences shows the path really needed under certain condition

    並可在各類航道和水域的通航安全及操船方,航跡帶寬度,航道寬度,航跡帶分佈,船舶各種航行狀態時的下沉量研究中應用。本課題研究的內容: ( 1 )根據洋山深水港設計和集裝箱船舶的發展趨勢,通過研究、分析、比較,選擇最合適的船型,尤其是船舶主尺度和船舶吃水。 ( 2 )在大量模擬研究情況下,得出進港航道所需的航道寬度和深度。
  5. In the brief introduction to geographical information system ( gis ), this dissertation proves that by combining reliable management with gis technology, presents a method which built the power structure model and math calculation model by using spatial data in a good interface between computer and user. this dissertation makes a number of target for calculating the distribution system, mainly aimed at circumstances which have an effect on power station repair, switch breaker, type of t connection, and double lines supply via the usage of system reliability calculation. at the same time, it provides the projected estimatio n when power station or transmission line will be added into the power system, and furnishes the theoretical information that the professional needs for power structure programming, design and equipment management

    通過建立輸變電設施管理信息系統( mis ) ,真實地反映出油田電網輸變電設施的運行管理現狀,為網路可靠性計算提供可靠的計算依據;在簡述地理信息系統( gis )技術的基礎上,論證了可靠性管理與電力gis技術結合的可能性,創立了在簡潔的人機圖形界面下利用空間數據建立網路結構模型及可靠性計算模型的方;通過建立網路可靠性計算系統,進行了計及變電所檢修影響、切換開關、 t接點及雙回線供電情況下的可靠性指標計算分析,對油田電網及變電所(線路)的改(擴)建方案、增強性措施及接入系統的可靠性給予了工程,為電網、設計及日常的設備管理提供分析決策依據。
  6. In this paper, it provides seven ways for construction enterprises when they carry out project management to distinguish risk. then use expert survey or administrative levels analysis to analyses risk and give out the different dealing way to different risk. at the last, they choose a suitable way to deal with the risk

    風險的識別是進行風險管理的基礎,本文提供了七種方對建築企業進行工程項目運作時可能遇到的風險進行識別;然後對識別出的風險編制風險調查表,用專家打分或層次分析進行風險的和分析;針對出的結果對項目進行風險,提出不同的風險應該採取的風險處置方及可以採取的措施;之後根據不同的情況,從六種風險處置方式中選擇適合的方式進行風險處理。
  7. A model based on genetic programming for credit risk assesment in commercial banks

    基於遺傳的商業銀行信用風險模型
  8. Traditional urban green landscape indexes, such as greenland rate, green rate, etc., which only focus on the scale and area of the greenland, ignoring the importance of the shape, distribution, type and structure, can give neither a real picture, nor a scientific evaluation of the ecology effects of the urban greenland

    傳統的城市綠地指標如綠地率,綠化覆蓋率等指標只注重綠地的模和面積特徵,忽視了綠地形態、分佈、類型、結構等特徵的重要性,不能反映城市綠化的真實情況,無對綠地的生態效應進行正確的,以此來指導城市綠地的和建設也不盡科學。
  9. Under the current policies and regulations as well as the market situation, it is suggested to improve their management skill in the following aspects : to increase the investment proportion of the available assets to seek higher investment return ; to optimize the capital structure by emphasizing the balanced management of liabilities and assets ; to strengthen risk control and invest ment appraisal to ensure sustained and steady return

    面臨業務拓展型向經營管理型轉型期的中國保險企業,在現行政策與市場環境下,可著眼于提高可投資資產比例;資產結構,實行資產負債管理;加強風險控制與績效,保證持續回報。
  10. As a follow - up to the training session in canada, the training program in pengzhou summarized the experiences and lessons in the four piloting sites that have opened farmers field schools. in addition, the program has analyzed the problems and challenges faced by the current training and provided guidance for the improvement of the weak links in the training process. the training courses were focused on the participatory training approaches and informal education methods for adults learning, which included

    培訓內容重點是參與式培訓與成人非正教育方,主要包括參與式需求參與式測技能bbt票箱測試農民田間學校的模式怎樣開展農民田間學校輔導員的作用角色扮演怎樣做好輔導員怎樣與不同類型的培訓對象交流怎樣提問團隊的功能和農民培訓中的團隊活動農民田間學校課程設計編寫培訓計以及怎樣在參與式培訓中運用游戲來提高培訓對象的興趣等內容。
  11. It is an important work for the manage men of planning power grid to evaluate and control of power grid construction and size of grid electricity scientifically, and it is also the inevitable demand in market conditions. “ researching of assessing system methods and evaluation indicators in regional power grid construction ” is from the topic of assessing the scale level of regional power by hunan electrical power company

    科學地價、把握和控制地區電網建設模是電網管理部門的重要工作,也是電力市場條件下地區電網建設的必然要求。 「地區電網建設模水平價指標體系及研究」是湖南省電力公司在地區電網建設模水平方面的一項課題。其目的是科學合理地認識改造后的地區電網的建設模水平。
  12. Afterwards, combining mathematical model with simulation model, the moving air traffic flow in airport was further analyzed ; the algorithms of random flight generation, departure waiting list and taxiing flow optimization was proposed to construct the airport practical evaluation model

    然後,結合數學模型和模擬模型,進一步分析了機場空側系統空中交通流的運動情況,提出了隨機飛機流增減演算、跑道頭離場等待隊列和滑行飛機流優化演算,構建以實際飛行計為依據的機場實際容量模型。
  13. Program evaluation and review thechnique

    程序檢查波特
  14. China marine oil spill contingency plan is now in the process of improvement. the inland waterway oil spill is another important area remain to be explored in term of increasing accident rate and booming shipping amount in yang tzi river. the need for inland waterway oil spill contingency plan is imperative. at strategic level, this paper compares several existing oil spill risk analysis methods including " historical date analysis " and " comparative risk indexes ", pointing out limitation of them, and then apply the " comparative risk indexes " approach to " river segment " spill risk analysis, developing " river segment oil spill comparative risk assessment framework " this paper also take new approach to collision and grounding in river by stochastic modeling tanker traffic in narrow waterway

    本文在內河溢油反應戰略層次上,分析現有的溢油風險,包括歷史數據統計和比較風險,指出相關方的適用性和局限性;基於長江下游水道採用「區段」和「河段」雙層的思路,提出「長江下遊河段比較溢油風險模式」 ;將馬爾科夫狀態轉移的思想應用到船舶運動描述中,從隨機過程角度分析船舶在水道中的運行和事故發生,得出船舶事故概率計算模型。
  15. Being basis on the 14 regional grid planning texts of historical data of hunan province, initially determining the factors that affecting power grid construction ; to reflect the distribution of information to determine the scale of construction leading indicators to assess the scale, with its own network of intelligence presented to the region to assess the scale of the distribution network - building indicators system ; establishes assessment models of evaluating 110kv distribution network building scale integrated ; considering the main factor that influencing the construction scale of the distribution network, the improvement method of 10kv distribution networks capacity - load ratio is proposed ; the combination of high voltage distribution network planning optimization technology results presented evaluation pressure distribution network building scale integrated assessment methods

    課題以湖南省14地區電網已有文本歷史數據為基礎,初步確定各種影響電網建設的因素;以反映配電網建設模的主導信息來確定指標,提出了符合自己網情的地區配電網建設模的指標體系;建立了價110kv配電網建設模的綜合模型;通過研究各影響因素與負荷發展儲備系數參數的關系提出了確定10kv變電容載比的方;結合高壓配電網的優化技術成果,提出了價中壓配電網建設模的綜合
  16. Pert, early start dates

    盡早開始規劃評估法
  17. Enterprise credit risk evaluation model based on ga - pso optimize algorithm

    混合演算的企業信用風險模型
  18. The paper is meant to set up a enterprise credit risk evaluation model by a new ai method - ga - pso optimize algorithm

    摘要利用一種新的人工智慧方ga - pso混合演算構建企業信用風險模型。
  19. Pert, latest atart dates

    盡遲開始規劃評估法
  20. Perrt, start dates

    開始日期規劃評估法
分享友人