規定負荷 的英文怎麼說
中文拼音 [guīdìngfùhé]
規定負荷
英文
given load- 規 : Ⅰ名詞1 (畫圓形的工具) instrument for drawing circles 2 (規則; 成例) rule; regulation 3 [機械...
- 定 : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
- 負 : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
- 荷 : 荷名詞(蓮) lotus
- 規定 : stipulateprovide
- 負荷 : [電學] load; charge; weight
-
The test shall demonstrate to the satisfaction of the owner that the equipment meets all specified performance criteria, is properly installed and anchored, and operates smoothly throughout the specified speed range without exceeding the full load amperage rating of the motor or excessive motor heating
測試應該讓用戶滿意,證明這些設備符合所有規定的性能標準,經過正確的安裝和錨固,在額定轉速范圍內運行平穩,沒有超過電機的額定滿負荷運轉電流安培數,或發生電機過熱。The pilot fuel model has been given to calculate the distribution of the liquid fuel and time of fuel pre - combustion, at the same time, analyzing the important action to the combustion of the natural gas in the combustion chamber of engine, determining the best quantity of pilot fuel. the explosive combustion model has been established to compute the pressure of the cylinder during the combustion, determining the main influence factors. the emission model has been established to forecast the co, nox emission
理論方面,提出了基於化學反應的燃燒模型?多組分氣相反應系統的化學反應動力學模型,以此進行雙燃料發動機的熱力學?化學反應動力計算;引燃油燃燒模型,計算引燃油液滴的分佈規律和滯燃期,驗證引燃油在雙燃料發動機燃燒過程中的作用,揭示不同噴油規律對雙燃料發動機的影響,確定在不同負荷下的合理引燃油量;爆震模型,揭示爆震與工質能量釋放間的關系和影響爆震的各種運轉因素,確定合理的爆震依據,減小爆震傾向。The safety of transmission line plays a important role in power system safety it is not only the requirement of ensure supply power reliability, but also the necessary precondition of enhance power system stabilization, to remove faulty line quickly and accurately, also keep non - faulty line continuous work when some transmission line faults current differential protection is a kind of simple, reliable and good - selective protection manner to any variety of transmission lines, power system development needs current differential protection apply to transmission lines, moreover the advancement of electric and communication technology enable current differential protection apply to transmission lines firstly, the paper discusses, analyses the research and application transmission line protection in detail, compare the principle and realistic presupposition of general line pilot protections secondly, because conventional current vector differential protection are influenced easily by load current and transitional resistance, in order to at the same time quicken protection act, the principle and criterion include work characteristic of differential protect based on fault component sampled values are studied, results shows that differential protect based on fault component sampled values excels general vector current differential protection in reliability, sensitivity and anti - saturation of current transformer in addition, synchronous current sampling methods at all terminals of line is analyzed and estimated lastly, the principle and criterion. also device design about current sampling values differential protection based on optical fiber communication, which apply to short transmission lines are concretely investigated,
基於基爾霍夫定律的電流差動保護無論對於何種形式的輸電線路都是一種簡單、可靠、選擇性強的保護形式,電力系統的發展使得電流差動保護應用於線路保護成為需要,而電子、通信技術的發展使得電流差動保護應用於輸電線路成為可能。首先,本文對目前線路保護的研究和實際應用情況進行了討論和分析,比較了常用線路縱聯保護的實現原理和實現條件及優缺點。其次,針對常規相量電流差動保護易受正常負荷電流和故障過渡電阻影響的缺點,同時為加快差動保護的動作速度,對基於故障分量瞬時采樣值電流差動保護的原理、判據、動作特性等作了討論和分析,結果表明基於故障分量瞬時采樣值電流差動保護在可靠性、靈敏度、抗電流互感器飽和方面明顯優于常規相量電流差動保護,對電流差動保護各端的同步采樣方法和數據通信也進行了分析和評價。Clothing. accessories. determination of the elongation of plastic bands under specified load
服裝.附件.在規定負荷作用下速料帶伸長率的測定Building non - point source pollution spatial database of the three - gorge reservoir area can not only know about the background, status and rule of non - point source pollution and assessing non - point source critical area and calculating pollution load but also provide the scientific dependent for bringing forward quantity control goal and establishing control stratagem of non - point source pollution of the three - gorge reservoir area
建立三峽庫區農業面源污染空間數據庫不僅可以查清三峽庫區農業面源污染的背景狀況、現狀、規律和三峽水庫水體污染現狀及其容量,進行危險性評價,確定三峽庫區水體的污染負荷,而且可以為提出三峽庫區面源污染物總量控制目標並制定三峽庫區農業面污染控制戰略提供科學依據。Standard practices for force verification of testing machines
試驗機的負荷檢定的標準實施規范Verification regulation of dead - load hardness testing machine in international rubber hardness degree
定負荷橡膠國際硬度計檢定規程The method ' s aim is made the investment of substations and feeder minimum. it can model physical constraints with land utilization and street accessibility and used actual street routes in the substation location and feeder planning, which is important especially in a suburban or city area
模型包含了用地限制和街道可達性、可用性等約束,而且在求解模型時用基於動態規劃的最短路演算法確定負荷點到變電所的計及障礙因素的歐幾里得距離(簡稱廣義距離) 。As the agricultural nfs is the most important factor for water environmental deterioration and lake eutrophication in china, more and more scientists and technologists focus on the control countermeasurc and pollution mechanism of agricultural non - point source ( nfs ). based on the investigation of natural resource and agricultural distribution, the loss rule of nitrogen and phosphorus in the typical land of qiandao lake watershed and distribution rule of the phytoplankton and physico - chemical characteristic in the lake were studied, and the input loading of nitrogen and phosphorus was also calculated by the annagnps model in this thesis. according to the routine monitoring data of the water environment in qiandao lake from 1989 to 2001, the concentrations of toxic substance and heavy metal were under the monitoring limit, but the total nitrogen ( tn ) and total phosphorus ( tp ) were much higher than the criterion for lake and reservoir
本文調查了千島湖流域的自然資源和農業生產情況,研究了典型坡地降雨徑流中的氮、磷污染物的輸出規律,利用annagnps模型估算流域農業非點源污染物輸入負荷,並在千島湖內設點采樣,對水質理化指標和浮游植物群落進行系統的研究,得出以下結論: 1989 2001年間的水環境常規監測資料統計分析表明,有毒物質和重金屬濃度長期在監測下限內, no _ 2 - n 、 no _ 3 - n 、 nh _ 3 - n年平均濃度均符合類標準,但湖泊水庫特定項目tn和tp濃度分別為超類和類,呈嚴重超標狀況,湖區主要污染因子是將導致富營養化的物質tn和tp 。The timing - and - quantitation precision injection of lpg was realized with high - speed lpg solenoid valve and a set of electronic control system, which was designed by the author and can flexibly control the gas supply system of lpg. based on the analysis of experimental data got by comparing the performances before and after the application of the set of equipment on lr6105q12 diesel engine, the effects of load, speed and replace ratio, etc on the emissions of smoke, hc and co of dual fuel engine were expounded. through optimization, the smoke emission was utmostly reduced and the emissions of hc and co were within the government restriction
為此,本文通過對各個方案進行詳細比較,選擇了電控多點順序噴射的供氣方案;利用高速lpg噴射閥和自己獨立開發出一套電子控制系統對lpg供氣進行靈活地控制,實現了lpg的定時定量噴射,並把這套裝置應用到中國一拖生產的lr6105q12柴油機上,在對改裝前後的發動機進行大量試驗和分析的基礎上,闡明了負荷、轉速、摻燒比等因素對雙燃料發動機的煙度、 hc 、 co等排放的影響情況,並且通過優化,最大限度地降低了發動機的煙度排放,同時使hc 、 co排放限制在國家標準規定的范圍之內。Industrial projects refers to the major projects and accessory facilities completed which result in forming production capacity and have been checked and accepted while the living and welfare facilities have been completed and can ensure normal production and formally put into production
工業項目是指設計文件規定形成生產能力的主體工程及其相應配套的輔助設施全部建成,經負荷試運轉,證明具備生產設計規定合格產品的條件,並經過驗收鑒定合格或達到竣工驗收標準,與生產性工程配套的生活福利設施可以滿足近期正常生產的需要,正式移交生產的建設項目。To minimize the impact of the overhaul of power generating, transmission equipments on the safety, stability and economic operation of power gird, this paper, aiming at the overhaul demand of lots of equipments, brings forward the practical optimization method for overhaul planning which can adapt to the dynamic changes of the scale of power grid and integrate the load forecast and the balance of power load and power volume into it, therefore solve the key technical problems encountered by using computer to realize the optimization of overhaul planning
為最大程度減少電網發、輸電設備檢修對電網安全、穩定、經濟運行的影響,針對電網大量設備的檢修需求,提出了能適應電網規模動態變化,並與電網負荷預測、電力電量平衡有機結合的實用檢修計劃優化方法,解決了利用計算機實現檢修計劃優化的關鍵技術問題。After determining the max furnace temperature, calculate the power ( kw ) of a single element using the way of multiplying the stipulated surface load of the elements under said furnace temperature ( find it out from the above table ) by the surface area of hot zone of the elements. ( find it out from the product dimension
確定最高爐溫后,根據元件在此爐溫下所規定的表面負荷,乘以所選元件發熱部的表面積(從產品規格表中查出) ,求出單支元件的功率( kw ) 。Thermal insulating products for building applications - determination of deformation under specified compressive load and temperature conditions ; german version en 1605 : 1996
建築物絕熱產品.規定壓力和溫度負荷條件下變形測定The basic agc roles include : ( 1 ) making generation follow the load change, and holding system frequency on fix value ; ( 2 ) dispatching power to each area, and holding exchanging power on fix value between each area
其主要功能是響應負荷和發電的隨機變化,維持電力系統頻率為規定值,響應各區域分配系統發電功率,維持區域間凈交換功率為計劃值。Safety of earth - moving machinery - specification for rated operating load for crawler and wheel loaders
運土機械的安全性.第2部分:履帶式和輪式裝載機額定操作負荷規范A common recognized method for the shaft alignment, is to set up a physical model, and appropriately locate each bearing in compliance with the required bearing load, stress and shear force and slop etc, so as to fix the shaft with the curve line as required and obtain a right distribution of bearing load
對于軸系校中計算,國內外比較通用的方法是對軸系相關的要素進行處理,建立物理模型,按照規定的軸承負荷、應力,轉角等限制條件,確定各軸承的合理位置,將軸系安裝成規定的曲線狀態,以達到使各個軸承上的負荷合理分配。The paper , via building performance model of boiler - turbine unit , to online determinate curve of consumption in power plant which provides reliable thereunder for realizing load optimal distribution , in view of optimal distribution arithmetic , the improved equal incremental principle and linear programming are adopted , meanwhile , the database with online data disposal and data management is realized
通過建立各單元機組的性能模型,在線確定機組的耗量特性曲線,為實現負荷最優分配提供了可靠的依據;在負荷分配演算法上採用了等微增率原理和動態規劃方法,並對現有演算法進行了改進;同時開發了具有在線數據處理能力和歷史數據管理能力的數據庫。Loading for buildings - code of practice for dead and imposed loads
建築物負載設計.固定負載和施加載荷實用規程Not only the load magnitudes forecasting including electricity consumption and the peak load of the district, but also special load forecasting ( slf ) should be done for the load forecasting of the distribution network planning, so that the standard of the new equipment and the time and location of installation could be decided, and the reasonable planning could be made
配電網規劃的負荷預測不僅要進行地區年用電量和年峰值負荷的總量預測,還要確定負荷增長在地理上的分佈,即空間負荷預測。這樣才能夠確定未來新增設備的規格、時間和地點等,才能對配電網做出合理的規劃。分享友人