觀測潮汐變化 的英文怎麼說
中文拼音 [guāncècháoxībiànhuà]
觀測潮汐變化
英文
observed tidal variation- 觀 : 觀名詞1. (道教的廟宇) taoist temple2. (姓氏) a surname
- 測 : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
- 潮 : Ⅰ名詞1 (潮汐; 潮水) tide 2 (比喻大規模的社會變動或運動發展的起伏形勢) (social) upsurge; cur...
- 汐 : 名詞(夜間的潮) tide during the night; nighttide
- 觀測 : observe; observation; viewing
- 潮汐 : morning and evening tides; tide潮汐電站 tidal power station
-
Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method
研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部位的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流路泥沙沉積分配的回歸計算式,據此可以預估計算河口不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來沙量與造陸面積的相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。Observation and study of the tidal variation in gravity field
重力場的潮汐變化觀測及其研究Then, harmonic analysis is done with the newest baytap - g tidal data analyzing software developed by ishiguro and professor tamura, who are working in japan and the eterna34 tidal data analyzing software developed by wenzel, who had worked in german. as a result, the recently observed tidal gravity parameters of jiufeng station are obtained. finally, the ocean loading correction of the observing tidal gravimetric parameters, the temporal synthesized tide, correction of the station air pressure and the polar motion on the gravity residual, the analysis of the final residual, and so on, are investigated
Vauterin研製的tsoft潮汐數據預處理軟體,實施了觀測數據的預處理,為超導重力儀觀測數據的國際資料交換和數據分析準備了修正後數據;然後利用由日本ishiguro與tamura研製的最新的baytap - g和由德國的wenzel研製的eterna34潮汐分析軟體,對預處理后的重力潮汐觀測數據進行調和分析,獲得了九峰臺最近的觀測重力潮汐參數;最後討論了觀測潮汐參數的海潮改正、隨時間變化的重力合成潮的構制、大氣效應改正、極移重力改正以及最終重力殘差的分析。In this paper, we analyse the influence of the temperature in cave on gravity observations at yinchuan station
摘要研究了銀川臺洞溫對重力觀測的影響,結果表明,重力非潮汐變化與洞溫變化顯著相關。Now tidal bore is one of hotspots and difficulty in scientific research. with advanced tide - controlling technology and high accurate equipment, this paper does the research successfully on the formation and changes of tidal bore under natural condition and after the bridge being built. and those processes are observed effectively
涌潮的研究是當前的熱點與難點之一,本項研究採用先進的潮汐控制技術與高精度的測試儀器,在比尺模型中成功地模擬出自然和建橋條件下涌潮的形成、變化過程,並有效地加以觀測。分享友人