計值 的英文怎麼說

中文拼音 [zhí]
計值 英文
evaluate
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  1. Stability analysis of genetic parameter estimation for agronomic characters of adzuki bean

    小豆農藝性狀遺傳參數估計值的波動程度分析
  2. In the presented method, the point estimations of the model parameters, aandb in the new model, are given by the least square method. the confidence interval for the parameter b is given as well. an engineering illustration is used to compare the result of the presented method with those of amsaa - bise model and duane model

    該模型充分考慮了增長過程中的各種可得信息,採用非參數方法得到多臺系統在各同步停止試驗時刻的可靠度,並利用最小二乘法擬合求得該模型中參數a , b的點估計值,以及b的置信限。
  3. In the end, cluster - analysis - based floating control historical regression method with uniform precipitation and atmospheric precipitable water as metoorological covariates could more validly evaluate efficiency of cloud seeding operations and significant level of ca - fcm method was higher than the other methods, because it adopted cluster analysis which highly improved the correlativity between rainfall distributions in the control area and target area, and used grid interpolation which enhanced exactness of calculating precipitation rainfall, and chose atmospheric precipitable water as the covariant which increased the inferential accuracy of natural rainfall on the cloud seeding operational area

    最後,得到以降水量和整層大氣可降水量為協變量的ca - fcm方法,由於採用聚類分析( ca )方法,提高了對比區和影響區相關性;採用網格插技術提高了雨量的算準確度;引入了不受催化影響的物理協變量(整層大氣可降水量) ,提高了作業區自然降水量估計值的準確性;所以評估效果最好,顯著水平高於0 . 05 。
  4. The current chinese foundation design code gbj7 - 89 use limit equilibrium theoiy with elastic soil stress distribution to give out bearing capacity design value calculating fonnula and use elastic soil model to evaluate foundation settlement. according to the above theories, code gbj7 - 89 gives the correlative terms. but these do not accord with the practical mechanism of loaded soil below the shallow foundation and the elastoplastic property of natural soil so defects exist

    我國現行規范gbj7 - 89將這兩者分開考慮,其算地基承載力設計值的公式是根據彈性地基中應力分佈及土的極限平衡狀態理論為依據而得出的,求地基的沉降變形時則視土體為彈性,這些理論對地基及土的假設與淺基礎地基的實際工作狀態及天然土體的非線性、彈塑性存在一定的偏差。
  5. To repeat, what the banks are trading are demand deposits denominated in different currencies.

    這里要重復說明一下,銀行所交易的,是以不同貨幣計值的活期存款。
  6. According to relevant data, all sorts of heavy metal are differred as a result of migratory ability, great majority gathers in the earth ' s surface decompose, the edaphic heavy metal that 50 years accumulative total value is less than a country to set is restricted

    根據相關資料,各種重金屬由於遷移能力差,大多數在地表聚集分解, 50年累計值小於國家規定的土壤重金屬限制。
  7. When the estimator is unbiased, the numerical estimate is frequently also called unbiased.

    當估量無偏時,數字估計值也常叫做無偏的。
  8. After the bottleneck in the original ethene production plant is analyzed, the revamp design plan for srt - iii cracking furnace is proposed. the measuring results after revampment show that the thermal efficiency and ethene recovery ratio are increased compared with the design data ; the production capacity of ethene cracking furnace is enhanced, and energy consumption is reducted

    通過分析原乙烯裝置生產存在的「瓶頸」 ,提出了srt -型裂解爐改造的設方案,並對改造後效果進行測量,熱效率和乙烯收率均比設計值有所提高,乙烯裂解爐的生產能力提高了,能耗降低了。
  9. That widely quoted range looks like an error bar - - a span of values with a well - defined probability of encompassing the true value - - but it is actually just a grab bag of model results

    這一廣泛引用的升溫范圍就像一個誤差表? ?在這些具有一定可能性的估計值中包含有真實的數? ?但實際上它只是眾數的集合。
  10. The first function returns a probability value associated with a t statistic based upon the students t distribution, while the second inverse function computes the t statistic corresponding to a given alpha setting

    第一個函數根據學生的t分佈返回了與t統計值相關的概率,而第二個反函數算了與給定的alpha設置相對應的t統計值
  11. Standard test method for luminometer numbers of aviation turbine fuels

    航空渦輪機燃料發光計值的標準試驗方法
  12. Taking the contact stress, bend stress stiffness and temperature stress as the condition, taking the weight of the kiln tyre as optimization aim function, the redia and the width of the tyre are optimized general optimize methods just consider the affecting of the parameters to aim function, but in fact, structural parameters ( such as structure dimension, interval and so on ), physics and dynamics ( damp factor, conduct factor, friction factor material ' s elastic module strength limits and so on ), which would be changed after used. the difference are called discrepancy robust design ' s basic concept is : all design parameters " discrepancy will affect the aim funct ion and arouse the quality target discrepancy

    一般的優化方法,僅僅考慮了參數對其目標函數的影響,而實際情況下有些參數是變化的,產品的結構參數(如幾何尺寸、間隙等) 、物理和力學參數如阻尼系數、傳導系數、磨擦系數、材料的彈性模量和強度極限等的設計值與製造后和使用中的實際會有差異,這種差異稱為設變量和噪聲因素的變差。
  13. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該鍋爐在實際運行中存在的問題:在額定負荷下,爐膛出口超溫、低溫段過熱器前煙溫高達936 ,遠遠超過815的設計值;噴燃器四周水冷壁結焦嚴重,過熱器管壁溫度超標,無法帶上額定負荷;甚至有時因燃煤質量的變化,必須投油助燃的嚴重情況進行了分析研究。在實際生產過程中,燃燒器的結構、布置,水冷壁的粘污、結垢,過剩空氣系數、一次風溫、煤種及其濃度變化等許多因素都會偏離鍋爐的設工況,從而影響爐內的傳熱和燃燒,造成爐膛出口超溫、水冷壁結渣等問題。
  14. We shall use the standard error of estimate as a tool in the same way that we can use the standard deviation.

    同標準差一樣,應該把估計值平均誤差當作一個工具。
  15. The standard error of estimate, on the other hand, measures the variability, or scatter, of the observed values around the regression line.

    而估計值的平均誤差,卻是度量觀察圍繞著回歸直線的變化程度或分散程度。
  16. In statistical language, this estimate is called the between-column variance.

    在統學中這個估計值叫組間方差。
  17. Sampling procedures for the monitoring of radioactivity in air ; instructions for the calculation of particle loss in sampling air ducts and instructions on estimates of errors due to anisokinetic sampling

    空氣中放射性監控的取樣.根據估計值對取樣空氣管道和
  18. Capital asset pricing model. an economic model for valuing stocks by relating risk and expected return

    以相當風險和預期收益來為股票計值的一種經濟模式。
  19. In order to identifiy the virus further, a set of double nested primers for canine coronavirus was selected. the primers were designed in s gene region from ccv including two pairs of primers : ccvfl - ccvrl, ccvf2 - ccvr2. the first is a pair of outer primer, and can amplify a fragement of 1086bp. the second is a pair of inner primer. and can amplify a fragement of 515bp. using the nested primers, many ccv strains can be identificated including k378, insave - l, ccv 1 - 71 etc. synthesizing this set of primers, we selected the panda ' s liver - tissue materials and some different passages of viral culture to amplify by rt - pcr, and all of them respectively gained two target fragements of 1086bp and 515bp, but the control cell did not

    合成該套式引物,選擇大熊貓原代病料和病毒各代細胞培養物,經套式( nested ) rt一pcr擴增,可得到一與設計值5巧bp相符的dna片段,經bst一xl ( 590 , 1110 )酶切鑒定,證明該擴增片斷為特異性片段;回收大熊貓肝組織原代病料和細胞培養物第2 、 3 、 29代的ccvfz一ccvrz擴增片段,純化,送生物公司測序。
  20. ( 5 ) parameterization of infrared satellite cloud imagery and its application in rainfall predication obvious correlation exist between the probability of rain and parameterization estimate such as average brightness temperature ( tb ), brightness temperature variance ( f ), equivalent cloudage ( cn ), brightness temperature area index ( al - the first a5 - the fifth grade, a6 - the sixth grade )

    ( 5 )衛星雲圖參數化及在降雨預測中的應用紅外衛星雲圖參數化估計值,與局地降雨過程的發生、發展具有較為密切的關系。相關較密切的參數有平均亮溫、亮溫方差、等效雲量、亮溫面積指數( 1級、 5級、 6級) 。
分享友人