計劃供水區 的英文怎麼說

中文拼音 [huàgōngshuǐ]
計劃供水區 英文
estimated water supply district
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • : 供Ⅰ名詞1 (供品) offerings 2 (口供; 供詞) confession; deposition Ⅱ動詞1 (供奉) lay (offerin...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 區名詞(姓氏) a surname
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  1. Welcome enterprises and institutions with strength such as land agent at home and aboard and design company and so on to come here to invest first - handily and develop, rich exploitable recourse of suburb will satisfy you and jinshui district is waiting for your cooperation

    真誠歡迎國內外房地產商、規公司等有實力的企業、機構前來實地考察並參與開發,城郊村豐富的可開發資源將使您不虛此行,金期待與您的合作。
  2. I have taken impotance to analyze the rallying point of famous product, concrete cost and capability of providing and guarantee in this artical, meanwhile, i have caculated the quantity of concrete needed for the year and got the regression equation with the historic data for drilling footage of eight years and the consuming quantity of oilwell cement by the method of linear regression, and it has very significance for the making of stock contract and the plan of concrete production, i have analyzed the physical distribution of oilwell cement by the transpotation flex and the advantage or disadvantage between direct distribution and distribution to store in this artical, and i have tried to find the balance point of the two distribution ways by the ecnomic analysis and pointd out the conception of economic semidiameter, and come to the conclusion of direct distribution, distribution to store, and subarea of distribution to store at last

    本文對油井應商在品牌號召力、泥成本、應保障能力等方面進行了詳盡分析,並對應商進行了能力排序;用線性回歸方法從八年鉆井進尺與油井泥消耗量的歷史數據推算了當年度油井泥需求量,得出了回歸方程,這對于油井泥采購合同的制訂、應商生產的制訂具有相當重要的意義;從運輸彈性分析出發對油井泥物流配送進行了研究,對直達配送、入庫配送的優缺點進行了詳細的分析,在經濟分析的基礎上力求找到兩種配送方式的均衡點,並提出了經濟半徑的概念,得出了直達配送、入庫配送、入庫分距離等幾項結論。
  3. The observatory has often been called upon to provide meteorological information and advice for engineering work, such as the siting and design of reservoir catchments, the design and construction of bridges and high - rise buildings and the design of drainage systems

    工程的機構經常要求天文臺提氣象資料及有關意見以協助展開各類工程,例如塘集之選址及設橋梁及高聳建築物之設及建造排系統的設等。
  4. Plan ( china ) is designed to develop a model that integrates the safe water supplies, sanitary living conditions and poverty reduction at the community level in rural areas of west china by cooperating with provincial green projcet and local women ' s federation, focusing on institutional capacity building and partnership between rural communities, government, and ngos for sustainable environment and resource management and livelihood improvement

    國際(中國)與環保局(綠色文明辦公室)及陜西省當地婦聯合作,致力於在中國西部農村社建立一個集安全飲用應、村民居住生活條件改善和扶貧為一體的項目模式,著眼于對相關機構進行能力建設並促進與農村社與政府及非政府組織之間的合作以實現對環境與資源的可持續性管理以及生平的改善。
  5. The proposed 800 mm diameter salt water main is a pumping main to deliver sea water from the existing kowloon south no. 2 salt water pumping station to the existing yau ma tei salt water service reservoir. this serves to provide flushing seawater supply to south kowloon areas including the west kowloon cultural district scheme area

    建議的直徑800毫米的鹹管是泵干管,作用是把海由現有的九龍南二號海站輸送至現有的油麻地海庫,從而為九龍南部地,包括西九龍文娛藝術,提沖廁用的鹹
  6. Which is situated in the western of he nan and is drought year in year out and it is a multiple - purpose water supply development with agricultural irrigation, municipal water supply and rural water of men and domestic animals. the irrigation district was designed by he nan water survey designing institute in 1967, and began to be built in 1970. the aggregate main canal and the east - two main canal were built up and began to irrigate partially in 1974. up of the dong song part of the main canal had been built in 1980, and the first periodical project was completed in 1991. one part of the west main canal was built afterward

    河南省陸渾灌是河南省百萬畝以上大型灌之一,地處十年九旱的河南省西部,是一集農業灌溉,城市,農村人蓄吃為一體的多目標工程,灌於1967年由河南省利勘測設院開始勘測規, 1970年開工建設, 1974年建成總乾渠、東二乾渠,並通局部施灌, 1980年完成東一乾渠東宋以上渠段, 1991年第一期工程竣工驗收,以後又修建了西乾渠部分工程。
  7. Salt water supply for northwest new territories

    新界西北
  8. To provide more sports facilities for teenagers in shamshuipo, students proposed to build a basketball field and a shopping arcade near the golden computer arcade

    同學于深?黃金商場一帶建設籃球場及大型商場,為內青少年提更多休?娛樂場所。
  9. Self - supply wells in the groundwater over - extracted area will be phased out and the reconstruction and expansion of existing water distribution network will be completed

    分步驟地關停地下超采地部分自備井,同時對現有管網進行改造。
  10. Under the pilot scheme, owners of existing and new non - domestic buildings located in the designated areas can submit an application to the wsd for approval of the use of fresh water for evaporative cooling in air - conditioning systems

    根據所有在選定地內現有及新建的非住宅建築物的擁有人,均可向務署申請使用淡蒸發式冷卻的空調系統之用。
  11. The existing 800 mm diameter fresh water main is a primary distribution main to serve the southern area of west kowloon reclamation including the west kowloon cultural district scheme area

    現有的直徑800毫米食管是為西九龍填海南部,包括西九龍文娛藝術應食的配管。
  12. There are existing 800 mm and 1200 mm diameter fresh water mains alongside lin cheung road. which of these mains should be used to serve the development area, assuming kowloon point reclamation will not proceed

    假設九龍角填海不會繼續進行,沿連翔道現有的800毫米和1200毫米食管,哪一條會用來為發展
  13. Green area ecological space is an important component of man ecological space. based on the spot investigation, the paper elaborates the constitute of green area ecological space of waterfront in city, utilizing the theory of landscape ecology, theory of environmental psychology and behavior psychology, theory of ecocity and theory of relative planning and design. the purpose is to provide reference for the ecological planning and design of waterfront in city

    本文以景觀生態學理論、環境心理學與行為心理學理論、生態城市理論以及相關的規理論為指導,在對上海、北京、哈爾濱三地濱綠地實地調查的基礎上,對城市濱綠地生態空間的構建進行了比較系統的闡述,以期為城市濱景觀的生態規與設借鑒與參考。
  14. The application will be considered taking into account a number of relevant factors, including the need for the service, the level of service already provided or planned by other transport operators and traffic conditions in the area and on the roads where the service is to be provided

    本署會就申請考慮多項因素,包括對擬提服務的需求、其他公共運輸經營者已有提或已作的服務平,及擬提服務的地及道路的交通情況等。
  15. It result in water level rising, hypo - salinification aggravating, sediment silting up, the lake atrophy, marsh extending and nature disaster such as droughu waterlog ^ salinification occurring frequently. completely analysis to geology and hydrology conditions of the district along yellow river in shandong has been applied in this paper and aquifer ' s hydrological characteristic and subsurface flow ' s characteristic have been analysed as keystone in the paper. after finding out the distribution rule and formation conditions of the shallow layer " s ground water resource, divide the district into three hydrological sections according to hydrological conditions and subsurface flow characteristic

    本文對山東沿黃地帶地質、文地質條件進行了全面系統的分析,並重點分析了內含層的文地質特徵及地下運動特徵,進一步查明了淺層地下資源的形成條件和分佈規律,根據文地質條件及地下運動特徵,分出三個文地質分並論證了粘土裂隙含層的形成及意義;確定了科學的文、文地質參數,為準確地算淺層地下資源奠定了可靠的基礎;根據淺層地下資源形成特點,建立了地下均衡方程式,據此,算了內淺層地下資源及淺層地下可采資源。
  16. Is responsible for proposing policies, enforcing environmental legislation, monitoring environmental quality, providing collection, transfer, treatment and disposal facilities for many types of waste, advising on the environmental implications of town planning and new policies, handling pollution complaints and incidents, and raising awareness and support in the community for environmental initiatives. these responsibilities are spread across seven programme areas including air programme, community relations programme, environmental assessment and planning programme, noise programme, waste programme, waste facilities programme and water programme

    負責擬訂政策,執行環保法例,監察環境質素,為多類廢物提收集、轉運、處理和處置設施,就城市規及新政策對環境的影響提意見,處理污染投訴和事件,提高市民的環保意識,以及鼓勵市民支持環保工作。這些職責共涵蓋7個綱領包括空氣綱領,社關系綱領,環境評估及規綱領,噪音綱領,廢物綱領,廢物處理設施綱領及綱領。
  17. The project cost is about $ 3. 3 billion. the schemes provides treated water to the north - eastern part of the new territories and the metropolitan area

    有關工程的費用約為三十三億元,這項旨在為新界東北部及市應經處理的食
  18. The paper puts forward a mode of water allocation on the combined water - supply and water - demand management, drawing lessons from international advanced water management to solve the problems of uneven time and spatial distribution and periodical fluctuation of transferred water, that is, setting up the mode of water bank which can make up planned water - supply management and strengthen water - demand management in water receiving areas

    摘要針對南北調中線工程特點以及資源配置中的突出問題,為了應對受資源時空分佈不均以及調量周期性波動造成的特點,借鑒國際上先進的調工程管理經驗,提出基於管理與需管理相結合的南北調中線資源配置機制,即建立「銀行」式管理模式,它可以彌補傳統管理性分配的不足,並加強對受的需管理。
  19. The " water - the origin of life in wetland " schools environmental award scheme cum student environmental protection ambassador scheme 2002 2003, jointly organized by environmental campaign committee, education and manpower bureau and wwf hong kong was successfully held during jan to march 2003. three environmental training activities were provided, allowing the ambassadors to involve in wetland management, volunteer work in nature reserve and field study in mai po wetland

    由環境保護運動委員會教育統籌局及世界自然基金會合辦的-濕地生命之源02 03年度學屆環保大使訓練,已於2003年1月至3月進行,該訓練共提三次的環保訓練活動,讓各環保大使能親身體驗濕地的管理工作,並身體力行於自然保護內擔任義務工作及考察米埔濕地。
  20. Improvement to hong kong central mid level and high level areas water supply - remaining works

    港島中半山及以上地改善餘下工程
分享友人