計劃停車 的英文怎麼說

中文拼音 [huàtíng]
計劃停車 英文
programmed stop
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • : Ⅰ動詞1 (停止) stop; halt; cease; pause 2 (停留) stay; remain; stop off [over]: 船在錨地停了一...
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  1. Phase ii of parking meter replacement programme

    第二階段收費表更換
  2. Using the logarithm graph, multi - varieties production batch problem is resolved. the production scheduling is realized with heuristic traverse algorithm. at last, the strategies, which include disassembling task, shorting interval of the working procedure, overlapping working procedure, deferring the back working procedure etc., are brought forward to deal with the order ' s inserting, postponement, freezing and doing again on carrying out the production plan

    3 )分析了企業職能信息系統的集成性和各部門間的協調性,研究間生產的制訂過程,以模糊多屬性折衷式模型實現了工藝路線的決策,採用對數坐標圖表法,解決了多品種生產批量問題,用基於啟發式的遍歷演算法實現了生產工單的排產,最後提出了任務分解、縮短工序間隔,相鄰工序時間疊加,延遲后續工序等控制策略處理執行過程中工單的插單、延期、掛與返工等特殊問題。
  3. Above all, this paper discusses the frame, system functions, user demands, construction preconditions and conformity planning based on the introduction of study and application situation ; then, planning project, planning process and foundation of guidance system in grades, including guidance strategy in four grades are studied ; whereafter, the thesis analyzes setting requirements and modes, installation angle, dimension and colour, display contents and arranging sequence and fonts of parking guidance sign, it is mainly studied that calculational method of distance between the variable message signs

    本論文首先在介紹誘導系統研究與應用情況的基礎之上,論述系統框架結構、系統功能、用戶需求、建設誘導系統的條件與誘導系統與智能交通系統的整合規等問題;接下來制定了誘導系統規方案,提出區域性誘導系統規步驟,研究分級誘導體系的建立方法,提出四級誘導策略;然後分析誘導標志布設的具體要求、設置方式、安裝角度、尺寸與顏色、顯示內容及排列順序、字體等問題,重點研究並給出可變信息板設置間距的算方法。
  4. Separately, we have also developed various schemes including taxi drop - off points and lifting many stopping restrictions. we shall be testing a pilot taxi pick - up and drop - off point scheme in march to further strengthen the role of taxis in providing point - to - point service

    另外,我們亦分別制訂多項,包括設置的士落客點、放寬多個限制區,以及試驗設的士上落客點等去加強的士點到點的服務。
  5. Put important items not scheduled for the meeting on a “ parking lot ” flip chart for discussion later

    把那些外的重要主題專門放在「場」掛板上以後再討論。
  6. None of the 560 reformer tubes requires replacement at this stage, but the 6 nipped tubes should be removed and plans put in place to replace these and approximately 16 other tubes, nearing the end of their life through creep, at the next shut down

    在本階段, 560根轉化爐管都不需要更換,但是有6根已經掐斷的管應該被移走,還有大約16根其他的管子壽命也快到終點了,在下次的時候進行更換。
  7. Question 5 : is there any specifying of quantity for the establishment of parking lots in appendix ? 4 ? ( how will the parking lots be allocated in various squares

    《設任務書》附件4中的場設置是否有數量上的分(各個廣場之間如何分配) ?
  8. Parking area ; at least 20 buss berth for the visitors in groups, 50 small vehicle berths for internal usage ; small vehicle of visitors can park at the public underground car park in the sculpture park

    輛出入口:輛主要出入口位於地塊北面沿山海關路側,需做好道路交通組織設;尤其注意處理地下內部場與地下公共場出入口和坡道的規與組織。
  9. Firstly it spares a large amount of lubricants and reduces the expenses of 1, 000 yuan for a single pump per year. indiect economic loss of unplaned shutdown caused by nonclearence between bearings and the shafts are accoridingly reduced

    首先是節約了大量潤滑油,單臺泵潤滑油損耗每年可減少1000元左右,同時也減少了抱軸次數和影響整個裝置循環或非計劃停車所造成的間接經濟損失。
  10. The schedule of accommodation and preliminary design brief for core arts and cultural facilities states the number of car parking spaces for each of the core arts and cultural facilities as a requirement of the government s baseline for each individual facility concerned. however, proponents are not expected to provide an aggregate of all car parking spaces stated in the schedule of accommodation and preliminary design brief for core arts and cultural facilities ( 2, 300 in total ) for the exclusive use of the core arts and cultural facilities

    核心文藝設施的用途分配表和初步設大綱列出每項核心文藝設施所需的位數量,訂明為政府基線對有關的每一項設施的規定。不過,政府並沒有要求建議者把核心文藝設施的用途分配表和初步設大綱所述、為數合共2300個的位,全部撥予核心文藝設施專用。
  11. The pro lcool programme ended with a hangover around 1990 as oil prices fell and cane growers switched back from ethanol to sugar, infuriating drivers of ethanol - only cars

    這項在1990年隨著石油價格的下跌開始滯,而一些種植甘蔗的農場主也開始從乙醇轉向糖業,留下的是那些憤怒的只能以乙醇做燃料的汽司機。
  12. This would require closure of the carpark at hennessy centre and relocation of their loadingunloading bay at jardine s crescent

    要落實這項,須關閉興利中心的場,並須遷移該中心位於渣甸坊的上落貨處。
  13. At the same time, parking difficulty bring out out - of - order parking, traffic confusion, traffic accidents, environment pollution and etc. therefore, parking problem has been pay attention to by the related management department of government and drivers. faced with the status of insufficient urban road resources, the experts and scholars of transportation engineering proposed its ( intelligent transportation systems ) to settle traffic problems and improve transportation efficiency. pgs ( parking guidance system ) is the application of its in the parking field, and the efficient approach to enhance urban parking management level and settle urban parking difficulty

    本論文依託吉林省科技廳科技發展項目《誘導系統理論方法和實施技術研究》 ,以誘導系統的核心? ?信息為主線,主要剖析如下五個問題:為什麼要進行有效泊位預測及預測的方法;如何基於場選擇進行誘導路徑優化;怎樣實現泊位預定;如何合理發布泊位信息;通過什麼方法來實現泊位信息的高效傳輸。
  14. The ha announced that it has approved a voluntary exit scheme for about 650 surplus staff arising from divestment of its retail and car parking facilities

    房屋委員會宣布已通過為約650名因分拆出售其轄下零售和場設施而受影響的公務員,推行一項自願離職
  15. The ha announced that a voluntary exit scheme will be introduced for civil servants affected by the ha s plan to divest its retail and car - parking facilities

    房屋委員會宣布將推出一個自願離職,為受房屋委員會分拆出售轄下零售及場設施影響的公務員,提供一個提早退休的機會。
  16. Car park privatization scheme

    場私營化
  17. Information paper on pwp item no. 720cl - engineering infrastructure works for pak shek kok development, stage 2c - road l5 and adjoining parking and loading unloading areas

    關于"工務項目第720cl號-白石角發展基礎設施工程-第2c期l5道路及毗鄰及上落客貨區"的資料文件
  18. By urban economy is developing rapidly, parking accommodations of urban center can not catch the stride of social economy, so it have a whole host of issues. parking accommodations construction of urban center in our nation have been an important subject in city planning

    隨著我國城市經濟的迅猛發展,中心區的設施建設已不能跟上社會經濟發展的步伐,因此產生一系列問題,相應的中心區設施的規逐漸成為城市規和建設的一個重要課題。
  19. The planning scheme shall include full consideration to the connection with traffic systems, land functions, subway lines, stations and car depots, with specific arrangements made for the car depot and its overlying development ; and also to the connection with various means of transport should be fully considered, with subway stations, bus lines and parking facilities arranged properly to improve the access of residents

    應充分考慮交通系統規、用地功能布局與地鐵線路、地鐵站點及輛段的銜接關系,提出地鐵輛段及上蓋綜合開發的具體設方案;充分考慮各種交通方式的銜接併合理設置地鐵站點、公交線路、設施,改善居民出行環境。
  20. 13. the housing authority originally planned to divest its retail and car - parking facilities through an initial public offering of the link real estate investment trust the link reit in december 2004

    13 .房屋委員會本來在二零零四年十二月,通過公開招股發售領匯房地產投資信託基金領匯基金的方式,分拆出售其商場及場設施。
分享友人