計劃周期 的英文怎麼說

中文拼音 [huàzhōu]
計劃周期 英文
planning cycle
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • : Ⅰ名詞1 (圈子; 周圍) circumference; periphery; circuit 2 (星期) week 3 [電學] (周波的簡稱) c...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  1. Freight ton ? kilometers ( passenger ? kilometers ) : refer to the sum of the products of the volume of transported cargo ( passengers ) multiplying by the transport distance, usually using ton ? kilometre and passenger ? kilometre as units for measurement

    貨物(旅客)轉量:指在一定時內,由各種運輸工具運送的貨物(旅客)數量與其相應運輸距離的乘積之總和,是反映運輸業生產總成果的重要指標,也是編制和檢查運輸生產算運輸效率、勞動生產率以及核算運輸單位成本的主要基礎資料。
  2. Horner s responsibilities include developing consistent and optimized user interfaces, localizing products for international markets, championing crossfunctional technology initiatives, and managing the product lifecycle

    Horner負責的工作內容包括:開發一致優化的用戶界面,本地化需要投放到國際市場上的產品,支持跨功能技術,同時管理產品生命
  3. The seismic signals detected enabled the determination of the epicentres of intense earthquakes when analysed with data obtained by seismographs in other countries. the long - period seismometer now in use at the hong kong observatory headquarters has been in operation for nearly 50 years, since the international geophysical year of 1958

    香港天文臺明年購置一臺寬頻地震儀取代長地震儀,令地震波的分析及地震定位更精確,亦可收集更豐富的地震數據供建築工程界使用,寬頻地震儀對0
  4. However, some initiatives have a lifespan measured in years

    但是,一些有一個按年算的生命
  5. Time was reckoned by the position marked off in constellations on the ecliptic in which the moon rises daily in the course of one lunation ( the period from new moon to new moon ) and the sun rises monthly in the course of one year

    時間是通過黃道帶星座的分位置而算,月亮是在一個陰歷月間每天上升(新月到新月的) ,太陽是在一年中的每個月上升。
  6. My premier ladys benefit is a comprehensive womans protection plan. coverage includes protection for 8 critical illnesses and 13 common illnesses treatments that are specific to women, a rewarding refund of premium, and a revolutionary maternity benefit

    我的智愛女性附加保障是一份全的女性保障,保障包括8種女性危疾和13種女性常見疾病治療,並在保單滿時提供保費回贈以及革命性的懷孕保障。
  7. Developing training programs in the nuclear fuel cycle

    核燃料的培訓的制定及發展
  8. The walking stability has direct relation to the gait of the robot, and whether the gait is nicer is vital to the stability. by researching of the walking habit of human being, we proceed the gait planning of biped walking robot, decide the single foot supporting and double feet supporting, and bring forward the principle of phase divided and divide a gait cycle into eight sub - phases. that guarantees the continuity, stability of the whole walking

    而步行穩定性與機器人的步態有著直接的關系,良好的步態對步行機器人的穩定性來說又是至關重要的,通過對人類步行習慣的研究,對兩足步行機器人進行步態規,確定了步行機器人的單腳及雙腳支撐,提出了分相的原則,並將一個步態分為八個子步相,保證了運動過程的連續、平穩,並利用zmp理論對步行機器人穩定性進行算,給出靜態穩定步行的條件。
  9. Critical chain method was inducted for the delay caused by uncertain time of completing missions. the method of confirming the logic and restriction among the missions was originated. application of critical chain in the project was researched by case alysis

    然後在網路中引入關鍵鏈原理從總體上考慮影響項目的不確定性因素,給出利用各種約束關系確定關鍵鏈的方法,並通過對實例的分析,探討了關鍵鏈對項目計劃周期的影響。
  10. The reasons are that in a scavenging grid, which snatches computing cycles from desktop pcs, ownership of the resources remains local and scheduling must accommodate the needs of the owners

    原因在於,拾遺網格是從桌面pc中獲取,而資源的所有者仍然在本地,所以網格對資源的規必須適應資源所有者的需要。
  11. The second variable of supply chain management performance is velocity - or the speed of the supply chain. it is governed by the speed of access to good data, planning cycles and execution cycles

    供應鏈管理成效的第二個可變因素是供應鏈的加速度,或其速度.它是由獲得貨品數據,計劃周期及執行這三方面的速度所管轄著的
  12. The article analyzes the frame time planning of shipbuilding system, introduces the concept of flexible plan, realizing channels, and also the establishing principle and methods of long - term planning, middle - term planning, center planning, monthly plan, weekly planning, and daily planning under center production model

    本文分析了船舶建造系統時限,以及柔性的概念和實現的途徑。在中心製造船模式下長、中、月和日等建立的原則和方法。
  13. Manugisticss transportation and distribution route plan can build up routes for daily operations, and set up the plan of main shift schedule during each plan cycle

    Manugistics的運輸配送路徑規,能建立每日運作的路徑,並且於各中設定主班表規
  14. Planning cycles will decrease, with faster updates on plan changes, impact of promotions and other events

    計劃周期減少,可以更快地更新有關變更、促銷效果和其他活動的消息。
  15. A work schedule describes the planned duration of working time and the working time pattern for a specific calendar period

    工作表描述工作時間的計劃周期和對特殊日歷間的工作時間模板。
  16. The virtual company, outsourced non - value manufacturing, will result in planning of the outsourced activities ( e. g. forward forecasting on how much and when to manufacture )

    計劃周期減少,可以更快地更新有關變更、促銷效果和其他活動的消息。
  17. The district is responsible for all aspects of the project ' s life cycle from planning, implementing, and overseeing expenditure of grant funds to providing a detailed final report

    答:地區有責任對整個計劃周期,從策、執行及監督獎助金經費的支出,各方面都要提供一份詳細的結案報告。
  18. A : the district is responsible for all aspects of the project ' s life cycle from planning, implementing, and overseeing expenditure of grant funds to providing a detailed final report

    答:地區有責任對整個計劃周期,從策、執行及監督獎助金經費的支出,各方面都要提供一份詳細的結案報告。
  19. Based on netomac, a software package for power system simulation, the model and algorithm of pre - dispatch schedule in generation markets, excitation system parameter setting, and power system small signal stability anaylsis are studied in this thesis. the main work is as follows : a model of pre - dispatch schedule is proposed, whose target is to minimize the market purchasing price ( mpp ) in the whole pre - dispatch period. then according to the characteristics of pre - dispatch schedule, the model of pre - dispatch schedule is simplified to minimize the mpp in each pre - dispatch time, and a three - step algorithm of pre - dispatch schedule is designed : dealing with the optimal problem in the whole period of pre - dispatch with static planning method, solving the problem of combination of machines with pr1 method, resolving problem of optimal power flow ( opf ) with modified powell method

    本文基於netomac模擬軟體,以發電市場預調度模型及演算法、勵磁系統參數整定和電力系統小擾動穩定性分析為研究內容,主要做了以下工作:建立了以整個預調度計劃周期內的市場購電價格最小為目標的發電市場預調度模型,並根據預調度問題狀態數多、變量多、混合整數、非解析的特點,將預調度模型的目標函數簡化為各時段的市場清算電價最小,設了三段式預調度演算法:用靜態規法求解整個預調度計劃周期內的優化問題;用優先級法求解機組組合問題;用改進的powell法求解最優潮流問題。
  20. To carry the unit faults diagnose system and change traditional plan periodic repair mode into the combination of plan repair with state repair, it will greatly reduce production cost and then enhance the competition ability of power plant

    而對機組進行故障診斷,改傳統的計劃周期性檢修為性檢修與狀態檢修相結合,就可大大降低生產成本,從而提高電廠的競爭能力。
分享友人