計算機基座 的英文怎麼說
中文拼音 [jìsuànjījīzuò]
計算機基座
英文
ducking station- 計 : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
- 算 : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
- 機 : machineengine
- 計算機 : computer; calculator; calculating machine; computing machinery; electronic wizard; processor; pro...
- 計算 : 1 (求得未知數) count; compute; calculate; reckon; enumerate 2 (考慮; 籌劃) consideration; pla...
-
The first lecture of series on nov. 19 : lecture about linear algebra and computer figure was launched at teaching building room 312 at 7 : 00
11月19日,基礎學科講堂的第一次講座:線性代數與計算機圖形學于晚7 : 00在我校教三樓312教室舉行。In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure
針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與底板間設隔離層、增設外防水層、出水管與邊墻採用柔性連接、機座與底板整體澆注、採用先進計算理論指導配筋。Based on the stochastic finite element method, the reliability of the arch dam gravity abutment is analyzed, and the corresponding reliability index is calculated
然後在隨機有限元的基礎上進行拱壩的拱座? ?重力墩的強度和抗滑穩定可靠度分析,計算相應的可靠指標。Using the simulation calculation procedure imitate calculating vibration of the driver seat in sample car, the center of the compartment, distance 300 mm of the backboard of the compartment. the result of calculation and experimental result are relatively well identical. have shown the exactness of the vehicle vibration models that are set up and validity of the vehicle vibration simulation calculation procedure
用該程序對樣車的司機座椅、貨廂中心、距貨廂后板300mm三處的振動進行了模擬計算,計算結果與實驗結果基本穩合,表明了所建立的車輛振動模型的正確性和車輛振動模擬計算程序的有效性。On the basis of analysis of design criterion of shaft washer and housing washer of tandem composite type cylindrical roller thrust bearing, we present a mathematic model for optimal design in accordance with line contact requirement for cylindrical roller and race, design the washers thickness and thickness variation angle by the search algorithm of constrained stochastic direction
摘要在分析串聯組合型推力圓柱滾子軸承軸圈和座圈設計準則的基礎上,按滾子與滾道線接觸要求建立其最優化設計數學模型,採用機械優化設計中的約束隨機方向搜索法計算軸圈和座圈的厚度、厚度變化角。This update applies to windows 2000 sp3 - based computers with chipsets containing a pci to pci bridge connecting to a docking solution that also contains a pci to pci bridge
此更新適用於基於windows 2000 sp3的帶有晶元組的計算機,這些晶元組所包含的pci到pci連接橋連接到也包含pci到pci連接橋的底座解決方案。Based on the deep analysis of the reasons of the cracking of the gear table cylinder of the 16t - 33m portal crane, this paper puts forward the repairing way of the cylinder and fully calculates to confirm
基於對16t ? 33m門座式起重機轉臺筒體開裂的原因的深入分析,論文提出了筒體修復方案,並給以充分地計算論證。A great number of calculating results show that eeabs is effective and practicable. in addition, the method has been successfully applied into optimum design of two types of range - changing mechanism of gantry crane and the software systems of optimization design and analytical calculation of straight - arm gantry crane and ? ptimization design and analytical calculation of balance pulley compensation gantry crane ? has been compiled
另外,作者還對基組結式消元法在兩種門座式起重機變幅機構優化設計中的應用做了成功的嘗試,並編制了「變幅補償直臂架門機的優化設計和分析計算」和「平衡滑輪式補償門機的優化設計和分析計算」軟體系統。This paper introduces the development and present situation of vibration absorb technology in the world ; generally analysis the rubber - bearing ( rb ) and lrb " s operative mechanism, function and the calculation of parameter ; advance the concept of standardization to lrb ; on the basis of generally analyzing the connected factor such as the site category, the diameter of lead bar, the height of bearing, the designing carrying capacity, the span of bridge, the inherent period and the displacement of rb, determine the parameter, the absorbing vibration target, the method and the process of standardization to lrb ; then according to the two - step rule of resisting and defending earthquake, and combining with the response spectrum theory in the seismic vibration of bridge, make a lot of calculation and analysis of vibration absorb design to the real bridge collected and combined by finite element program ; at last, gives the result of standardization through diagram and explains to its usage
本論文介紹了國內外減震技術的發展和現狀;綜合分析了普通板式橡膠支座和鉛銷橡膠支座的工作機理、性能及參數的計算;提出了鉛銷橡膠支座標準化的概念;在綜合分析場地土、鉛銷直徑、支座高度、設計承載力、橋梁跨徑、固有周期以及支座變位等影響因素的基礎上,確定了鉛銷橡膠支座標準化的參數、減震目標、方法和過程;並根據抗震設防兩階段原則,結合橋梁地震振動理論的反應譜法,運用有限元程序對收集和組合的實橋進行了大量減震設計的計算和分析;最後以圖表的形式給出了鉛銷橡膠支座標準化的結果,並說明了其使用方法。A state - of - the - art avionics suite with a digital 1553b mil std data bus, full systems redundancy, a glass cockpit, laser ring ins / gps nav, a mission computer and an integrated weapons system
以1553b數據總線為基礎的開放式航電系統包括全系統冗餘,玻璃化座艙,激光慣導/全球衛星導航定位系統,任務計算機和一體化武器系統。The subsystem consists of analyzing the formative reasons of bridge ' s damages and making decision in how to maintaining and consolidating. in it, the decision - making tree model and the representative knowledge repository of the methods of maintainence and consolidation are built ; the fifth chapter is the application of the system. the main steps in use and the way of dealing data are expressly presented in cite of the application of tow bridges ; the sixth chapter is the systemic analyses in software and the design in its framework, including the course of design, basic framework and its function ; the seventh chapter is the conclusion
這個子系統是整個系統的基礎;第三章是評價子系統,提出用以評價橋梁技術狀況三大單項指標和綜合指標,並制定了相應的評價標準;第四章是決策系統,包括病害原因分析以及養護維修決策,建立了橋梁的決策樹模型和典型的處治對策專家庫;第五章是橋梁維修加固計算機系統應用,介紹了系統在實際應用中的主要步驟及數據統計處理的方式,並以兩座橋為例說明系統的應用過程;第六章是軟體系統分析及結構設計,介紹了系統軟體的設計過程、基本結構和功能;第七章是結論與展望,綜述了本文中的主要論點及工作成果,對存在的不足之處和今後的努力方向提出觀點。Correlative function method and variable function method are used to calculate the relevant range of soil layer. the limit capacity of bored pile is determined by the cone penetration tests ( cpt ) and the static loading tests and related statistics parameters are also evaluated. considering the effects of group piles, the action effect is calculated by the settlement of pile foundation and the reliability index of single pile as well as group piles is determined by monte - carlo method
本文選擇臨近場地的四座高層建築地基的全部勘測資料,以沿深度方向的一維平穩高斯隨機場作為樁基土層土性參數的數學模型,利用相關函數法和變異函數法計算土層的相關范圍,由cpt和靜載試驗結果綜合確定鉆孔灌注樁的極限承載力,進而對相同場地各試樁的承載力進行折算后檢驗其概率分佈,並估計有關統計參數:考慮群樁效應確定樁基承載力,由樁基沉降反算其作用效應,由monte - carlo方法計算單樁及群樁的可靠指標。分享友人