計算負荷 的英文怎麼說

中文拼音 [suàn]
計算負荷 英文
calculated load
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • 計算 : 1 (求得未知數) count; compute; calculate; reckon; enumerate 2 (考慮; 籌劃) consideration; pla...
  • 負荷 : [電學] load; charge; weight
  1. How to determine the denitrifying load in the calculation of the oxidation ditch

    如何確定氧化溝中的脫氮
  2. The relationship between velocity and extern load for the two cooperative behaviors are calculated based on the energy conservation

    並且分別了這兩種協作行為得出的肌肉所外力與收縮速度的關系。
  3. In the process of arithmetic design, newton " method is used to compute power flow of network. graph theory knowledge is used to determine all paths from generator to load. to improve efficiency, thesis use branch expunction method to optimize the node order

    在演法設過程中,採用牛頓拉夫遜法進行潮流得到系統潮流分佈,利用圖論原理中的路徑搜索演法確定了發電機對的供電路徑,此外為了提高潮流跟蹤的效率,利用了支路消去法進行節點順序的優化。
  4. The calculation and design procedures of air conditioning load, ground loop heat exchangers, radiant floor system, distribution system between heat pump and build are mainly introduced

    重點介紹了建築空調、地下埋管換熱器系統、輻射地板系統以及熱泵和建築物內分配系統設等方面的內容。
  5. The optimal emergency generator tripping and load shedding measures based on corrected transient energy function ( ctef ) method are proposed in this paper which aim to prevent cascading outages

    研究了基於修正的暫態能量函數的最佳切機和切新方法。
  6. The main hardware is the collection equipment, the software is the windows dna framework, distribute calculate resolves the problem of data server down because of heave calculate mission. system provides the mis sub - system base on ie, which make data - query and report forms not limited by the special network. the new module, standard interlink module is aimed at the problem of not pluralize between different system, can make system utility in administrative levels

    系統有硬體和軟體組成,硬體的基礎是採集裝置;軟體採用windowsdna構架,使用分散式,解決了原來系統的任務過于繁重造成數據服務器不能承擔的問題;服務方面提供基於ie的mis系統,使數據查詢和報表服務擺脫了原來的專用網路的限制;新增加模塊「標準互連」模塊是針對目前各種自動化系統不兼容的問題而產生的,可以實現電力自動化在更高層次上的實現,在這個模塊中,有意識的採用
  7. The former includes air - bearing table system, rolling base driving system, angular displacement sensing system, and two foldable flexible plates with piezoelectric patches bonded ; the latter includes sensing signal processing and actuation signal generating circuits, and computer system composed of pc and two tms320f240

    整個控制系統的處理器是一個由兩塊tms320f240和586微機組成的主從復合系統,通過對計算負荷的合理分配,有力地保證了控制的實時性。
  8. This paper, based on the electric policies of some city, compares in aspects of the capacities and electric powers of main equipment, initial investment, annual operating power costs and the economic analysis of ice storage air condition with normal air condition in different quantity of the storage - ice

    本文鑒于某市的電價政策,通過某工程的設日及全年空調,得出各自所需的設備容量及電功率大小,分析比較了初投資及年運行電費等,並按不同的設對此工程進行了不同蓄冰量時的經濟分析比較。
  9. Secondly, their aims are made the investment of substations, feeders or running cost of electric power system minimum. but they do n ' t take into account of land utilization, street accessibility of right of way, etc., but demands of electric power system. generally, a straight line distance, namely, euclid distance, was used for calculating the distance between a load point and a substation, which is a straight forward but non - practical way for most planning techniques

    其次受研究工具的限制,這些模型以工程投資、運行費用等最小為目標,僅能考慮導線載流量、電壓降等電力系統技術約束條件,簡化略去了用地限制、街道可達性等重要的自然約束條件,且求解這些模型的前奏是計算負荷點到變電所的歐幾里得距離(直線距離) ,簡便但不切合實際(這一點在城市電網規劃中尤其重要) ,因此較難給出技術上可行的最優解。
  10. The operation data is used more safely by embedded, thus the maintenance and extending of the program becomes easy. the program also has taken inner - plant economical operation into account. from the simulate - optimistic calculate, it is proved that the model and arithmetic is practicable and can be used as the guideline of opertation

    本系統能夠根據不同的水庫起始水位、日天然入庫流量、日、梯級間的水流滯時進行優化,同時考慮廠內經濟運行,通過模擬優化證明,該模型和演法是適用,能夠用來指導實際運行。
  11. This thesis discussed the affection of all kinds of components contingency and the components " position in the line and other factors on the evaluation of load point reliability index. this thesis adopts a integrative method to deal with simple or complex distribution network with the system ' s practical operation characteristics and the results of the example reveal that it is feasible. the key to study the economics of power system reliability is outage costs

    在定量評估點或系統可靠性指標的研究中,本文較全面地分析了各元件故障和元件在線路中的位置以及劃檢修、臨時停電、天氣因素、轉移等因素對估點可靠性指標的影響;研究了現有的可靠性評估模型,結合城市電網的實際運行特點,採用一種綜合的方法估輻射型電網的可靠性指標,例結果表明它是有效可行的。
  12. With the development of the electrical power enterprise and computer technology, it is important to design a highly efficient , better maintainable and graphic interface based software package for power system analysis and computing in the paper , the author put forward a kind of new sensitivity analytical method which take into account load characteristic to fix on the weak bus, and with example to prove the exactness of the algorithm ; developed the visual electrical power system analysis and computing and graphic sporting system, the software package was developed by using the idea of object oriented programming , the method of class ' s inheritance , polymorphism and virtual function, and set up equipment - chart element - the interreaction between class this make it easy to expand, maintain and replant

    隨著電力事業和機技術的發展,研製高效率、可維護性強、具有良好用戶界面的圖形化分析軟體成為電力系統分析研究的重要任務之一。本文提出了一種特性的靈敏度分析方法來對薄弱母線進行確定,並用例驗證了演法的正確性;開發了圖形化的電力系統分析軟體和圖形支持系統,該軟體完全採用面向對象的設方法,充分利用了類的繼承、多態性質和虛函數的方法,建立起設備圖元類之間的相互關系,使軟體具有高度的開放性、可維護性、可移植性。
  13. Excel designs in the cold load computation in the air - conditioning system application

    在空調系統設中的應用
  14. As the traffic system has nonlinear, fuzziness and uncertainty, is a distributed system. a kind of urban traffic control system based on multi - agent is designed in this paper. the control system adopts the distributed control structure and distributed compute mode which is to strengthen the real - time property and robustness of urban traffic control system

    2 .由於交通系統具有較強的非線性、模糊性和不確定性,是一個典型的分散式系統,論文設了一種基於multi - agent框架體系的區域交通信號控制系統,該框架體系採用了分散式控制結構,以分散式模式平衡交通控制網路的計算負荷,從而提高控制系統的實時性和魯棒性。
  15. This thesis put forward a systemic method to settle the negative friction in project design. it includes when the negative friction must be consider, the zero position decided, count the down load, the negative friction group pile, the infection on end - bearing and sedimentation and stability, how to deal with in design to avoid the negative friction and how to solve when the negative friction produced

    本文提出了在工程設中如何處理樁基摩擦力的方法,包括什麼情況下考慮摩擦力、摩擦力中性點位置的確定、樁基下拉載的摩擦力的群樁效應、摩擦力對樁基豎向承載力和沉降的影響、設施工中如何避免出現摩擦力以及對已經出現的摩擦力如何根治。
  16. This distributed management system can integrate traffic light control system and route guidance system effectively, and can also strengthen the real - time property and robustness of traffic control system. at the end of this dissertation, the author also gives some suggestion to the further research in these fields

    採用多agent技術的集成交通控制系統框架模型,以分散式模式平衡交通控制網路的計算負荷,提高了誘導子系統與控制子系統的融合程度,也增強了控制系統的魯棒性與實時性。
  17. To reduce the computational load, these multiple linear models are then used as prediction equations in an mpc framework

    為求減輕計算負荷,在模式預測控制架構中,上述之多重模式即可作為預測方程式來程序未來的輸出值。
  18. After the technique reform in 2003, the oracle database system replaced the file system, each data for the process system is saved in the oracle database system, and the oracle net 8 is used for the communication between the process servers. how to design a good database system in process system, and how to tune the oracle system become a important problem for pangan hot strip mill after technique reform. this paper introduce the oracle database application system in pangang hot strip mill process system for architecture 、 designing principle and ways

    熱連軋生產過程是一個快速過程,對過程式控制制系統的響應時間有很高的要求,通常在100至500毫秒級,過程式控制制系統本身的計算負荷又很重,由於oracle數據庫不是一個實時數據庫,如何設一個適應熱連軋過程式控制制的oracle數據庫應用系統,以及如何優化oracle數據庫系統,使其穩定高效的運行,保證熱軋生產的順利進行,是攀鋼熱軋板廠過程式控制制系統改造后急需解決的一個課題。
  19. Compared with the traditional master - slave parallel genetic algorithms, the presented algorithm can efficiently solve the problem of unbalanced distribution of computational load among the slave computers by dynamically adjusting computational load of the slave computers

    相對于常規主從式并行遺傳演法,該演法通過動態調整從機的計算負荷,有效地解決了從機間計算負荷不均衡分佈的問題。
  20. This model may provide valuable inspiration in the implementation of real - time processing and the avoidance of expensive computation cost in machine vision

    並且對這一設在硬體復雜性處理精度和計算負荷方面的平衡進行了討論。
分享友人