設備更新決策 的英文怎麼說

中文拼音 [shèbèigēngxīnjué]
設備更新決策 英文
facilities replacement decisions
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • : 更副詞1. (更加) more; still more; even more 2. (再,又) further; still further; furthermore
  • : Ⅰ形容詞1 (剛出現的或剛經驗到的) new; fresh; novel; up to date 2 (沒有用過的) unused; new 3 (...
  • : Ⅰ動詞1 (作出主張; 決定) decide; determine 2 (執行死刑; 殺死) execute a person 3 (裂開; 斷開...
  • : Ⅰ名詞1 (通「冊」 古代寫字用的竹片或木片) bamboo or wooden slips used for writing on in ancient ...
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  • 更新 : renew; replace; renovate; update; renewal; angenesis; restoration; regeneration; kainogenesis; tu...
  1. As the popularization and application of integrate logistics support engineering thinking at our country industry field and the military continuously, the evaluation of equipment integrate logistics support capability become the mostly means to check up the stand and fall of equipment character of supportable design, the efficiency of the equipment using supportability and the decision - making to equipment ' s continuous model development, at the same time, along with the development and maturity of computer simulation technique, the research of analysing and evaluating equipment ' s effectiveness steps into a new stage, we can get the handle and maintain data on the base of originally lasting accumulating in existence by utilizing the computer emulating technique, which is necessary to analyzing and evaluating the ground - to - ground missile ' s integrate logistics support effectiveness, via simulating the handling and maintaining process of ground - to - ground missile weapon, we can evaluate the ils effectiveness comp rehensively, impersonally, veraciously, consequently, provide decision - making gist to make the best support project

    隨著綜合保障工程思想在我國工業界和軍方不斷普及和推廣應用,裝綜合保障能力的評估成為檢驗裝保障性計好壞、裝使用保障效能高低以及裝后續型號發展的主要手段,同時隨著計算機模擬技術的不斷完善和成熟,裝效能分析與評估研究進入了一個階段,我們可以在導彈武器綜合保障效能分析與評估所需使用與維修數據原始積累的基礎上,利用計算機模擬導彈武器在真實使用環境中的使用維修過程,達到對導彈武器系統的綜合保障能力進行全面、客觀、準確的評價目的,從而為裝保障部門制定最優的保障方案提供好的依據。
  2. The first is capital repair ; the second is modernization rebuilding ; the third is replaced by the facility of alike category ; the fourth is changed by the facility of better technology and better proportion of capability and price. at last, by calculating the sum of consumption of every year, the four decision projects can be compared each other and then % 57 51 ft 59 m make a conclusion

    採用四種方案:第一是對進行大修理;第二是對原進行現代化改裝或技術改造;第三是用相同型號的換舊;第四是用技術先進、性能價格比優的一代換舊
  3. Analysis of decision making on petroleum equipment renewal

    石油設備更新決策分析
  4. At present, the work time of many enterprises " facilities has exceeded their deadline. it is necessary that drawing up renewal decision system of both undertaking safety and combining income

    目前,許多企業的面臨超期服役,制定一套系統既保證安全又兼顧效益就顯得尤為重要。
  5. This paper attempts to analyze renewal decision of facility combining economy with technology

    文本試圖從經濟與技術相結合來分析設備更新決策
  6. The new method of decision about equipment renewal for farming machine in the case of possible arisen new equipment

    可能出現條件下農業機械設備更新決策方法
  7. The thesis concentrates on the design of machinery replacement decision expert system including of knowledge database design, reasoning directions and methods of reasoning machinery, knowledge acquisition method introduction, database programming, man - machine interface and so on

    摘要著重論述了機械設備更新決策專家系統的計過程,包括知識庫的計、推理機的推理方向和方法、知識獲取方法的介紹、綜合數據庫的規劃、人機介面等內容。
  8. Due to the flexible process inside the manufacturing cell, first of all, production cost model is set up, secondly, based on the dynamic pheromone updating, a developed ant colony optimization algorithm is described in detail. with aim to reduce collaboration with the external partners as well as to decrease the total manufacturing cost, and to balance the production process, this algorithm ensures the

    針對單元內部工藝加工路徑可變而具有一定柔性的情況,建立了柔性工藝路線生產單元的系統耗費,給出了採用信息素動態略的蟻群優化演算法步驟,以解保證工件交貨期和保障均勻生產,減少外協量為目標的作業調度問題。
  9. Abstract : in order to improve the appreciation of fixed assets, to increase the utilization ratio of equipment, to decrease the cost, the purchase or rental problems in equipment allocation of construction enterprise are discussed by using investment and decision theory

    文摘:應用投資理論對道路施工企業配置中的是購置還是租賃問題進行分析探討,以促進企業固定資產合理增值,提高的利用率,降低成本。
  10. This paper adopts fmeca method to eliminate and check fault > catch substantive fault then provide basis for maintenance and replacement decision

    本文提出採用fmeca方法進行失效事故的排查,抓住主要矛盾,為維修與提供依據。
  11. Behind the impressive 3d graphic presentations, the git has heralded the change from simple tools for automating plan production to providing integrated design, decision - support and visualization tools for the planners

    它不僅具自動化圖則製作的一般工具程式,地為規劃師提供多項綜合計、支援及視像模擬的程式。
  12. This paper describes the design and function of each module by design principle of modular system. on the basis of the above mentioned, this system takes strong advantages of resource sharing across the internet, updating database, forecasting and decision online

    採取模塊化獨立計原則,給出系統各個模塊的功能分析和計細節,成功地實現了農業機械裝信息的資源共享,數據庫的網路動態,在線動態預測及等。
  13. In this study, we try to build a quantitative model to value the function demand and equipment space for building equipment system in the existing auditorium

    利用電腦模擬計算程式之運算,檢討既有計之可行方法,並針對系統中之主要來進行使用量與空間的探討,以提供日後計的依循。
  14. This system possesses the friendly interface, and stronger knowledge reasoning ability and preliminary self - study ability with the bases of database and model base, the new functions which the old system does n ' t have, have been realized. the system has avoided the wholly renovation of the old equipments in the renovation scheme, while meeting the needs of renovating plan, the cost of pumping station renovation has been reduced. the real supporting of decision making has been provided for pumping station renovation

    該系統以數據庫和模型庫為基礎,具有友好的人機界面,較強的知識推理能力,和初步的自學能力,著重實現了舊系統尚不具的功能,該系統避免了改造方案中對原有的全盤,在滿足泵站規劃要求的同時,降低了泵站改造的成本,真正地為泵站改造過程提供支持,實踐表明,本系統具有較高的實用價值。
分享友人