設備能力 的英文怎麼說

中文拼音 [shèbèinéng]
設備能力 英文
capacity of equipment
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • : 能名詞(姓氏) a surname
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  • 能力 : ability; capacity; capability
  1. The federal power commission licensed 448 projects with 2, 489, 978 installed horsepower capacity between 1920 and 1930.

    在1920和1930年間,聯邦動委員會批準四百四十八項工程,共有二百四十八萬九千九百七十八馬設備能力
  2. Our company possesses 5 senior refriating engineers 1 senior metal technician and is capable of desiging and making diversified refrigerating products for clients. owing to advanced production equipments, our company is dedicated to manufacturing ice frying machine and ice making machine, and remains outstanding in the industry

    我們擁有5名高級製冷工程師和一名高級五金技工,為廣大客戶計不同參數的製冷產品,我們憑借先進的生產打造的炒冰機和製冰機,在此行業中可謂獨樹一帆
  3. Their production plan levels and the characteristics are described, the improved algorithms for production order and mrp that are suitable for the demands of the production in fuda co. are developed. chapter four is focused on production scheduling. the production period planning and capacity planning in production are discussed respectively, and the method how to apply opt in production scheduling to optimize the control of production process is presented

    第四章是混合型生產作業計劃調度控制,首先討論了生產作業計劃調度在生產管理系統中的作用,進而結合富達公司的實際生產情況對生產周期的調度、設備能力的調度分別進行了討論,最後討論如何在生產過程中運用opt思想對生產過程中的「瓶頸」工序進行控制,從而對整個生產過程的關鍵工序和非關鍵工序生產作業計劃調度進行優化。
  4. Model ngf powder feeder with internal gate and leakproofness is a major pulverized coal feeding equipment in combustion system of power plant to feed coal into boiler continuously and evenly

    Ngf型內啟閉無泄漏給粉機是火發電廠鍋爐燃燒系統主要的給粉把煤粉連續、均勻地供給鍋爐燃燒系統。
  5. Electronic co., ltd., a private hi - tech company, professionally makes and markets electronic instruments and gauges, such as digital torque tester, bottle cap torque tester, voltage resistance tester, grounding resistance tester, leakage current tester, insulation resistance tester and etc. lankers quality instruments and gauges are characterized by well - designed structure, high reliability and stability and outstanding performance and are well sold to users in the industries of home appliances, motorcycle, automobile, motor and pharmaceutical

    市藍光電子有限公司是一家集科研生產銷售於一體的高科技民營企業,公司擁有雄厚的技術實,以卓越的,完的工藝控制和完善可靠的檢測手段,向用戶提供高性價比的電子測量儀器。主要產品有:數字扭測試儀系列瓶蓋扭測試儀系列耐電壓測試儀,接地電阻測試儀,泄漏電流測試儀,絕緣電阻測試儀等安規測試儀系列。
  6. This paper describes briefly the measurement of equipment efficiency and equipment capacity and introduces mainly its applications in semiconductor wafer manufactory

    本文針對該問題,系統地介紹了半導體晶圓製造中效率和設備能力的衡量標準及其數據收集,以期達到提高利用率的目的。
  7. With the increasing complexity of the system and quantity of operation, the need of power for equipment is raising day by day. but most of portable flexible robots are difficult to take many facilities

    隨著系統的日益復雜和運算量的日益增加,對計算設備能力的要求也日益提高,而多數輕便靈活型的機器人難以攜帶大量的計算
  8. The key algorithm and idea of the production planning and dispatching based on equipment capacity and optimizing are studied by " start and complete time calculation of working procedure " and " anneal working procedure dispatch "

    以工序開完工時間計算演算法和退火工序演算法為例論述了計劃調度的關鍵演算法和基於設備能力和優先級的計劃編制思想。
  9. Calculation and analysis about the capacity of main heat exchanger in urea plant at high production after coal - gasification renovation

    煤代油改造后尿素裝置高負荷生產關鍵換熱設備能力計算分析
  10. Based on the analysis of features different form general manufacturing job sorting problems, a scheduling model of service is built, a new concept of machine capacity difference is brought forward, a heuristic algorithm considered machine ' s ability difference is developed

    在分析區別於一般製造業生產作業排序特點的基礎上,建立了服務作業的調度模型,提出了設備能力差的概念,給出一個考慮不同加工的啟發式分配法。
  11. Rather, they use the same device capabilities abstraction to infer how a particular view should be rendered

    而是使用相同的設備能力抽象來推斷出應該如何處理某個視圖。
  12. The plant mainly mates gears for three kinds of products manufactured by jingwei stock company, these three kinds of products are : 1. cotton spinning : series spinning frame, comber, rotor spinning ; 2. chemical fibers : drafting twist machine, viscose filament yarn machine, elastic yarn machine in high speed ; 3. weaving machines : series rapier weaving machine

    測算結果表明:合六廠整體生產和九個主要工序生產都不足。通過對上述結果的分析,得出結論:合六廠生產不足,一方面是設備能力確實不足,是客觀原因;另一方面也是其管理方法不當、管理水平不高所致,有其主觀原因。
  13. So the old produce line must be reformed to adopt the needs of the high intensity casing tube produce step by step. the current produce line has many questions to produce the high intensity casing tube. such as different produce manner, the high intensity casing tube is batch - type production, but boiler tube is small scale and they have different process conditions

    該生產線在批量生產高強套管時暴露出了許多問題(因為電站用鍋爐用管一般是小批量、多品種、多規格生產,而高強套管一般是大批量生產,兩者的生產方式差異極大,因此原來用於生產電站用鍋爐用管的生產線現在用於生產高強套管就顯得極不匹配) :如工藝流程不暢、生產低下、工藝不滿足要求、設備能力不匹配、安全隱患多等問題。
  14. But the conventional design way is very complex, and the safety factor figured out with traditional design pattern is a bit of bigger, and this makes against exerting the ability of devices

    然而用傳統的計方法進行計非常復雜、繁瑣、周期較長而且計算結果難免有過大的安全系數,不利於充分發揮設備能力
  15. Measure capability and capacity. analysis capacity and capability

    測算工序和設備能力和生產,分析數據。
  16. Smt equipment capacity

    Smt設備能力
  17. Its production equipment, process technology, production scale and economic benefit rank the top in china

    公司的設備能力、科技水平、生產規模和經濟效益在全國同行業中位居前列。
  18. Special materials / equipment / abilities you will need, and whether you have them yet or not. if not, what help do you still need

    告訴我們你需要的特殊的材料設備能力,以及你是否擁有它們。若否,你還需要怎樣的幫助?
  19. In this article, the writer use qualitative analysis as majority and quantity analysis as supplement, on the basis of making full use of present equipment, we determine the composition, configuration. basic functional and scale reasonably, and take policies and measures of some key problems so as to make a reference for logistic development of xiamen city

    在本文里,筆者以定性分析為主,定量分析為輔,在充分利用現有設備能力的基礎上,合理地確定規劃期物流業發展的構成、布局、基本功、規模與,並提出解決若干關鍵問題的政策與措施,以期為廈門地區物流業的發展規劃起個參考作用。
  20. Section two picks out and analyses the exiting competition competences of the dnec, according to the theory of core competence and the dnec history, culture, organization, equipment capacity, personnel and other conditions

    第二部分,按照核心理論,從企業的發展歷史、企業文化、組織機構、人員狀況和設備能力及其它方面,判斷和分析大連核製造有限公司現有的競爭
分享友人