設備選擇線 的英文怎麼說

中文拼音 [shèbèixuǎnzháixiàn]
設備選擇線 英文
device selection line
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • : Ⅰ動詞1. (挑選) select; choose; pick 2. (選舉) elect Ⅱ名詞(挑選出來編在一起的作品) selections; anthology
  • : 擇動詞(挑選) select; pick; choose
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  • 選擇 : select; choose; opt; election; choice; culling; alternative
  1. By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper

    本文結合常州新閘防洪控制工程水工模型試驗,系統分析了浮箱門在靜水和動水中的穩定性及其影響因素,指出靜水穩性和動水穩性的不同特點;試驗測定了浮箱門動水運行時的受力情況,給出並分析了定位過程轉動力的變化過程曲;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,合理的動力,為計和工程實踐提供可靠依據;分析浮箱門難以穩定上浮的原因,並給出解決方案。
  2. The control system of furnace " s temperature has been widely used in every walk of life, as an important link of repair and manufacture of the electrical equipment such as electromotor transformer etc., soaking lacquer drying craft has some especial requests on drying crafto this article starts with the analysis of drying chamber " s configuration, analyzed its configuration limitation and control function limitation according to the factory " s situation and advances the conception of heated air drying circulation, in addition, this article adopts an intellectualize a / d module, a development sampling tuning - voltage circuit, and presents the method to measure online the insulation resistance of products in order to improve constantly products quality

    而浸漆乾燥工藝作為電機、變壓器等電氣的修理、製造中的重要環節之一,對乾燥過程的質量要求有一定的特殊性。該文從乾燥爐的結構分析入手,聯繫到工廠的實際情況分析了結構功能缺陷和控制功能缺陷,提出了熱風循環乾燥的概念,同時,了較為先進的a d板卡、熱電阻信號調理板等專業化智能卡,運用數字pid控制技術,構成了一個較有特色的計算機控制系統。此外,該文還從保證乾燥品質量的角度,採用智能化交流模塊和自製采樣調壓電路的方法,提出了在檢測產修品的絕緣電阻的方法和手段,以確保企業產品質量不斷提高。
  3. A " real " address, the value that must be placed on the system address bus to select a physical memory bank or device

    物理地址:真實的地址,其值必須被置於系統地址總中用於物理存儲位置或者
  4. Electrical installations of buildings - part 5 - 54 : selection and erection of electrical equipment ; earthing arrangements, protective conductors and protective bonding conductors

    建築物的電氣施.第5 - 54部分:電氣和安裝.接地措施保護導體和保護跨接
  5. Today, the test engineer has many more options, including in - circuit testers, manufacturing defects analyzers, and several types of functional testers

    今天,測試工程師有很多,包括在測試,製造缺陷分析和一些功能測試
  6. This article angle has analyzed the higher professional technical education from cbe / dacum " the electrical control technology " the curriculum ability localization, according to the higher professional technical education " the electrical control technology " the curriculum ability localization, point out the insufficiency and flaw existed in commonly used control electric appliance choice, electrical pilot wire road map, electricity control system installment, wiring craft, electrical control line fault diagnosis system approach, new starting velocity modulation equipment and control circuit, control circuit and main circuit aspect and so on

    摘要本文從cbe / dacum角度分析了高職「電氣控制技術」課程的能力定位,根據高職「電氣控制技術」課程的能力定位,指出了現行高職「電氣控制技術」教材在常用控制電器、電氣控制路圖、電氣控制系統安裝、接工藝、電氣控制路故障診斷的系統方法、新型起動調速及控制電路、控制電路與主電路的連接等方面存在的不足和缺陷。
  7. For bus system installation, the focus is put on cable selection principle, installation process and antinoise measure ; for security protection equipment installation, the intrinsic safety concept, installation method equipment selection and installation under two electric power supply modes ( entity concept and fisco model ) and the bus system protection against surge voltage are illustrated ; for network component installation, the selecting, installing and integrating methods of general purpose terminators, repeaters, link equipment, bus power supply and impedance module are described

    在總電纜的安裝方面,著重討論了電纜的型原則、安裝方法和抗噪防擾措施;在安全保護安裝方面,介紹了總系統中本質安全的概念、安裝方法、兩種供電方式(實體概念和fisco模型)下與安裝以及總系統浪涌電壓的保護和安裝方法;在網路元件的安裝方面,主要列舉了通用終端器、中繼器、鏈路、總電源及其阻抗模塊等的、安裝和集成方法,為總系統的安裝提供了可以借鑒的實用經驗。
  8. Based on these, the 200mw turbine unit of panxian thermal power plant is selected, and the key problems are analyzed, such as, selection of cool medium, flow path of medium, thermal stress during fast cooling etc. the cfd software is adopted, and the maximal thermal stress, the optimum cooling model and system, and the autocontrol scheme during fast cooling, are gotten. in the end, the results are applied in the site. the optimum cooling model and system, and the autocontrol scheme would be provided reference as the other similar units

    於此,本文以盤縣發電廠200mw汽輪機為研究對象,對發電廠汽輪機組空氣冷卻裝置及系統現狀深入分析基礎上,應用cfd軟體數值模擬了不同工況時汽輪機缸壁溫度變化情況,對200mw汽輪機快冷過程中控制指標進行分析,優化機組的快速冷卻過程,合理快冷、系統,優化控制曲,分析最大熱應力值及最佳冷卻方式,同時,對現有盤縣發電廠汽輪機組快速冷卻系統進行優化改進,並進行了實驗與實施。
  9. In this thesis the high voltage electric capacity equipment is adapted as on - line object of monitor and diagnose system. the system ' s structure of high voltage electric equipment is introduced, and the possible to each error occuring in high voltage capacity type equipments during the monitoring, analysis and judgment is given

    本文變電站高壓電容型作為在監測的對象,探討了高壓電氣監測系統的構成,在理論上分析了變電站小四器的絕緣特點,並對其在在監測和故障診斷中可能出現的誤差進行了分析和判斷。
  10. The special features restaurants operate a wide type of cantonese food, northern china - style food, cantonese dim sum, western dishes, chinese or western fashion buffet in different style. banquet hall with first - class simultaneous interpretation services and video and audio facilities. all the conference rooms are equipped with perfect facilities for commercial meetings and internet access, with special digital lines to the internet

    多種的特色餐廳,經營風味獨特的廣東粵菜北方家常菜正宗廣式早午茶西式零點中西式自助餐等不同檔次不同風格的餐飲美食會議室,配置一流的同聲傳譯影音,完善的商務會議施及國際網際網路服務,實現了通過數位專直接上網,這里可接待20 - 200人不等的中小型會議,是商務洽談新聞廣告發布的理想場所。
  11. While with the super hige voltage power network gradually built and the structure of system becoming more complex, the calculation time of optimization increases when the number of buses that need reactive power compensation is relatively large. especially, when the positions of compensation are uncertain, selecting the position of compensation can reduce time when reactive power optimizing

    而且隨著超高壓電網的逐步形成,系統結構日趨復雜,需要安裝無功補償的母比較多的時候,優化計算所需的時間將加長;尤其是在網路補償位置不確定的情況下,無功補償點的就成為無功優化計算前節約時間的有效措施。
  12. Data inputting and graphinputting module respectively achieve data inputting of first system and electric firstwiring diagram inputting ; secondary scheme design module realizes scheme design ofsecondary loops including control, protection, signal, measure, automotive equipment, operation electrical source and electrical source for substation and power distributionstation, using rule - cased reasoning of expert system ; protective relaying settingcalculation module realizes setting calculation for first equipments which aretransformers, circuitries, capacitors, and electromotors ; secondary equipmentselection module realizes type selection of secondary microcomputer integratedequipments ; graph making out module realizes secondary drawings making outautomatically representing design production using case - cased reasoning of expertsystem and the drawings can be edited and modified under the secondary developedautocad environment

    數據輸入和圖形輸入模塊分別完成一次系統資料錄入和電氣主接圖的輸入;二次方案計模塊利用專家系統基於規則的推理實現變配電所各二次迴路的方案計,包括控制、保護、信號、測量、自動裝置、操作電源和所用電源;繼電保護整定計算模塊實現主的整定計算,包括變壓器、路、電容器和電動機;二次型模塊實現二次微機成套裝置的型號;圖形生成模塊利用專家系統基於實例的推理實現代表計成果的各類二次圖紙的自動生成,生成的圖紙可以在二次開發的autocad環境下進行編輯和修改。
  13. This essay stems from the problem with which tianjin port is confronted, contributes to the research method and theory on how to allocate equipment in order to optimize the efficiency of the loading and unloading assembly line. up to now, there is no a ripe method on that above. so, this paper applies optimum method and economics theory, attempts to set up a series of analyzing methods and optimum models to improve the efficiency of dock loading and unloading, and reduce the operating costs, and increases more profits

    本論文從天津港生產中的現實問題出發,結合發達國家港口管理的經驗與中國港口的實際,通過對港口裝卸作業系統地分析,逐步縮小系統的研究范圍,確定提高某一碼頭作業的機械裝卸效率為研究目的,建立一個作業合理工藝流程和配機的數學模型,並提出相應的解法。
  14. The main subject including : the constructure of this mpeg2 encoder ; ~ the principle and the system of tv, also the determination of tv signal ? pcm parameter and the international standard of video pcm ; ? he protocol of pci and the driver of pci device ; the hardware & software design of some corresponding interfaces of mpeg2 encoder, allowing for the working condition, there is some discussing on programming of mater control ; debugging and testing

    主要內容包括: mpeg2編碼器的體系結構;電視原理、制式以及電視信號的pcm編碼參數的和pcm編碼的國際標準; pci總協議標準及pci驅動程序的編寫; mpeg2編碼器的相關介面的具體硬體計和相應的軟體計,結合具體情況,討論了主控編程;硬體調試。
  15. At the same time, essential protective electro circuit is designed for safe. it chooses pc bus industry programmable computer and programmable controller as the host computer and designs two independent systems to control hoist or lower the stage and orchestra separately. for the sake of running safely, it applies ac motor with brake as the power device that adopt frequency conversion mode and inter lock and journey switch in electric circuit

    計中了pc總工業控制機和可編程序控制器作為控制系統的主機,計了兩個獨立的系統分別控制升降舞臺和升降樂池,採用了制動電機作為舞臺升降的拖動裝置,電機的調速方法了可以無級平滑調速、經濟節能的變頻調速方法,並在電氣上採用互鎖和行程開關來保證舞臺機械的安全運行。
  16. And a brake motor is adopted as a towing device of the elevating equipment. the speed governing of the motor is done by stepless speed regulating, which is a energy - saving frequency converting method. besides, interlock and overtravel - limit switch are used in the electric equipment to ensure the safe operation of the stage machinery equipment, in window2000 operating system, the development of the whole controlling system can be accessed with " c + builder "

    計中了pc總工業控制機和可編程序控制器作為控制系統的主機,計了兩個獨立的系統分別控制升降舞臺和升降樂池,採用了制動電機作為舞臺升降的拖動裝置,電機的調速方法了可以無級平滑調速、經濟節能的變頻調速方法,並在電氣上採用互鎖和行程開關來保證舞臺機械的安全運行。
  17. Secondly, this paper analyses data - delivering method, data - transmitting format and fault - control technology, studies and picks out direct sequence spread spectrum, accessing point network topology and the ieee802. 11b network rule, on the basis of which the harbor wireless communication system model is established. each composing part of the system ' s model is given out. the choice of hardware equipments and the design of communication software are expounded

    其次,本文對通信技術中的數據傳送方式、數據傳輸形式和差錯控制技術進行了分析,研究了港口無通信系統中的傳輸方式、拓撲結構和網路標準等關鍵技術,取直序擴頻傳輸方式、接入型拓撲結構和ieee802 . 11b網路標準作為港口無通信系統的技術基礎,建立了港口無通信系統模型,闡述了該模型的實現方法,包括硬體和通信軟體計。
  18. Methods of measurement for radio equipment used in the mobile services ; selective calling and data equipment ; identical with iec 60489 - 6 : 1987

    移動用無的測量方法.第6部分:呼叫和
  19. Back in the network settings screen, select your wireless device as the default gateway device

    返回網路置,你的無作為預網關
  20. At the same time, the program applies the result to the module of verifying the electric devices " stability

    同時該短路計算程序為開發其他功能模塊,如在電氣動、熱穩定校驗以及提供了介面。
分享友人