設定模型 的英文怎麼說

中文拼音 [shèdìngxíng]
設定模型 英文
model specification
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • 設定 : bd/ dvd settings bd/dvd
  • 模型 : 1 (仿製實物) model; pattern 2 (制砂型的工具) mould; pattern3 (模子) model set; mould patter...
  1. On the basis of introducing the principle of the tf / ar radar, this paper analyzes the conditions of effectively jamming the tf / ar radar in typical tactical act of hedgehopping, which include the disposition and quantity of electron reconnaissance / jammer, calculates the capability request of equipments in the method of sensor / hand - emplaced jammer, and concludes that it is difficult to jam tf / ar radar at the present time

    摘要在介紹地形跟隨迴避雷達工作原理的基礎上,通過超低空突防飛機的戰術行動,分析了對雷達實施有效干擾所必須具備的條件,包括偵察干擾機的部署、數量要求等;並計算了在傳感器擺放(投擲)式干擾機式下對裝備的性能要求,得出了在目前技術條件下,對地形跟隨迴避雷達實施干擾在技術和戰術上都是困難的。
  2. 3. the dynamic stability models with complete information and incomplete information of virtual r & d alliance were put up. the administrant and negotiatory organ of virtual r & d alliance was supposed

    3 、建立完全信息條件下和不完全信息條件下r & d虛擬聯盟的動態穩,對穩過程中的管理協調機構作出假
  3. Through detailed investigating, analysing and developing of the evaluation process of the project, the author set up the project ' s budgeting model, initialized the model ' s budgeting quotiety and fixed the quotiety as the model ' s auto - correcting quotiety

    對工程估價流程進行了詳細的調研、分析和開發。建立工程的預算設定模型預算系數,通過分析,將此系數可自我修正系數。
  4. Optimal setting model of reheat furnace temperature

    加熱爐的爐溫優化設定模型
  5. Hybrid modeling and prediction of the dynamic bof steelmaking process

    轉爐煉鋼動態過程預設定模型的混合建與預報
  6. It has been maked for immediate and statistical analysis that the calculation about the work order parameter of the base - bleed - rocket is calculated in the taguchi method, its influencing trend is bring out in the open, the theoretical base is settled for confirming the greatest combination about the work order parameter of the base - bleed - rocket. the multi - objectile optimal design model is established that the indexes have been taked into account first and synthetically, such as physical parameter range lethality power strength and flight stability and so on, the program is compiled and the example is calculated. the true worth of the theoretical work in this paper is validated by flight experimentation of 130mm hybrid base - bleed - rocket extended - range principium projectile

    本文進行了底排?火箭復合增程彈工作時序參數正交試驗計的直觀分析與方差分析,揭示了每個參數對射程計算的影響趨勢,為進一步確底排?火箭工作時序參數值的最佳匹配組合奠了理論基礎;建立了底排?火箭復合增程彈多目標優化,該首次綜合考慮了底排?火箭復合增程彈的結構特徵參量、結構強度性能、飛行穩性、威力性能和射程指標,編制了相應的分析程序,進行了算例計算;完成了130mm底排?火箭復合增程原理樣彈的結構計與飛行試驗,其試驗結果驗證了本文理論研究工作的實際應用價值。
  7. Obtaining from the human resource constitution and the present situation analysis of the salary asignmcnt in jinma company. thorough the thorough research. in view of existing situation. this article asks the main question. which exists in the salany assignment system. in this foundation. from the angle of consummating salary incentive mechanism. it stresses the design of salary system of jinma company. the main content inclwdcs : firstly, research and analysis the salary assignment status quo and the puestions that exists in jinma company ; secondly, establish the decision model of the salary total quantity ; thirdly, design the new pattern of staff salary assignment ; fonrthly, prodme the means of the transition from the old pattern to the new one and the basic principle of the dynamic movement

    本文從金馬公司人力資源構成和薪酬分配現狀分析入手,通過深入研究,針對性地提出薪酬分配體系存在的主要問題。在此基礎上,以現代人力資源管理理論為基礎,從完善薪酬激勵機制這個角度,重點闡述金馬公司薪酬體系計內容。主體內容包括:一是深刻地研究和分析金馬公司薪酬分配現狀及存在問題;二是建立起薪酬總量決;三是計出員工薪酬分配新式;四是給出了新舊式接替辦法和動態運行的基本原則。
  8. The paper introduces the theory of health of urban ecosystem into the study of ecourban in connection of national ecourban building which is now in the ascendant, builds a health evaluation model of urban compound ecosystem according to related studies, using as the standard for judging the level of ecourban building ; decides the multi - index weight of the model by using the method of entropy right, avoiding a subjective judgment which might be caused by the method of subjective evaluation and ; applies the model into living examples of ecourban planning of nanyang city, describes the development level of each sub - system of nanyang city and other cities of henan province, the coordination level among each sub - system and the overall health statement of compound ecosystem in a quantitative way, providing scientific decision - making basis for ecourban building of nanyang city

    摘要針對當前全國方興未艾的生態城市建,將城市生態系統健康理念引入生態城市研究當中,根據相關研究構建了城市復合生態系統健康評價,作為評判生態城市建程度的標準;利用熵權法確中的多指標權重,避免了採用主觀賦值法可能帶來的臆斷性;將評價應用於南陽市生態城市規劃實例中,以量的方式描述了南陽市以及河南省其他城市各子系統的發展水平、子系統間的協調程度以及復合生態系統的整體健康狀況,為南陽市生態城市建提供了科學的決策依據。
  9. Considering that the characteristics of our country ' s highway tunnels are always of long spans, tabular and of various geometry, by means of thorough analysis of the different problems existed in the design of support structures of the tunnels at present, this paper pays special attention to the two key problems, optimization method of form selection of structural section of the tunnel as well as the stability and bearing capacity of the support structures, in the design of the long and large tunnel on high - class highway, introduces the simplified complex - form optimum method in the structure optimization theory, discusses the optimum design model of lining section of highway tunnel with satisfying demands in building clearance, ventilation and load conditions, puts forward an optimization method of form selection of three different kinds of lining sectional forms ( i. e. single - center circle, three - center tabular circle and three - center sharp circle ), establishes a complete set of systematic optimum design the ory and method of long and large tunnel on high - class highway, develops the corresponding computer software used on the planned xuefeng mountain highway tunnel on shaoyang to huaihua expressway in hunan province for optimization of form selections of the structural sections, and obtains a series of relatively reasonable structural design parameters

    本文針對我國公路隧道多為大跨度、扁平、幾何形狀呈多樣化的特點,通過深入分析目前隧道支護結構計中存在的各種問題,抓住高等級公路長大隧道計中隧道結構斷面的優化選及隧道支護結構的穩性與承載能力兩個核心問題,引入結構優化理論中的簡易復合形優化方法,深入探討了滿足建築限界、通風條件、受力狀態約束等條件下公路隧道襯砌斷面優化,提出了三種襯砌斷面形狀(單心圓、坦三心圓和尖三心圓)的優化選方法,建立起一套完善的高等級公路長大隧道的系統優化計理論與方法,並開發出相應的計算機程序,用於擬建的上海至瑞麗國道主幹線湖南省邵陽至懷化高速公路雪峰山長大高速公路隧道的結構斷面優化選,得出了一系列較為合理的支護結構計參數。
  10. 3. according to the principle of the finite element method, the research establishes finite element models of the vibration transportation mechanisms, some model parameters such as the frequency and vibration type are confirmed and validated by the modal analysis, then which analyzes dynamic - state response of the model and confirms the swing distributing of the models, thereby make the design of models precise. 4

    根據有限元法的理論,建立振動機構的有限元力學,對該力學進行態分析,通過態分析確拋秧機振動形態和所需的頻率等參數;然後此基礎上再進行力學的穩態響應分析,研究該態下機構的振幅分佈,以確計的準確性。
  11. An ideal plan model of intelligent long - distance meter reading system was educed based on arm kernel 32 bit microprocessor by introducing embedded software technique, which will accelerate development of long - distance meter reading system in intelligent residential area for the future

    通過對嵌入式軟體技術的具體描述,得出了基於arm核32位處理器的智能遠程抄表系統的理想,對未來智能小區遠程抄表系統發展有一的指導意義。
  12. The methodologies include a series of methods consisting of data collection scenario, data disposal, choosing the appropriate model, model calibration, determining the road weigh, and etc., which are feasible under the infrastructure and technical conditions in the current stage in china, and the real - time factors are also considered

    這是一種在現階段基礎施和技術條件下切實可行的、並且考慮到實時因素的標以出行時間度量的道路權重的方法體系,包括數據採集方案、數據處理、選現有、標、確道路權重的一系列方法。
  13. Besides the design of the hardware construction for shape meter, the software system written in visual basic 6. 0 is also developed. the real - time data acquisition and conversion system worked in interrupt mode is accomplished by means of loading dynamic linkage library of pcl - 812pg enhanced multi - lab card. the converted data processing will be operated then, for example, scale operation, comparison, graphic display, data storage, etc. the adjusting values for the shape control are also calculated in it

    本文在參考大量帶材標準板形、軋制初始量、調節量計算研究的基礎上,確了標準板形設定模型、調節控制等數學;並給出了其相應的演算法;完成了板形儀計算機控制系統的硬體計,並在此基礎上,應用高級開發語言visualbasic6 . 0 ,通過加載pcl - 812pg多功能數據採集卡的驅動程序后,調用動態鏈接庫( dll )中的函數的方法,完成了信號中斷方式下的實時數據採集,採集的數據經計算機作標度變換、對比、圖形顯示、存儲等處理,並提供了用於板形閉環控制的調節量。
  14. The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad, and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure, which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method, which combined linear programming and the principle of full restriction, through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof, horizontal parallel steel truss with local cables, horizontal parallel steel truss with global cable, and ultra - static steel truss, the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss, and the results showed that the local cable only unloaded the second girders, but had no response on the first girders and stomach poles, while global cable could unload the second girders and the stomach poles outside of turning point of cable, thus proving that global cable is more economic than local - cable

    本文的主要工作是:對國內外預應力鋼結構的發展歷史及現狀作了綜述和總結,指出當前預應力鋼結構工程實踐中存在的主要問題;闡述了預應力鋼結構的受力機理,並指出預應力鋼結構的適用范圍和特點;在考慮結構應力和變位約束的條件下,建立預應力鋼結構優化;提出多次預應力鋼結構優化計方法和步驟,採用線性規劃和滿約束準則相結合的優化方法,可優化計出施加的每一級預應力的大小,並得到結構各部分的優化截面;對多次預應力最佳的施加次數作了分析,並建議以2 3次為宜;為驗證文中理論和方法,分別對大跨多次預應力鋼屋架、局部布索的水平平行弦鋼桁架、整體布索的水平平行弦鋼桁架和局部布索的超靜鋼桁架等算例進行了優化計,經濟效益明顯;對水平平行弦鋼桁架的幾種施加預應力的方案進行比較,對于局部布索,預應力只對下弦起到卸載作用,對上弦和腹桿基本不起作用;而整體布索預應力除對下弦卸載外,對索折點以外部分腹桿也起到卸載作用,經濟效益好於局部布索。
  15. In view of the random factors appearing in locomotive operation, such as equipment failure and locomotive defect, the dynamic dispatching emulation for locomotives shall be established and meanwhile its restrictions shall be defined

    考慮機車運用中的備故障、機破等隨機因素,建立機車運用動態調度,確約束條件。
  16. The kinematic performance of the macpherson suspension on a real vehicle is studied, and the changes of the front wheel alignment and the motion of the front wheel in the longitudinal and the transversal directions are figured. based on the requirements of general layout, a constrained optimization design model is set up with the steering cross rod ball joint position as the optimization variables ( design parameters ), and the sum of steering cross rod length interference while the left front wheel turning and bouncing as the objective function. and the optimization results are worked out by programming on computer

    針對一種實際車上的麥弗遜式懸架,計算分析了轉向輪跳動時前輪位角和車輪橫向、縱向滑移量的變化情況,並根據實際車上麥弗遜式懸架的空間布置要求,建立了以轉向橫拉桿斷開點空間位置坐標為優化變量,轉向橫拉桿斷開點空間布置坐標可變化范圍為約束條件,車輪轉向和跳動時轉向橫拉桿長度干涉量為目標函數的約束優化
  17. Case studies on the knowledge model with the data sets of three different sites, nine different variety types, and two different sowing styles indicated a good performance of the model system in decision - making, explanation, and wide applicability

    利用南京、鄭州和保3個地點的常年逐日氣象資料以及各點不同品種和播種方式資料對播栽方案進行實例分析,結果表明,該知識對播期和基本苗計均具有較好的決策性、解釋性和適用性。
  18. In allusion to deficiency of today workflow model simulation analysis, we study workflow simulation and bring forward architecture of workflow model simulation. simulation engine automatically simulates activity execution and pushes model simulation through setting up simulation conditions

    提出了工作流擬的體系結構,通過擬參數,擬引擎自動擬活動的執行,並在最後提供給用戶所需的擬數據。
  19. Having obtained the parameters required in cmpsem, something must be done to test the validity of cmpsem

    設定模型各個參數后, cmpsem就成為一個實證研究。必須對其有效性進行評估。
  20. The optimization design model and solution made designing of multiple pre - stress steel structure be based on theoretical research, which overcame the shortcomings of establishing the value of pre - stress through trial and error and experience. it has instructive importance on optimization theory and important value in practice, and prepared for the optimization design theory of pre - stress steel structure based on reliability

    本文提出的多次預應力鋼結構和解法,使多次預應力鋼結構計建立在系統的優化理論基礎上,克服了已有工程實踐中通過多次試算,按經驗來確預應力值的弊端,對預應力鋼結構的工程實際應用具有重要的理論指導意義和工程應用價值,也為進一步研究預應力鋼結構的可靠性優化計奠了基礎。
分享友人