設站臺 的英文怎麼說
中文拼音 [shèzhàntái]
設站臺
英文
platform-
Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers
由於三峽工程水輪機技術上的復雜性和挑戰性,在左岸電站14臺機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:水輪機設計水頭的確定,負傾角葉片水輪機的應用,兩套水力設計,舍棄初期轉輪,蝸殼進行水壓試驗等。Open raise implies that building work is limited to the raise catwalk and the basis of a simple platform on which drilling personnel stand.
開放式天井,是指那些開挖過程中只需設置天井升降梯道及供鉆工站立的簡單基礎平臺的天井。Many high-gain stations will be deployed on land and ocean bottom.
在陸地和洋底要設置許多高增益的臺站。Stations at kowloon tong, mong kok and university have been equipped with a specially - designed gangplank to assist wheelchair users in boarding and alighting trains at curved platforms
月臺板東鐵九龍塘、旺角和大學車站月臺較彎的位置已設置月臺板。Wang said that handset signals will be available on loop lines and central lines so people will be able to use their communication devices on platforms, underground or in certain areas while the train is in operation
王說,屆時手機信號將覆蓋環線和一線,這樣乘客在地鐵站臺地下運行區間都能使用通訊設備。County roads within the administered area include : route 181 from shanlin to kaoshu section, route 182 from wushantou to jhongpu section, route 183 from nanzih to wujia section, route 183a from fongshan to siaogang section, route 183b from niaosong to fongshan section, route 185 from dajin to fangliao section, route 186 from weisin to dashu section, route 186a from dashe to kupoliao section, route 187 from sandimen to donggang section, route 187a from longchuan to neipu section, route 187b from wanluan to haiping section, route 189 from kaoping bridge to linbian section, route 197 from chihshang to fuyuan section, route 199 from shouka to checheng section, route 199a from dongyuan to hsuhai section, route 200 from hengchun to gangtsai section, route 200a from sinjhuang to gangkou section, penghu route 201, penghu route 202, penghu route 203, penghu route 204, penghu route 205
3 .本處設有高雄工務段,下轄網山監工站鳳山監工站旗山監工站設有潮州工務段,下轄屏東監工站東港監工站設有臺東工務段,下轄利家監工站太麻里監工站成功監工站設有甲仙工務段,下轄小林監工站寶來監工站桃源監工站設有關山工務段,下轄向陽監工站霧鹿監工站關山監工站設有澎湖工務段設有楓港工務段,下轄恆春監工站楓港監工站設有旗山工務所設有里嶺工務所及東濱工務所。It also proposed a radar system to send a warning signal to train drivers whenever an object hits the tracks. the driverless line 14, from st lazare to the new national library, was opened in 1998 and features full - height glass barriers along all platforms with sliding doors that open only when a train has arrived
從聖拉薩爾站開往新國家圖書館站的巴黎地鐵14號線是一條於1998年建成通車的無人駕駛線路,有關部門在其全線各個站臺上均安裝了足夠高的玻璃屏障,其中附設的滑動門只有在列車進站時才會打開。Furthermore, we own a section of special - used railway line of 0. 864km with an available length of 400m as well as 48 platform cargo spaces. additional, the company is equipped with 3 sets of forklifts, crane trucks, and shaoxian cranes each, 8 belt - conveyers of all specifications
高溫保鮮冷庫四棟1250平方米設有一條0 . 864km的鐵路專用線,有效使用長度400m ,站臺貨位48個,叉車汽車吊少先吊各3臺,各種規格皮帶運輸機8臺。Steel structure design for the roof truss of one railway station
某火車站無站臺柱雨棚鋼結構設計We want to see trams along p2, pedestrian crossings at grade at both northern corners of tamar, and street level visual corridors into the city and to the harbour. the mtr island northern line with stations at tamar and hkcec should be publicly confirmed at an early date. " christine loh said in order for the area to attract resident and visitors, the design briefs for the tamar site, including central government offices, legco buildings and public space, need to be drastically altered
小組表示:我們不希望看見添馬艦用地變成平臺,公眾用地必須要拆細發展,讓市民及遊客可隨時享用這些地方,能夠創造不論晝夜或假期都可使用的空間設施是十分重要的, p2道路網亦需要作出改變,我們希望電車能夠支援這個p2道路網,行人道由添馬艦的北面起,通過長廊直達中區及海傍,亦希望地鐵港島北支線可盡快落實,並於添馬艦及香港會議展覽中心設站。Platform screen doors on all platforms promote safety and satisfy environmental concerns
所有車站均設月臺幕門,既安全又環保。Location of stop
站臺設置位置Question 13 : should all part of the platform be natural lighting ? can lighting shaft be established above the platform
站臺是否各處均須自然採光?站臺上方是否可設採光井?The company possesses warehouse of 5496 square meter, goods yard of 1786 square meter, platforms of 1243 square meter, building area of 1904 square meter, 9 15t - 1. 5t automobiles, one 50t electric weight measurer
公司現擁有庫房5496平方米,堆場1786平方米,站臺1243平方米,商業及辦公用房1904平方米, 15噸1 . 5噸載貨汽車9輛, 50噸電子汽車衡一臺等設備設施。With an analysis of the influence of service frequency, the cars organization on the available length of the platform, and the influence of the station, the circumstance control system, as well as the equipment on the scales of station, the author agrues that the station scale shall be reduced by way of increasing the service frequency, cutting down the length of the platform, compressing the structural height of the station, so as to reach the goal of rational distribution of the auxiliary establishments
摘要通過分析發車頻率及列車編組對站臺有效長度的影響,以及車站結構型式、環控系統制式的選取和車站設施的布置對于車站面積的影響,初步探討了縮小車站規模的方法和途徑:提高發車頻率,以縮短站臺有效長度;選擇合理的車站層數來壓縮車站的高度;從環控系統的選取以及各種設施用房的合理布置上來減少車站用房面積。Check - in procedures also emphasise speed and efficiency. there are a total of nine check - in islands with 288 desks in the departures hall
旅客登記手續亦注重效率,離港大堂內設有九個登記站臺,共有288個登記櫃臺,為旅客提供快捷妥善的服務。Aiming at dealing with the passenger flaw outburst during asia game for a metro station ob, the expedite transport capability is theoretically calculated according to different design of station platform and passage way, under island - side and island structure only
摘要針對車站ob應對亞運會期間大規模突發客流疏導問題,利用理論分析的方法計算不同車站設計方案,包括車站一島一側站臺設計和一島站臺設計及不同通道設計時的最大疏運能力。The open project is optimum for the lowest cost. so when air cond itioning system is n ' t necessary in subway station, open environmental control system is optimum. when air conditioning system is necessary, the psd system is better than the closed system
因此,在地鐵車站不需設空調系統時,開式環控方案最優,需設空調系統時,站臺屏蔽門方案優于閉式環控方案。Channel assignment, which is the second part of the design process, is typically carried out so as to minimize co - channel overlap, which reduces interaction between stations in different co - channel cells
指定頻道為設計過程的另一個部份,一般都以減少同道重疊現象為目的,以便減少各同道單元內站臺之間的交互影響。In metro system, if the absorbing resistor of the vehicle absorbs the regenerative energy during the train operation, the problem of temperature rise will occur in tunnel and platform, and this will consequently increase the load of environment control system in station, increase considerably the energy consumption and the construction & operation cost
摘要在城市軌道交通中,如果採用車輛吸收電阻吸收列車運行過程中的再生能量,則將帶來隧道和站臺內的溫升問題,同時也增加了站內環控系統的負擔,造成大量的能源浪費並使城市軌道交通的建設費用和運行費用增加。分享友人