設計和施工 的英文怎麼說

中文拼音 [shèshīgōng]
設計和施工 英文
engineering and construction
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 和動詞(在粉狀物中加液體攪拌或揉弄使有黏性) mix (powder) with water, etc. : 和點兒灰泥 prepare some plaster
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  • 施工 : be in the process of construction; be under construction; build; construction
  1. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下水滲流場及圍巖穩定性的影響所應採取的支護措等方面進行了探索、研究。
  2. A 2 - d fem program is designed to simulate and compute thermal - creep - stress field in a long beam on batholith and taipu river pumping station. some conclusion available in designing and construction are presented

    編制了平面有限元程序,模擬算了巖基上長梁太浦河泵站程的溫度徐變應力場,得出一些對設計和施工有益的結論。
  3. The construction of pearl line will have a good effect on the design and construction of civil architecture and the development about elevated rail transit

    明珠線的建對我國高架軌道交通的土建設計和施工,乃至高架軌道交通的發展起推動作用。
  4. The authors analyze and select landslide parameters by using back analysis method, and consult with the congeneric landslide to determine this landslide parameters, which can offers reference to design and construction department

    用反分析方法對水井坪滑坡參數進行分析選擇,並參照同類滑坡確定該滑坡的參數,為設計和施工單位提供依據。
  5. During recently 3 years, i mainly engaged in mechanical vocation ' s plant planning. i attended 25 projects, which including feasible reports, preliminary designing and working drawing designing, ranged over establishment or technology reforming of machine tool factory, gear factory, tractor factory, automobile manufactory, electric pump factory, electromechanics factory, electric cable factory, the highest investment of them is 160 million yuan, total design work expand over 850 million ( no repeat calculate ). for i have professional ability and well up in developmental situation of mechanical vocation and it ' s situation inside jiangsu province, these projects what i designed were all authorized by leading department and expert, introduced into national plan and bring into operation. these projects bring both economic profit and society profit for the factory ' s technical advancement, product ' s update. as the director of these projects in these designing and consultation work, i generally organize and operate these and earn the higher valuation of leading department and consumer

    近三年來主要從事機械行業,先後參與二十五個項目的可行性研究報告編制,初步設計和施工.涉及機床廠,齒輪廠,拖拉機廠,汽車製造廠,電泵廠,電機廠,電纜廠的新建或技術改造,其中單項投資額最高的為1 . 6億元,總完成投資額為8 . 5億元(未重復算)的作量.由於對機械行業發展狀況省內狀況較為熟悉,具有一定的專業水平,這些項目均經有關領導部門,專家審定列入國家劃,得以實,為廠的技術進步,產品更新換代,生產發展創造較好的經濟效益社會效益.在這些,咨詢中,本人均任項目負責人,全面組織,實作,得到主管部門用戶較高評價
  6. The route choice for fishway should follow the earlier principle and combine the actual situation of the project and decided by reconnaissance and measure of reconnaissance investor, design and constructing unit together

    魚道線路選擇遵循前面的原則,結合本電站的實際情況,由投資方、設計和施工單位共同進行勘察、測量而定。
  7. This thesis takes a typical project - - the natatorium of the sports center, xuzhou normal university - - as a case to study the theory and practice of the design and the construction of the variant steel arched girder

    本文以典型的程? ?徐州師范大學體育中心游泳館為實例,從理論實踐上研究了變異鋼拱架結構的設計和施工
  8. It ' s built for a growing berlin, a city on the move. " the station ' s translucent tubular roof, made up of 9, 117 glass panels, rises above the rest of the government quarter and its 46 metre - high 151 ft twin towers are about 10 metres higher than the reichstag parliament and chancellery

    由於造價高期長,該火車站的建長期以來飽受批評,但不可否認的是,這座建築必將以其出色的設計和施工,成為柏林市「最吸引眼球」的建築之一。
  9. The key technique of this project is the design and construction of four deep - lying long runnels. their length, diameter and maximum bury - depth are 18 km, llm, 2500 m

    這一程的關鍵技術是四條長達18公里、開挖洞徑11米、最大埋深2500米左右深埋長隧洞的設計和施工
  10. Pass through mechanical model calculate, discover the vault and arch foot part in the tunnel secondary lining thickness is weakness part, so at the design and construction must strengthen these part

    通過力學模型算,結構在拱腳與仰拱交接處以及拱頂部位為隧道二次襯砌混凝土結構的薄弱部位,設計和施工時應著重加強。
  11. The job of foundation leveling, factory bound wall building ; scheme and shop drawing designing, the public bidding of the main equipment in domestic and foreign are started

    現正進行土地平整廠界圍墻建、方案設計和施工、國內外主體備招標等項作。
  12. This paper introduces the developing tendency of the space structure and the application of the pretensioned space lattice structure, summarize the analysis method and relation between lattice structure and pretensioned space lattice structure. dissertate the space pole - truss displacement method, tendon working principle, set forth the method of optimal design and whole process design. includes the use stage design and construction stage design of pretensioned space lattice structure

    本文首先介紹了空間結構的發展趨勢及拉索預應力空間網格結構的應用情況,概述了網格結構與拉索預應力空間網格結構的分析方法及其相互關系,論述了空間桿系桁架位移法,拉索作用機理,闡述了拉索預應力空間網格結構的優化及全過程方法,包括拉索預應力空間網格結構使用階段的設計和施工階段的
  13. Because all the stratal configuration in loess ravine region are similar totally, the numerical model in this paper can be modified to suit for other section

    由於黃土溝壑區濕軟地基的地層結構較為類似,依據文中的數值模型可修改相應參數後用于其他相似斷面,為地基處理方案的設計和施工提供依據。
  14. Design department of the group competed independently external appearance and internal decoration design of yuanda center, among which, the design and construction of overhanging steel canopy toped buildings in beijing city. the external wall is composed of high - class granite and glass curtain from brazil, showing splendor of modern building. consisting of steel, glass and stone, the internal decoration incarnates the moving rhyme of 5a grade office building, make it a classic masterpiece in the industry in beijing city

    遠大中心的整體外觀全部內裝修均由我集團部獨立完成,其中「懸挑式鋼結構雨棚」的設計和施工堪稱北京之最,由巴西的皇室高檔花崗巖石材玻璃幕組成外墻,體現了建築的雄偉氣勢,而主要由鋼、玻、石等現代材料精心搭配構造的內裝則體現了5a寫字樓的現代動感,使之成為北京建築行業中的經典之作。
  15. Transportable accommodation units - recommendations for design and construction of the basic unit

    移動式膳宿裝置.基礎裝置的設計和施工的推薦規范
  16. This paper is researched about some arrangement for the design and the construction of the oil factory in south china a present problem such a violent typhoon and heavy raining, thunder and lightning, hot weather, higher humility, earth subside, water corrosion and air corrosion

    摘要根據南方地區存在多臺風、多暴風雨多雷電,高溫高濕度,土壤沉降,水腐蝕氣腐蝕等情況,討論在南方建油廠設計和施工中應對的一些措
  17. The design and construction of obliquely supported high bent for pier cap beams of lu pu bridge

    上海盧浦大橋墩柱蓋梁斜撐高排架的設計和施工
  18. I love my profession and treat it as my life caree, trying to the best in working progress and do good job in team work. studying is the most importing thing to me and it will go with my life

    熱愛專業,具有設計和施工現場經驗,熟悉預算及招投標作,能從容業主交流,欲從事景觀作及相關管理
  19. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出壩體的拱冠梁剖面壩體中心縱剖面的溫度等值線圖、拱冠梁剖面壩體上下游面應力等值線圖、壩肩最大最小應力沿壩高的分佈曲線、不同高程處典型點的最大最小應力值表以及不同高程處最大最小應力值表等成果,為碾壓混凝土拱壩的設計和施工中採取相應的溫控措提供了參考依據。
  20. There has not been a scientific design theory about the jointless bridge whereas it has been conducted successfully for a long time in the u. s. the actual design ways basically depend on the experience and observaration. what is more, the analytical method and the design of the crunodal details are still dealed with on the whole. in fact, it is a very important part to deal with the crunodal structure between the abutment and beam in the design and conduction of the jointless bridge. in addition, the loaded properties of the crunode are the key and difficulty in the study of the jointless bridge. therefor, there are engineering and practical significances of analyzing the crunodal structure and studying its loaded properties

    盡管無伸縮縫橋梁在美國已經成功地使用了很長時間,但至今還沒有一個比較科學的理論。目前的方法基本上依賴于經驗與觀察,還沒有從根本上解決無伸縮縫橋梁有關的分析方法細部構造。應該說,對于無伸縮縫橋梁而言,處理臺與主梁的結點構造是設計和施工中非常重要的部分,結點部分的受力性能是研究無伸縮縫橋梁的重點難點。
分享友人