設計定型試驗 的英文怎麼說

中文拼音 [shèdìngxíngshìyàn]
設計定型試驗 英文
design type test
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  • 試驗 : trial; experiment; test
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施及水工模,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建提供一的參考。
  2. By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper

    本文結合常州新閘防洪控制工程水工模,系統分析了浮箱門在靜水和動水中的穩性及其影響因素,指出靜水穩性和動水穩性的不同特點;了浮箱門動水運行時的受力情況,給出並分析了位過程轉動力的變化過程曲線;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,選擇合理的動力備,為和工程實踐提供可靠依據;分析浮箱門難以穩上浮的原因,並給出解決方案。
  3. Regarding the serious smoke ejection of 75 diesel engine series, this paper points out that this problem could be solved by modifying certain parameters and employing gyrating regression design. the actual experiment on 375 diesel engine series shows that, after innovation, the maximum of smoke ejection of gyrating moment falls by 24. 2 percent, and then the rating is demarcated, the smoke ejection falls by 53. 8 percent

    本文針對75系列柴油機排煙嚴重的問題,通過改變噴油嘴及相關調整參數,利用多因素正交旋轉回歸安排,取得了較好效果.在375柴油機上的實結果表明:進行優化匹配調整后,最大扭矩點煙度下降24 . 2 ,標工況時煙度下降53 . 8
  4. Aiming at the problem that the seeds picked up by the suction plate of the seed metering device cannot accurately fall into the seed pit opener as well as into the seed pit, an innovated seed metering device on which the seed dropping angle can be adjusted within a certain range and a new testing stand have been developed in accordance with the mathematical calculation model that had " in accordance with the mathematical calculation model that had been established previously. then an experimental study is conducted and the seed dropping law has been found out through the study

    本論文根據2bqm - 2氣吸式精量鋪膜播種機的結構和工作原理,針對該機在實際播種中,吸種盤吸出的種子不能滿足準確地落入在膜上滾動開穴的鴨嘴內,並及時地排入到鴨嘴所成的穴孔內的要求,進行了一研究,利用已建立的算數學模新的臺,改進排種器,使排種器的落種角度可以在一的范圍內調整。
  5. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經,為碧流河水庫增建旁通管提供依據。
  6. The tank model with scale of 1 : 5 is built and model test is carried out. by dimension analysis, resemblance between archetype and model is confirmed. 2

    製作了比例系數為1 : 5的罐體結構模;通過對影響平臺罐體受力狀態的各主要物理量的量綱分析,確了模與原結構的相似性;並進行了模
  7. The polymer - geogrid reinforced earth seismic characteristic from the analyse of the fea and the model experiment is a good base of deeply researching polymer - geogrid reinforced earth walls under earthquake and is referable to the preparation for design specification of geogrid reinforced earth walls subjected to seismic loadings

    本文通過有限元方法和模分析得出的土工格柵加筋土動力行為特性,為將來進一步研究塑料土工格柵加筋土擋墻的動力行為特性打下基礎,並將對制土工格柵加筋土擋墻結構規范地震荷載部分有一的參考價值。
  8. But to this day, the design of the wind turbine is still the experience method because of complex computation and device. this method is blind and uncertain

    但是到目前為止,由於算過于繁瑣,模備過于復雜,風力發電機的基本上還是採用經法,帶有很大的盲目性和不確性。
  9. It has been maked for immediate and statistical analysis that the calculation about the work order parameter of the base - bleed - rocket is calculated in the taguchi method, its influencing trend is bring out in the open, the theoretical base is settled for confirming the greatest combination about the work order parameter of the base - bleed - rocket. the multi - objectile optimal design model is established that the indexes have been taked into account first and synthetically, such as physical parameter range lethality power strength and flight stability and so on, the program is compiled and the example is calculated. the true worth of the theoretical work in this paper is validated by flight experimentation of 130mm hybrid base - bleed - rocket extended - range principium projectile

    本文進行了底排?火箭復合增程彈工作時序參數正交的直觀分析與方差分析,揭示了每個參數對射程算的影響趨勢,為進一步確底排?火箭工作時序參數值的最佳匹配組合奠了理論基礎;建立了底排?火箭復合增程彈多目標優化,該模首次綜合考慮了底排?火箭復合增程彈的結構特徵參量、結構強度性能、飛行穩性、威力性能和射程指標,編制了相應的分析程序,進行了算例算;完成了130mm底排?火箭復合增程原理樣彈的結構與飛行,其結果證了本文理論研究工作的實際應用價值。
  10. The lifting - line and lifting - surface design method, the harmonic analysis method based on the panel method, new section design ways, the effective operating curves are integrated into a whole design system of the unsteady propeller, the design system is effective and reliable by the design example, the model test and the application to the full scale ship

    本文把升力線和升力面方法、基於面元法預報螺旋槳非常性能的諧調分析方法,新剖面方法、有效運轉曲線算方法組合為一套完整的非均勻流場中螺旋槳算系統,經實例和模及實船的應用,該系統是可靠且有效的。
  11. Measured results from in - site loading tests in tannin harbor and from in - door model tests were compared with predictions from the limit equilibrium methods. a method of estimating the bearing capacity for inhomogeneous medium was suggested to meet every case ; 4. according to the results from model tests, the elastoplastic fem were performed to study the procession of the change of the stress and strain in inhomogeneous medium and to simulate the procession of the forming of the failure surface during loading, and the failure mechanism was studied ; 5

    4 、結合模結果,確出了符合非均質介質規律的彈塑性模式,在此基礎上分別運用二維、三維彈塑性有限元程序,模擬出了外荷載作用過程中非均質介質內部應力、變形以及破壞面的發展過程,分析得出了非均質介質地基的破壞機理; 5 、在港口工程地基當中,已經引入了可靠度理論算分析基礎穩性。
  12. The open angle, head loss and hydrodynamic pressure under the rated flow and several kinds of proportion are carefully observed in the model test, and these results are given for reference in engineering design

    階段模中詳細觀測了在額流量下,不同比重拍門的開啟角度,水頭損失及門體動水壓力變化情況,以供工程應用參考。
  13. The data got from the shooting tests, conversed by the theory of similitude and eliminated the system errors, were compared with the data from the approval test in the national shooting field. it verified that the full parameters artillery physical simulation theory was right. it verified that the huge rate model design and madding methods were reliable

    把模炮實獲得的數據,按相似理論換算,並消除相似畸變帶來的誤差后,與原炮在國家靶場的結果比較,證明了創建的火炮全參數物理模擬理論的正確性;證明所採取的大比例縮尺模方法和製造手段的可靠性;證明用縮尺的模炮代替副炮進行多項目綜合物理模擬技術是成功的。
  14. Thirdly, to improve the application of light gauge steel structure in our country, some experimentations of institute of new - style steel structure which adopting native productions are induced nally, three - dimensional finite element model is presented. compared with the tests, mumerical results are verified much accurate and efficient, therefore a reliable way is provided to utilize the computational technique adequately to reduce the tests and to utilize the experimental results adequately to improve design quality, ( 3 ) study on floor system. not only adequate strength, stiffness and integer stabilization must be provided, but also insulation, fire and acoustics must be satified

    本文首先論述了lgsfcbw各種破壞模式及其原因,總結了各因素對lgsfcbw抗剪性能的影響,從而為我國引進和應用輕鋼龍骨結構體系奠了基礎;其次從方法和結果三方面探討了國外lgsfcbw抗震性能的研究,並分析該體系的破壞模式和抗震特性、提出研究建議;然後介紹了為推動輕鋼龍骨住宅國產化,我們採用國產材料開展的系列;最後提出了lgsfcbw的有限單元分析法,數值算與結果一致,為充分利用算技術減少數量和充分利用成果提高水平提供了一條可靠途徑。
  15. Abstract : this paper introduces bridge section model tests in the wind tunnel. it presents static forces on bridge section models. the effects of bridge fences, isolation belts and different model lengths on static forces are studied. the static and dynamic stabilities of bridge are analyzed. the results show the effect of bridge fence, isolation belts and different model lengths on static forces should be considered in wind load design

    文摘:通過橋梁節段模風洞測量了橋梁的風力,研究了橋面護欄和隔離帶以及變模長度對模風力的影響,並分析了橋的馳振穩性和顫振穩性.結果表明:方案以及應用結果時應考慮模長度、橋面護欄及隔離帶的影響
  16. With the application of the statistic and decision theory, such as robust design of experiments, calculation of parameter, simulating comparison, optimizing plan and evaluating reliability etc, this plan solves the problem of optimizing the universal examination of the same fuse with several shells in the approval test

    該方案通過對穩健、參數算、模擬比較、方案優化、可靠性評估等一系列決策理論和統理論的運用,解決了多彈種通用引信在設計定型試驗時通用性考核的優化問題。
  17. Using cad technique, the author developed airborne, shipborne and trunk - mounted structural designing templates, created structural designing data base of airborne, shipborne and trunk - mounted electronic equipments and realized the parameterizing modular design. the typical experiment of a project indicated that the cad structural designing system is practical and it has been playing an important role in the structural design in the project

    文中利用cad技術開發了機載、艦載、車載三種結構模板,編制了機載、艦載、車載電子備結構資料庫,並實現了機櫃參數化模塊,通過某項目設計定型試驗表明,本cad結構系統是實用的,並在某項目的結構中發揮了重要作用。
  18. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉電廠二期工程中的三根樁的靜載進行了分析和研究,利用樁土體系荷載傳遞分析算的基本微分方程及應力-應變轉換原理,結合預埋電測元件的樁身率,對三組不同種類、不同施工工藝、不同持力層中的樁的豎直、水平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同樁在豎直、水平荷載作用下的應力變化規律和樁身變位、撓曲變化規律,最終提供場地土層和樁的承載特性,為該工程合理提供了可靠的參數,為確科學的施工工藝提供了有力的依據。
  19. Carry on a large amount of experiment and analysings, the result of calculation of designing has been verified, the error of designing and computing has been revised, the physical dimension of the rivet has been confirmed finally. combine the real working condition of the factory the difficulties that the rivet stem and the locking collar are difficult to process are solved, a series of feasible technology schemes are made finally. according to the designing and of the test of the blind rivet, consult the relevant standards of u. s. a., the relevant aviation industrial standards which lay the foundation for the popularizaion and application of the rivet are compiled

    本文通過系統分析及算,突破了鉚釘抽鉚成形、剪斷環及時被剪斷、芯桿到位及時拉斷等一系列技術難點,確方案,運用有限元方法對機械鎖緊鼓包抽芯鉚釘進行了強度分析:制方案,證了算結果,修正了算所造成的誤差,確了鉚釘的結構尺寸;結合工廠的實際生產條件,解決了釘桿和鎖圈難以加工的困難,制出?系列可行的工藝方案:根據結果,參照美國的相關標準,編制了系列航空工業標準,為機械鎖緊鼓包抽芯鉚釘的推廣應用打下了基礎。
  20. A solid - waste containment system can be simplified as a slope which contains a layer of geomembrane ( which is simplified as interlayer slope in the rest part ). shaking table model test and numerical analysis have been done to study the seismic stability of interlayer slope based on the two - part wedge theory in this paper. many factors which affect the slope stability ratio, including horizontal seismic coefficient, slope angle, soil - geomembrane interaction coefficient, slope length, layer thickness and soil character, have been took into consideration

    填埋場防滲基坑的邊坡可以簡化成含土工膜夾層的土坡(以下簡稱夾層土坡) ,本文根據「雙滑楔體」理論思想,對夾層土坡的地震穩性問題進行了較為系統的模和數值分析,著重考慮了水平地震系數、夾層土坡坡角、土工膜與覆蓋層土體摩擦系數、夾層邊坡長度和厚度、夾層土坡覆蓋層土體性質等因素對土坡安全系數的影響,並對地震作用下夾層土坡的永久變形進行了初步的研究,給出了對實際工程有參考價值的結論。
分享友人