設計工作點 的英文怎麼說

中文拼音 [shègōngzuòdiǎn]
設計工作點 英文
design duty point
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  1. With the use of new mcu p87c591, as the techiniques of serial communication and negative display of lcd, the dashboard has a very beautiful apearence and the system is simplified. not only the analogy signal and the pulse signal can be sampled into the instrument, but also the datum on the can - bus should be transferred into the system whit the connection to the in - vechile network. under the guindance of the idea of " informatic design ", the digital lcd dashboard system is developed, and the professional manufacturer of lcd display device is directed to develop and to design the special lcd module, by which the new lcd production is greatly optimized. all these intentions bing about a very well goal

    在研製數字液晶儀表過程中,應用了新型單片機p87c591 、串口驅動技術和負顯技術,使該數字液晶組合儀表結構簡單,視覺美觀,既可以通過模擬通道、數字通道測量車輛傳感器的信號,又具備接入車輛總線、從can總線上獲得相關數據的能力。在項目開發過程中,運用「信息化」的觀開展液晶顯示模塊的開發和;並根據軟體程的原則,優化了液晶模塊的電路,使該項產品的開發取得了好的效果。
  2. This paper probes into some divergent problems in the fire - control design, such as the distribution of high position fire protection water tank in the high buildings, the fire - hydrant configuration and fire - control design of the high - rise building with commercial service center

    就消防中一些有分歧的問題,如高層建築群中高位消防水箱的置、消火栓的配置、有商業服務網的高層住宅消防等問題進行了探討。
  3. It is introduced the structural design, working principles and performance of the four circuits of the module, i. e. synchronous circuit, trigger - transmitter circuit, clipping - amplifying - detection circuit and gain control circuit

    文中主要介紹了構成該電路模塊的同步電路、觸發發射電路、限幅放大檢波電路、模塊增益調節電路等4種電路的結構原理及性能特
  4. In the end, based on the experience of my software design practice in sichuan telecom operation and supporting system, some software application ( software architecture based on j2ee, iterative development and usecase - prioritizing, organizing requirement based on usecase, and round - trip engineering ) is recommended in detail with large numbers of example pictures

    最後根據本人參加的「四川省電信綜合營銷支撐系統」 (新97 )項目開發過程中進行分析的一些實踐感悟,重探討了上述主要面向對象技術的實踐應用,包括集成case具的軟體開發環境、以用例為核心組織需求、迭代式開發與用例的優先級劃分、雙向程的應用和基於j2ee的系統軟體架構等項目實踐內容。
  5. Based on in - depth analysis on characteristic and function principles of psd, combined with characteristic of measured object, this article presents an new real - time measurement for symmetrical degree, guiding - groove, twining angle, inside radius of long direction pipe ; completes designing work for hardware of function module and application software ; and gives analysis and computation on error sources and uncertain - degree of measure result. based on above work, this article develops a parameter - auto - chosen, integrated and automatic measurement device for beeline degree, guiding - groove symmetrical degree, twining angle and inside radius of long direction pipe

    本文在深入分析研究psd的特原理的基礎上,結合被測量對象的特,首次提出了長定向管導槽對稱度、纏角、內徑等實時自動化測量的一種新方法;完成了硬體功能模塊及應用軟體的;並對測量結果的誤差源及不確定度進行了分析和算;在此基礎上研製了長定向管的直線度、導槽對稱度、纏角及內徑等參數自動、實時綜合測量備。
  6. An example of the work of the studio, and their site and its residents. ( images courtesy of mit architecture and urban design studio

    坊的成果、所挑選的地以及其居民(圖片由麻省理建築與都市坊授權) 。
  7. Design studio - the next generation catalog based virtual design software for point of sale in the furniture and tiling industry

    室- -下一代目錄虛擬軟體的拓展在個人以及業上。
  8. The speed development process is a tailored rup process, direct to the business logic, and some xp practices are imported. it can avoid the over - engineer of rup and avoid completely depending on the source code, which is the character of xp. the process is divided into three core workflows

    本文提出的快速開發過程是一種經過裁減的rup過程,採用分散式對象技術直接對業務邏輯編程,在中以軟體體系結構為目標,並在過程中引入了xp的若干實踐方法,因此它可以避免rup過分的缺和避免xp完全依靠源代碼的缺
  9. As to the tunnels of jinping hydroelectric power station in sicuan province, the thesis discusses how to reasonably consider the initial stress field when designing a large - scale tunnel with high initial stress and deep buried. first, by analyzing of the rock lab tests and discusses the feature of regional geomorphology. explains the production of initial stress field, analyze the initial stress of jinping hydroelectric power station ; second, using the fem, the paper creates the real model of region. according to the results of stress measurement point, by combining of ann and fem to decide the boundary condition, the paper calculates the initial stress field ; at last, the paper analyzes the influence of the initial stress field formed from different condition on the deformation and stress of the surrounding rock, and the main factor to influence the initial stress. on the basis of the former work, the author proposes some proposals, which will be helpful for studying and designing of the similar undergroun d engineering

    首先從巖體的應力?變形的特性入手,並結合程區域的地形地貌特徵,對巖體初始地應力場的形成做出解釋,結合錦屏水電站初始地應力的現狀提出了將地應力場進行分帶;然後建立整個程區的實體模型,在地質分析的基礎上,以程區右半部分為代表,參照實測的初始地應力值,採用了神經網路與有限元相結合的方法反演了該區域的初始地應力場;最後模擬隧洞的開挖,通過算比較分析了初始地應力場對處于不同應力帶內的隧洞圍巖穩定性的影響,在此基礎上提出了者的建議,力圖為該類程的研究提供有益的幫助。
  10. On general planing of museums exhibitions

    關于陳列總體的幾隨想
  11. Designing of special packing case is characterized by complicated structure, high quality requirement, much workload and serial designing. in this paper, author develops the special packing case cad system aiming at the characteristics

    本文基於ug三維cad平臺,針對我所產品專用包裝容器結構復雜、要求高、量大、已形成系列化等特,開發出專用包裝容器三維建模系統。
  12. In the end, the controller was designed by the method of pole placement and tested by simulation and experiment

    最後,用極配置方法完成了控制器的,並進行了控制系統的模擬及實驗研究。
  13. Having a professional designer do it for you is a possibility, but the good ones will put craters in your bank account, and you always have to pay for future graphical updates to your site which is a hassle, not only financially, but if you need important changes made immediately there ' s a good chance it ' s going to happen on the designer ' s schedule

    你可以請一個專業的師為你來完成,但是這成本太高了,而且將來的站圖形更新等等也是要收費的;這還不僅僅是財務上的事,如果你需要對網站做重大改變,那麼你必須重新支付師的費用。
  14. Can speak, and do getting well calculating analysis and the application of data to fortune capacity that being is in progress that the traffic is build and the design is worked starts a little, and is the foundation that project item construction scope and operation were economically appraised, is evaluation essential factor and the key of item risk

    可以說,做好對運量預測數據的分析和應用,是進行交通建的起步,是程項目建規模和運營經濟評價的基礎,是項目風險的評價要素和關鍵。遠期預測客流是一個變動較大的變量,對預測的準確性來說難以保證。
  15. Consequently, an integrate switch mode power supply with high efficiency and good reliability can be realized by the controller with very few external parts. the fundamental principle of monolithic voltage - mode switching regulator is firstly introduced in this thesis, which is followed by a comparison between voltage - mode and current - mode converters where the pros and cons of both converters are discussed in detail ; next, the global system architecture is proposed upon the design requirements and sub - block circuits are also introduced that focuses on several essential sub - blocks such as amp, wave, pwm control, psc, osc and vref. finally, all sub - circuits and the whole chip circuit are simulated by hspice whose results indicate that the circuit function and performance have perfectly satisfied the design requirements

    在論文中,首先闡述了電壓控制模式pwm開關電源的基本原理,對比了電流控制模式和電壓控制模式,分析了各自的優缺;隨后根據要求進行了電路的總體,完成了各個子電路的原理分析,電路和模擬驗證,重闡述了誤差放大電路、三角波發生電路、 pwm控制電路、節能控制電路、振蕩電路和基準源電路的分析、和驗證過程;最後,利用eda軟體hspice對整體電路進行了功能模擬驗證,模擬結果表明,本文完成了,達到要求。
  16. Concurrent engineering and agile manufacturing are the production manners in the 21 centuries. networks supported cooperative design, nscd, is an important part of concurrent engineering. it is necessary that managers, designers, manufacturers and users are able to participate in the design at different places synchronously or asynchronously

    并行程及敏捷製造是21世紀的生產模式,網路支持的協同是并行程的重要組成部分,其必要性在於使不同地的管理人員、人員、施人員以及用戶都能同步或異步地參與,從而加快進度和提高質量。
  17. It is necessary to adopt several methods to verify the calculation of pmf according to the given project, it is important to select right method and appropriate calculation

    因此,根據程的具體情況,選擇採取的方法和算結果是的重
  18. The thesis also introduces the author ' s research work including implementation of a single - chip system based synchronous - meter successfully utilized in marine engine room simulator dms - 2000 which belongs to one key " 211 project " of dlmu : " engine room simulator adopted virtual reality " ; the realization of software interface on " autochief - 4 ship main engine remote control system " ; and the designing and realization of the hardware and software of autopilot for " ship hybrid intelligent control system "

    論文介紹了者結合參加我校「 211程」重項目「應用虛擬現實技術的輪機模擬器」的,研製完成了「船舶電站並車同步表」並在dms - 2000新型船舶輪機模擬器中獲得成功應用。者還討論了結合參加導師的科研項目所完成的「 aotochief - 4船舶柴油主機遙控系統」的模擬軟體界面和「船舶混合智能控制系統」課題中的硬軟體
  19. Transmission line design is a complex system project with large investment. based on data provided by digital transmission network, and combined with the genetic algorithm, the thesis puts forward a general optimization method to deal with the difficulties in transmission line design, which are path and pole selection of the transmission line. synthetically contemplating all kinds of environmental and anthropogenic factors, the method has great pragmatic meaning in saving cost of design

    輸電線路是一項投資巨大且相關因素復雜的系統程,本文基於「數字輸電網路」提供的信息數據,結合遺傳演算法,對線路中的難? ?路徑選擇和桿塔定位提出了全新的全局優化方法,該方法綜合地考慮了各種環境及人為因素,對節約成本、提高的科學性具有很大的現實意義。
  20. The author has also analysed some models which are popular in the international financial community their merits and demerits

    分析、研究了目前在國際金融界流行幾種項目融資結構模式的及其優缺、適用范圍。
分享友人